• Tidak ada hasil yang ditemukan

Willmott Peter, McCharty Dennis, 2001, TPM A-Route to World Class Perfomance, London, Butterworth Heinmann.

N/A
N/A
Protected

Academic year: 2021

Membagikan "Willmott Peter, McCharty Dennis, 2001, TPM A-Route to World Class Perfomance, London, Butterworth Heinmann."

Copied!
23
0
0

Teks penuh

(1)

 

 

Ananto, Dedy, 1997, Perancangan Ulang Sistem Penerapan Total Productive

Maintenance, Bandung, Institut Teknologi Bandung.

Bisnis Indonesia, 2005, Pindad Kewalahan Penuhi Permintaan Dalam Negeri, 7 Juli,

Dikutip 25 Februari 2008 dari

http://www.bppt.co.id/halamandepan/indexberita/tekindustrihankam.

Cato W. William, Mobley Keith R., 2001, Computer-Managed Maintenance Systems: A

Step-by-Step Guide to Effective Management of Maintenance, Labor, and

Inventory, Elsevier Science & Technology Books.

Gertsbakh, I.B., 1977, Models of Preventive Maintenance, Amsterdam, North-Holland

Publishing.

Jardine, A.K.S., 1973, Maintenance, Replacement and Reliability, London, Pitman

Publishing.

LKBN Antara, 2007, PT Pindad Tak Keberatan Pembelian Tanpa Pihak Ketiga, Dikutip

18 April 2007 dari

http://www.antara.co.id/arc/2007/4/18.

Miller, Erwin & Freud E. John, 1977, Probability and Statistical for Engineers, New

Delhi, Prentice-Hall.

Departemen Pemeliharaan Mesin PT. Pindad, 2007, Profil Departemen Pemeliharaan

Mesin PT. Pindad, dokumen yang tidak dipublikasikan.

Divisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT.

Pindad, dokumen yang tidak dipublikasikan.

Govil, A.K., 1983, Reliability Engineering, New Delhi, Tata McGraw-Hill.

Hawkins Bruce, Kister Timothy C., 2006, Maintenance Planning and Scheduling :

Streamline Your Organization for a Lean Environment, London, Butterworth

Heinmann.

Hermasari, Emma, 2007, Audit Budaya Divisi Permesinan dan Jasa PT. Pindad,

Bandung, Institut Teknologi Bandung.

(2)

Kinerja Perusahaan Dengan BSC di PT. Pindad, Bandung, Institut Teknologi

Bandung.

Nakajima, Seichi, 1988, Introduction to TPM, Massachusetts, Productivity Press.

PT. Pindad, 2007, Brosur PT. Pindad, Bandung.

PT Pindad, 2007, Profil Perusahaan, Dikutip April 2007 dari

http://www.bumn-ri.com/pindad.

Willmott Peter, McCharty Dennis, 2001, TPM A-Route to World Class Perfomance,

London, Butterworth Heinmann.

 

 

 

 

 

 

 

 

(3)

LAMPIRAN A 

(4)

Data Kerusakan Mesin 1 CNC Sincom E 32 K Tahun 2004

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

11/01/04 8.00 BM 11/01/04 8.00 11/01/04 8.00 11/01/04 9.30 11/01/04 9.30 13/01/04 8.00 BM 13/01/04 8.00 13/01/04 8.30 13/01/04 9.00 13/01/04 9.00 08/03/04 14.00 BM 08/03/04 14.00 10/03/04 14.00 16.00 15/03/04 16.00 27/03/04 21.00 BM 27/03/04 8.00 27/03/04 8.00 27/03/04 12.00 27/03/04 12.00 03/04/04 8.00 CM 03/04/04 9.00 03/04/04 9.00 03/04/04 15.15 03/04/04 16.15 06/04/04 13.25 CM 06/04/04 13.45 06/04/04 14.00 06/04/04 15.30 06/04/04 15.30 21/04/04 15.00 BM 21/04/04 15.00 21/04/04 15.00 21/04/04 15.20 21/04/04 15.20 06/05/04 8.00 BM 08/05/04 8.00 08/05/04 8.00 15.00 15/05/04 16.00 17/05/04 9.00 BM 17/05/04 9.00 17/05/04 9.00 17/05/04 9.45 17/05/04 9.45 21/05/04 9.00 BM 21/05/04 9.00 21/05/04 9.00 9.30 23/05/04 9.30 27/05/04 13.30 BM 27/05/04 13.30 27/05/04 8.00 27/05/04 9.00 27/05/04 9.00 29/05/04 8.00 BM 29/05/04 8.00 29/05/04 8.00 29/05/04 10.25 29/05/04 10.25 24/07/04 8.00 BM 24/07/04 8.00 24/07/04 8.00 24/07/04 10.00 24/07/04 10.00 14/08/04 8.00 BM 15/08/04 8.00 15/08/04 8.00 9.30 16/08/04 9.30 23/08/04 10.00 BM 23/08/04 10.00 24/08/04 10.00 24/08/04 11.00 24/08/04 11.00 04/09/04 8.00 CM 05/09/04 8.00 05/09/04 8.00 05/09/04 9.00 05/09/04 9.00 11/09/04 8.00 BM 11/09/04 8.00 8.00 15..00 11/09/04 16.00 01/10/04 9.15 BM 01/10/04 9.30 02/10/04 9.30 02/10/04 10.00 02/10/04 10.00 04/10/04 7.45 PM 04/10/04 7.45 04/10/04 7.45 9.00 31/10/04 9.00 01/11/04 14.30 BM 01/11/04 14.30 01/11/04 14.30 01/11/04 15.30 01/11/04 15.30 11/11/04 7.45 PM 11/11/04 7.45 11/11/04 7.45 11/11/04 16.30 18/11/04 7.45 BM 18/11/04 7.45 18/11/04 7.45 20/11/04 14.00 08/12/04 8.00 BM 08/12/04 8.00 08/12/04 8.00 08/12/04 12.00 08/12/04 12.00

(5)

12/01/05 8.30 CM 12/01/05 8.30 12/01/05 8.30 12/01/05 9.00 12/01/05 12.00 06/02/05 8.30 BM 06/02/05 8.30 06/02/04 13.00 06/02/05 16.00 06/02/05 12.00 08/02/05 8.30 BM 08/02/05 8.30 08/02/04 8.00 08/02/05 15.30 08/02/05 12.00 11/02/05 8.30 BM 12/02/05 8.30 12/02/04 8.00 12/02/05 15.30 12/02/05 12.00 17/02/05 13.00 BM 17/02/05 13.00 17/02/04 13.00 17/02/05 14.00 17/02/05 14.00 29/03/05 9.15 BM 29/03/05 9.15 29/03/04 9.15 29/03/05 9.30 29/03/05 9.30 30/03/05 8.00 CM 30/03/05 8.00 30/03/04 8.00 30/03/05 15.00 30/03/05 16.00 02/04/05 15.45 PM 02/04/05 16.00 02/04/04 8.00 02/04/05 9.00 02/04/05 9.00 14/04/05 8.00 CM 14/04/05 8.00 14/04/04 8.00 14/04/05 8.30 14/04/05 8.30 18/04/05 8.00 bm 18/04/05 8.00 18/04/04 13.00 18/04/05 14.00 18/04/05 14.00 20/04/05 8.00 CM 20/04/05 8.00 21/04/04 8.00 21/04/05 8.30 21/04/05 8.30 27/04/05 8.00 BM 27/04/05 8.00 27/04/04 8.00 27/04/05 15.00 27/04/05 16.00 13/05/05 14.00 BM 13/05/05 14.15 13/05/04 15.00 13/05/05 16.30 13/05/05 16.30 17/05/05 8.00 BM 17/05/05 8.00 17/05/04 8.00 17/05/05 15.15 17/05/05 16.15 23/05/05 21.30 BM 23/05/05 8.00 23/05/04 8.00 23/05/05 9.00 23/05/05 9.00 27/05/05 8.20 BM 27/05/05 8.30 27/05/04 9.00 27/05/05 12.00 27/05/05 12.00 04/06/05 22.30 BM 04/06/05 8.00 04/06/04 8.00 04/06/05 12.30 04/06/05 12.30 16/06/05 7.35 BM 16/06/05 7.35 16/06/04 7.35 16/06/05 9.00 16/06/05 9.00 08/08/05 10.00 BM 08/08/05 10.00 08/08/04 10.00 08/08/05 12.00 08/08/05 12.00 12/09/05 00.00 BM 12/09/05 7.30 12/09/04 7.30 12/09/05 15.30 12/09/05 15.30 20/09/05 8.00 PM 20/09/05 8.00 20/09/04 8.00 9.00 30/09/05 9.00 03/10/05 18.00 PM 03/10/05 8.00 03/10/04 8.00 12.00 04/10/05 12.00 18/10/05 13.30 BM 18/10/05 13.30 18/10/04 13.30 18/10/05 13.45 18/10/05 13.45 21/10/05 15.30 BM 21/10/05 15.30 21/10/04 15.30 21/10/05 14.15 21/10/05 16.45 24/10/05 13.30 BM 24/10/05 13.30 24/10/04 13.30 25/10/05 10.00 18/11/05 8.30 BM 18/11/05 8.00 18/11/04 8.00 18/11/05 10.10 18/11/05 16.00 30/11/05 1.30 CM 30/11/05 8.00 30/11/04 8.00 30/11/05 9.00 30/11/05 9.00 15/12/05 8.00 BM 15/12/04 8 15/12/04 8 15/12/05 8.25 15/12/05 8.25

(6)

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima 04/01/06 7.30 CM 04/01/06 7.30 04/01/06 7.30 04/01/06 9.30 04/01/06 9.30 04/01/06 8.00 CM 04/01/06 8.00 22/01/04 8.00 22/01/06 11.00 30/01/06 11.00 04/01/06 14.00 CM 04/01/06 14.15 25/01/04 8.00 25/01/06 30/01/06 16.30 04/01/06 7.40 CM 04/01/06 7.40 26/01/04 7.40 26/01/06 15.45 30/01/06 16.45 17/01/06 7.30 BM 17/01/06 7.30 17/01/04 7.30 17/01/06 8.30 17/01/06 8.30 19/01/06 1.30 BM 19/01/06 9.00 19/01/04 9.30 19/01/06 12.00 19/01/06 12.00 06/02/06 14.30 BM 06/02/06 14.30 06/02/04 14.30 06/02/06 15.45 06/02/06 15.45 20/02/06 14.15 BM 20/02/06 8.00 20/02/04 8.00 21/02/06 21/02/06 16.30 10/03/06 00.00 BM 10/03/06 7.30 10/03/04 7.45 10/03/06 11.35 10/03/06 11.35 26/03/06 7.30 BM 26/03/06 7.45 26/03/04 8.00 26/03/06 26/03/06 16.45 02/04/06 10.00 CM 02/04/06 10.00 02/04/04 10.00 02/04/06 10.30 02/04/06 10.30 11/04/06 9.30 BM 11/04/06 9.30 11/04/04 9.30 11/04/06 10.00 11/04/06 10.00 19/04/06 7.45 BM 19/04/06 8.00 19/04/04 8.00 19/04/06 8.05 19/04/06 8.05 13/06/06 3.00 PM 13/06/06 7.15 13/06/04 7.30 13/06/06 26/06/06 12.00 24/06/06 16.00 BM 25/06/06 16.15 25/06/04 8.00 25/06/06 12.00 25/06/06 12.00 20/07/06 13.30 BM 20/07/06 13.30 20/07/04 15.00 20/07/06 16.15 20/07/06 16.15 02/08/06 8.00 BM 03/08/06 8.00 03/08/04 04/08/06 04/08/06 15.15 09/08/06 0 CM 09/08/06 0 09/08/04 8.00 09/08/06 15.30 09/08/06 16.30 23/08/06 8.00 BM 23/08/06 8.00 23/08/04 8.00 23/08/06 23/08/06 14.00 29/09/06 0 CM 30/09/06 0 30/09/04 7,45 30/09/06 15.30 30/09/06 16.30 02/10/06 7.45 BM 02/10/06 7.45 02/10/04 7.45 02/10/06 02/10/06 16.00 05/10/06 9.00 CM 06/10/06 9.00 06/10/04 9.00 06/10/06 06/10/06 13.30 07/10/06 14.30 BM 07/10/06 14.30 07/10/04 14.30 07/10/06 16.45 07/10/06 16.45 18/10/06 15.30 BM 18/10/06 15.30 18/10/04 15.30 24/10/06 16.45 04/11/06 13.30 PM 04/11/06 13.30 04/11/04 13.30 14/11/06 10.00 10/12/06 8.30 BM 12/12/06 8.00 12/12/04 8.00 13/12/06 16.00

(7)

20/01/04 8.00 BM 21/01/04 8.00 21/01/04 8.00 21/01/04 8.10 21/01/04 8.10 25/02/04 8.00 BM 25/02/04 8.00 25/02/04 8.00 25/02/04 12.00 25/02/04 12.00 30/03/04 10.00 cmwo 30/03/04 10.00 30/03/04 10.00 30/03/04 11.00 30/03/04 11.00 01/07/04 10.30 BM 01/07/04 10.30 01/07/04 10.30 01/07/04 12.00 01/07/04 12.00 05/07/04 16.00 BM 05/07/04 8.00 05/07/04 8.00 05/07/04 15.30 05/07/04 16.30 23/07/04 9.40 BM 23/07/04 9.40 23/07/04 9.40 23/07/04 10.15 23/07/04 10.15 26/07/04 8.00 BM 26/07/04 8.00 26/07/04 8.00 26/07/04 26/07/04 16.30 07/08/04 8.00 BM 07/08/04 8.00 07/08/04 8.00 07/08/04 15.30 07/08/04 15.30 09/08/04 14.30 BM 11/08/04 14.30 11/08/04 14.30 11/08/04 16.00 11/08/04 16.00 18/08/04 3.00 BM 18/08/04 8.00 19/08/04 8.00 8.30 27/08/04 8.30 28/08/04 8.00 cmwo 28/08/04 8.00 28/08/04 8.00 28/08/04 28/08/04 16.30 30/08/04 2.30 BM 30/08/04 8.00 30/08/04 8.00 30/08/04 15.30 30/08/04 16.30 01/08/04 8.00 BM 01/08/04 8.00 01/08/04 8.00 01/08/04 01/08/04 16.35 15/09/04 8.00 BM 15/09/04 8.00 15/09/04 8.00 15/09/04 15/09/04 16.35 21/09/04 8.00 BM 22/09/04 8.00 22/09/04 8.00 22/09/04 14.00 22/09/04 15.00 30/09/04 8.00 BM 30/09/04 8.00 30/09/04 8.00 30/09/04 9.30 30/09/04 9.30 06/10/04 7.30 BM 06/10/04 8.00 06/10/04 8.00 06/10/04 9.45 06/10/04 9.45 22/10/04 8.00 BM 22/10/04 8.00 22/10/04 8.00 22/10/04 8.45 22/10/04 8.45 27/10/04 8.00 PM 27/10/04 8.00 27/10/04 8.00 29/10/04 16.00 04/11/04 7.30 BM 04/11/04 7.30 04/11/04 7.30 04/11/04 8.00 04/11/04 8.00 05/11/04 8.00 BM 05/11/04 8.00 05/11/04 8.00 05/11/04 11.00 05/11/04 11.00 11/11/04 9.00 BM 11/11/04 9.30 11/11/04 13.00 11/11/04 14.00 11/11/04 14.00 03/12/04 21.45 BM 04/12/04 8.00 04/12/04 8.00 04/12/04 8.45 04/12/04 8.45 08/12/04 10.00 BM 08/12/04 10.00 08/12/04 10.00 13/12/04 12.00

(8)

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima 17/01/05 8.00 BM 17/01/05 8.00 17/01/05 8.00 17/01/05 14.00 17/01/05 15.00 26/01/05 8.00 BM 27/01/05 8.00 27/01/05 8.00 27/01/05 9.30 27/01/05 9.30 17/02/05 7.30 BM 17/02/05 8.00 20/02/05 8.00 20/02/05 9.45 20/02/05 9.45 09/03/05 8.00 BM 09/03/05 8.00 09/03/05 8.00 09/03/05 8.45 09/03/05 8.45 24/03/05 8.00 CM 24/03/05 8.00 24/03/05 8.00 24/03/05 24/03/05 16.00 27/03/05 7.30 PM 27/03/05 7.30 27/03/05 7.30 8.00 30/03/05 8.00 03/04/05 8.00 BM 03/04/05 8.00 03/04/05 8.00 03/04/05 11.00 03/04/05 11.00 14/04/05 9.00 BM 15/04/05 9.30 15/04/05 13.00 15/04/05 14.00 15/04/05 14.00 26/07/05 21.45 BM 26/07/05 8.00 26/07/05 8.00 26/07/05 8.45 26/07/05 8.45 27/07/05 10.00 BM 27/07/05 10.00 27/07/05 10.00 27/07/05 27/07/05 12.00 14/08/05 10.00 BM 14/08/05 10.00 14/08/05 10.30 14/08/05 12.00 14/08/05 12.00 21/08/08 9.00 BM 21/08/08 9.00 21/08/08 9.00 21/08/08 9.30 21/08/08 9.30 08/09/05 9.30 BM 08/09/05 9.30 08/09/05 9.45 08/09/05 10.30 08/09/05 10.30 16/10/05 9.00 CM 16/10/05 9.00 16/10/05 9.00 17/10/05 12.00 31/10/05 4.30 BM 31/10/05 7.45 31/10/05 8.00 31/10/05 15.00 31/10/05 16.00 06/11/05 8.00 CM 06/11/05 8.00 06/11/05 8.00 06/11/05 12.00 06/11/05 12.00 06/12/05 16.15 BM 06/12/05 16.15 07/12/05 8.00 07/12/05 12.00 07/12/05 12.00 11/12/05 9.00 BM 11/12/05 9.00 11/12/05 9.00 11/12/05 10.00 11/12/05 10.00 12/12/05 10.00 BM 12/12/05 10.00 12/12/05 10.00 12/12/05 12.00 12/12/05 12.00 14/12/05 9.00 BM 14/12/05 9.00 14/12/05 9.00 14/12/05 12.00 14/12/05 12.00 18/12/05 22.00 BM 19/12/05 8.00 19/12/05 8.00 22/12/05 16.15 26/12/05 8.00 BM 26/12/05 8.00 26/12/05 8.00 26/12/05 10.30 26/12/05 10.30 28/12/05 10.00 CM 28/12/05 10.00 28/12/05 10.00 28/12/05 12.30 28/12/05 13.30

Data Kerusakan Mesin 2 CNC Sincom E 32 K Tahun 2006

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

23/01/06 17.00 BM 23/01/06 8.00 23/01/06 8.00 23/01/06 9.30 23/01/06 9.30 04/03/06 8.30 BM 04/03/06 8.30 05/03/06 8.30 05/03/06 9.10 05/03/06 9.10 30/03/06 11.00 BM 30/03/06 11.00 30/03/06 11.00 30/03/06 13.00 30/03/06 13.00 25/04/06 8.00 BM 25/04/06 8.30 25/04/06 14.15 25/04/06 16.15 25/04/06 16.15 08/05/06 9.00 CM 09/05/06 9.00 09/05/06 9.00 09/05/06 10.00 09/05/06 10.00 28/05/05 10.40 BM 28/05/05 11.00 28/05/05 14.00 28/05/05 14.30 28/05/05 14.30 12/06/06 9.30 PM 12/06/06 9.30 12/06/06 9.30 10.00 13/06/06 10.00 06/08/06 17.30 BM 06/08/06 17.45 06/08/06 17.45 06/08/06 18.20 06/08/06 18.20 30/08/06 15.30 BM 30/08/06 8.00 30/08/06 16.45 30/08/06 20.00 30/08/06 20.00 20/09/06 10.15 BM 20/09/06 10.30 20/09/06 13.30 20/09/06 20/09/06 09/10/06 12.30 CM 09/10/06 13.00 09/10/06 13.30 15.00 10/10/06 15.00 22/10/06 8.00 BM 22/10/06 8.15 22/10/06 9.00 22/10/06 9.15 22/10/06 9.15 25/11/06 8.40 PM 25/11/06 8.40 25/11/06 9.00 9.15 29/11/06 9.15 01/12/06 7.30 PM 01/12/06 8.00 01/12/06 8.00 03/12/06 16.35

(9)

02/01/04 15.45 PM 02/01/04 16.00 02/01/04 16.00 16.30 04/01/05 16.30 30/01/04 8.15 BM 30/01/05 8.15 30/01/04 8.15 30/01/05 9.00 30/01/05 9.00 13/02/04 11.00 BM 13/02/05 11.00 13/02/04 11.00 13/02/05 11.00 13/02/05 16.45 28/03/04 7.45 CM 28/03/05 7.45 28/03/04 8.00 28/03/05 8.10 28/03/05 8.10 31/03/04 9.30 BM 31/03/05 9.30 31/03/04 9.30 31/03/05 10.00 31/03/05 10.00 30/05/04 14.00 CM 30/05/05 14.00 30/05/04 14.00 30/05/05 14.15 30/05/05 14.15 01/07/04 9.45 BM 01/07/05 10.00 03/07/04 10.00 03/07/05 03/07/05 18.00 10/07/04 20.00 BM 10/07/05 8.00 11/07/04 8.00 15.30 12/07/05 12.00 21/08/04 8.30 BM 21/08/05 8.30 21/08/04 8.30 12.00 30/08/05 12.00 18/11/04 14.15 BM 18/11/05 14.15 18/11/04 14.15 16.00 22/11/05 18.00 09/12/04 13.00 PM 09/12/05 13.00 09/12/04 13.00 15/12/05 11.15

Data Kerusakan Mesin 3 CNC Sincom E 32 K Tahun 2005

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

18/05/05 8.15 BM 18/05/05 8.15 18/05/05 8.15 18/05/05 8.30 18/05/05 8.30 27/05/05 7.30 BM 27/05/05 7.30 27/05/05 7.45 27/05/05 8.15 27/05/05 8.15 07/07/05 18.00 BM 07/07/05 8.00 07/07/05 8.00 07/07/05 20/07/05 16.45 25/07/05 7.45 BM 25/07/05 7.45 25/07/05 7.45 25/07/05 25/07/05 16.00 10/08/05 0 CM 10/08/05 7.30 10/08/05 7.45 10/08/05 9.00 10/08/05 9.00 12/09/05 10.15 CM 12/09/05 10.15 12/09/05 10.15 12/09/05 15.15 12/09/05 16.00 19/09/05 8.00 BM 19/09/05 8.00 19/09/05 8.00 8.30 21/09/05 8.30 03/10/05 19.00 BM 04/10/05 8.00 04/10/05 8.15 04/10/05 12.00 05/10/05 12.00 08/11/05 6.00 BM 08/11/05 8.00 08/11/05 8.00 08/11/05 15.15 08/11/05 16.15 11/11/05 8.00 BM 11/11/05 8.00 11/11/05 8.00 11/11/05 11/11/05 16.00 17/11/05 9.00 BM 17/11/05 9.00 17/11/05 9.00 12.00 18/11/05 12.00 24/12/05 15.30 PM 24/12/05 16.00 24/12/05 8.00 11.15 28/12/05 11.15

(10)

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima 08/01/06 8.00 BM 08/01/06 8.00 08/01/06 8.00 08/01/06 08/01/06 16.30 10/01/06 7.30 BM 10/01/06 7.30 10/01/06 7.30 10/01/06 9.00 10/01/06 9.00 12/01/06 7.30 BM 13/01/06 7.30 13/01/06 8.00 9.30 15/01/05 9.30 17/01/06 13.00 PM 17/01/06 13.00 17/01/06 13.00 13.15 21/01/06 13.15 26/01/05 18.10 BM 26/01/05 18.10 26/01/05 18.10 26/01/05 18.15 26/01/05 18.15 01/02/05 8.00 BM 01/02/05 8.00 01/02/05 8.00 01/02/05 9.30 03/02/06 9.30 26/03/06 8.00 BM 26/03/06 8.00 26/03/06 13.00 26/03/06 16.30 26/03/06 16.30 8/0/06 8.00 BM 09/04/06 8.00 09/04/06 8.00 09/04/06 09/04/06 16.00 22/05/06 8.00 CM 22/05/06 8.00 22/05/06 8.00 22/05/06 22/05/06 16.30 29/06/06 8.00 PM 29/06/06 8.00 29/06/06 8.00 30/06/06 16.00 01/07/06 8.00 BM 01/07/06 8.00 01/07/06 8.00 01/07/06 01/07/06 16.30 25/08/06 15.30 CM 25/08/06 16.00 26/08/06 8.00 26/08/06 11.15 26/08/06 11.15 12/09/06 11.00 CM 12/09/06 11.30 13/09/06 13.30 13/09/06 14.00 13/09/06 14.00 13/09/06 8.00 BM 13/09/06 8.00 13/09/06 8.00 13/09/06 11.15 13/09/06 11.15 01/10/06 5.30 BM 01/10/06 8.00 01/10/06 8.00 01/10/06 14.00 02/10/06 14.45 16/10/06 15.00 BM 16/10/06 15.00 16/10/06 15.45 16/10/06 16.45 16/10/06 16.45 06/11/06 8.00 BM 06/11/06 8.00 06/11/06 8.00 06/11/06 14.00 07/11/06 15.00 26/11/06 9.00 CM 26/11/06 9.00 26/11/06 9.00 28/11/06 16.30 11/12/06 13.00 PM 11/12/06 13.00 11/12/06 13.00 24/12/06 16.35

Jenis Kerusakan :

CM : Condition Based Maintenance.

BM : Breakdown Maintenance

PM : Preventive Maintenance

(11)

LAMPIRAN B 

Penentuan Interval Perawatan Preventif Mesin CNC 

Sincom E 32 K

(12)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 1 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 44,25 3,789855 1,04245 1,03751 1,00476 2 125,5 4,832306 0,45596 0,54005 0,84428 3 198 5,288267 0,29522 0,37635 0,78445 4 266 5,583496 0,25641 0,29649 0,86482 5 343,75 5,839915 0,01859 0,25065 0,07416 6 350,2 5,858504 0,09213 0,22237 0,41433 7 384 5,950643 0 0,20488 0 8 384 5,950643 0,09968 0,19515 0,51074 9 424,25 6,050323 0,01520 0,19220 0,07910 10 430,75 6,065528 0,13193 0,19667 0,67081 11 491,5 6,197462 0,66736 0,21187 3,14990 12 958 6,864848 0,25882 0,24840 1,04193 13 1241 7,123673 0,42083 0,35333 1,19104 14 1890,33 7,544507

Jumlah

10,63035

S (14, 95%) = 0.67

S hitung = 0625

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun

2004

i Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 44,25 0,048611 -2,99909 3,789855 -11,3661 8,994543 2 125,5 0,118056 -2,07444 4,832306 -10,0243 4,303319 3 198 0,1875 -1,57195 5,288267 -8,3129 2,471035 4 266 0,256944 -1,21408 5,583496 -6,77879 1,473979 5 343,75 0,326389 -0,92861 5,839915 -5,42301 0,862317 6 350,2 0,395833 -0,68537 5,858504 -4,01523 0,469728 7 384 0,465278 -0,46839 5,950643 -2,78724 0,219391 8 384 0,534722 -0,26772 5,950643 -1,59312 0,071675 9 424,25 0,604167 -0,07606 6,050323 -0,46018 0,005785 10 430,75 0,673611 0,11303 6,065528 0,685588 0,012776 11 491,5 0,743056 0,30667 6,197462 1,900589 0,094048 12 958 0,8125 0,51520 6,864848 3,536783 0,265433 13 1241 0,881944 0,75921 7,123673 5,408405 0,576409 14 1890,33 0,951389 1,10654 7,544507 8,348362 1,224449

Jumlah

-7,48504 82,93997 -30,8812 21,04489

b = 0.7899 β = 1,26598

a = 6,3466 α = 570,5504

(13)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 1 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 47,5 3,86073 0,01047130 1,02885 0,010178 2 48 3,87120 0,76837060 0,53033 1,448848 3 103,5 4,63957 0,00481928 0,36531 0,013192 4 104 4,64439 0,34263452 0,28384 1,207114 5 146,5 4,98702 0,44669657 0,23595 1,893119 6 229 5,43372 0,08673841 0,20505 0,423009 7 249,75 5,5204 0,36494892 0,18405 1,982825 8 359,75 5,88540 0,12830581 0,16950 0,756949 9 409 6,01371 0,09107807 0,59564 0,152908 10 448 6,10479 0,00356506 0,15326 0,023261 11 449,6 6,10835 0,07682098 0,15017 0,51154 12 485,5 6,18517 0,02139663 0,15033 0,142328 13 496 6,20657 0,00653104 0,15431 0,042323 14 499,25 6,21310 0,19525706 0,16363 1,193284 15 606,9 6,40836 0,20233201 0,18197 1,111892 16 743 6,61070 0,57922612 0,21982 2,634942 17 1326 7,18992 0,01218041 0,32258 0,037759 18 1342,25 7,20210

Jumlah

13,58547

S (18, 95%) = 0.65

S hitung = 0,419369

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun

2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 47,5 0,038043 -3,2497 3,86073 -12,5462 10,56052 2 48 0,092391 -2,33364 3,871201 -9,03400 5,44589 3 103,5 0,146739 -1,8408 4,639572 -8,54054 3,388556 4 104 0,201087 -1,49387 4,644391 -6,93810 2,231634 5 146,5 0,255435 -1,22093 4,987025 -6,08882 1,490678 6 229 0,309783 -0,99223 5,433722 -5,39151 0,984522 7 249,75 0,36413 -0,79239 5,52046 -4,37435 0,62788 8 359,75 0,418478 -0,61229 5,885409 -3,60359 0,37490 9 409 0,472826 -0,44594 6,013715 -2,68173 0,198859 10 448 0,527174 -0,28898 6,104793 -1,76416 0,083509 11 449,6 0,581522 -0,13796 6,108358 -0,84273 0,019034 12 485,5 0,63587 0,010191 6,185179 0,063033 0,00010 13 496 0,690217 0,158613 6,206576 0,984444 0,025158 14 499,25 0,744565 0,310999 6,213107 1,932271 0,096721 15 606,9 0,798913 0,472512 6,408364 3,028027 0,223267 16 743 0,853261 0,651856 6,610696 4,30922 0,424916 17 1326 0,907609 0,867824 7,189922 6,239587 0,753118 18 1342,25 0,961957 1,184492 7,202103 8,530833 1,403021

Jumlah

-9,75224 103,0853 -36,7183 28,33229

b = 0,83009 β = 1,204688

a = 6,176698 α = 481,3999

(14)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 1 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 70,9 4,26127 0,279361231 1,027277 0,271943 2 93,75 4,540632 0,034079314 0,528594 0,064472 3 97 4,574711 0,109732388 0,363389 0,301969 4 108,25 4,684443 0,281891668 0,281692 1,000709 5 143,5 4,966335 0,006944472 0,233535 0,029736 6 144,5 4,97328 0,003454235 0,202291 0,017076 7 145 4,976734 0,398544665 0,180882 2,203341 8 216 5,375278 0,172824441 0,165807 1,042323 9 256,75 5,548103 0,114857631 0,155189 0,740115 10 288 5,66296 0,027398974 0,147984 0,185148 11 296 5,690359 0,261584335 0,14365 1,820984 12 384,5 5,951944 0,120178661 0,142012 0,846257 13 433,6 6,072122 0,305879195 0,14325 2,135282 14 588,75 6,378002 0,329471751 0,148031 2,225694 15 818,5 6,707473 0,044212697 0,157921 0,279967 16 855,5 6,751686 0,189987404 0,176611 1,075739 17 1034,5 6,941673 0,042579753 0,21452 0,198488 18 1079,5 6,984253 0,714229538 0,316666 2,255466 19 2205 7,698483

Jumlah

16,69471

S (19, 95%) = 0.67

S hitung = 0,6492

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun

2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 70,9 0,036082 -3,30363 4,26127 -14,0777 10,91397 2 93,75 0,087629 -2,38914 4,540632 -10,8482 5,707995 3 97 0,139175 -1,89802 4,574711 -8,68291 3,602498 4 108,25 0,190722 -1,553 4,684443 -7,27494 2,411807 5 143,5 0,242268 -1,2822 4,966335 -6,36785 1,644043 6 144,5 0,293814 -1,05591 4,97328 -5,25131 1,114937 7 145 0,345361 -0,8588 4,976734 -4,27401 0,737534 8 216 0,396907 -0,68184 5,375278 -3,6651 0,46491 9 256,75 0,448454 -0,51914 5,548103 -2,88027 0,269511 10 288 0,5 -0,36651 5,66296 -2,07555 0,134332 11 296 0,551546 -0,22071 5,690359 -1,25591 0,048712 12 384,5 0,603093 -0,07899 5,951944 -0,47012 0,006239 13 433,6 0,654639 0,061251 6,072122 0,371922 0,003752 14 588,75 0,706186 0,202783 6,378002 1,293352 0,041121 15 818,5 0,757732 0,349043 6,707473 2,341199 0,121831 16 855,5 0,809278 0,504973 6,751686 3,409417 0,254997 17 1034,5 0,860825 0,679059 6,941673 4,713806 0,461121 18 1079,5 0,912371 0,889801 6,984253 6,214595 0,791746 19 2205 0,963918 1,200551 7,698483 9,242424 1,441324 Jumlah -10,3204 108,7397 -39,5371 30,17238

b = 0,794912 β = 1,258001

a = 6,154925 α = 471,0316

(15)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 2 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 54 3,98898405 0,280713403 1,027277 0,27326 2 71,5 4,26969745 0,099750403 0,528594 0,188709 3 79 4,36944785 0,009448889 0,363389 0,026002 4 79,75 4,37889674 0,18545145 0,281692 0,658348 5 96 4,56434819 0 0,233535 0 6 96 4,56434819 0,108480643 0,202291 0,53626 7 107 4,67282883 0,282998223 0,180882 1,564546 8 142 4,95582706 0,301668314 0,165807 1,819394 9 192 5,25749537 0,113142656 0,155189 0,729064 10 215 5,37063803 0,296653338 0,147984 2,004631 11 289,25 5,66729137 0,283351187 0,14365 1,972511 12 384 5,95064255 0,162109992 0,142012 1,141523 13 451,58 6,11275254 0,232006239 0,14325 1,61959 14 569,5 6,34475878 0,042541323 0,148031 0,287381 15 594,25 6,38730011 0,084273092 0,157921 0,533641 16 646,5 6,4715732 0,269832293 0,176611 1,527834 17 846,75 6,74140549 0,119865961 0,21452 0,558764 18 954,58 6,86127145 0,28589435 0,316666 0,902826 18 1270,5 7,1471658 Jumlah 16,34428

S (18, 95%) = 0.65

S hitung = 0,5228

Tabel Estimasi Parameter Weibull Dua Parameter Ms 2 tahun

2004

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 54 0,036082 -3,30363 3,988984 -13,1781 10,91397 2 71,5 0,087629 -2,38914 4,269697 -10,2009 5,707995 3 79 0,139175 -1,89802 4,369448 -8,29332 3,602498 4 79,75 0,190722 -1,553 4,378897 -6,80042 2,411807 5 96 0,242268 -1,2822 4,564348 -5,85242 1,644043 6 96 0,293814 -1,05591 4,564348 -4,81952 1,114937 7 107 0,345361 -0,8588 4,672829 -4,01302 0,737534 8 142 0,396907 -0,68184 4,955827 -3,3791 0,46491 9 192 0,448454 -0,51914 5,257495 -2,7294 0,269511 10 215 0,5 -0,36651 5,370638 -1,96841 0,134332 11 289,25 0,551546 -0,22071 5,667291 -1,25082 0,048712 12 384 0,603093 -0,07899 5,950643 -0,47002 0,006239 13 451,58 0,654639 0,061251 6,112753 0,374411 0,003752 14 569,5 0,706186 0,202783 6,344759 1,28661 0,041121 15 594,25 0,757732 0,349043 6,3873 2,229444 0,121831 16 646,5 0,809278 0,504973 6,471573 3,267968 0,254997 17 846,75 0,860825 0,679059 6,741405 4,577812 0,461121 18 954,58 0,912371 0,889801 6,861271 6,105165 0,791746 19 1270,5 0,963918 1,200551 7,147166 8,58054 1,441324 Jumlah -10,3204 104,0767 -36,5335 30,17238

b = 0,814072 β = 1,228392

a = 5,919908 α = 372,3775

(16)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 2 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 130 4,867534 0,057906 1,034894 0,055954 2 137,75 4,92544 0,130805 0,537085 0,243547 3 157 5,056246 0,061748 0,372934 0,165574 4 167 5,117994 0,280169 0,292518 0,957783 5 221 5,398163 0,179679 0,245947 0,730558 6 264,5 5,577841 0,490005 0,216712 2,261091 7 431,75 6,067847 0,001736 0,197893 0,00877 8 432,5 6,069582 0,085276 0,186266 0,457817 9 471 6,154858 0,111393 0,180402 0,617472 10 526,5 6,266251 0,004737 0,180072 0,026307 11 529 6,270988 0,408611 0,186347 2,192741 12 796 6,679599 0,095481 0,202727 0,470985 13 875,75 6,775081 0,369327 0,239842 1,539874 14 1267 7,144407 0,678839 0,344309 1,971597 15 2498 7,823246

Jumlah

11,70007

S (15, 95%) = 0.7

S hitung = 0,621944

Tabel Estimasi Parameter Weibull Dua Parameter Ms 2 tahun

2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 130 0,04545 -3,06787 4,867534 -14,933 9,411842 2 137,75 0,11039 -2,14582 4,92544 -10,5691 4,604558 3 157 0,17532 -1,64628 5,056246 -8,324 2,71024 4 167 0,24026 -1,29179 5,117994 -6,61137 1,66872 5 221 0,305195 -1,01026 5,398163 -5,45356 1,020628 6 264,5 0,37013 -0,77167 5,577841 -4,30424 0,595471 7 431,75 0,43506 -0,56029 6,067847 -3,39974 0,313923 8 432,5 0,5 -0,36651 6,069582 -2,22458 0,134332 9 471 0,56493 -0,18361 6,154858 -1,1301 0,033713 10 526,5 0,62987 -0,00612 6,266251 -0,03833 3,74E-05 11 529 0,69480 0,171265 6,270988 1,074 0,029332 12 796 0,75974 0,354898 6,679599 2,370574 0,125952 13 875,75 0,82467 0,554526 6,775081 3,756959 0,307499 14 1267 0,88961 0,790156 7,144407 5,645193 0,624346 15 2498 0,95454 1,128508 7,823246 8,828598 1,273531 Jumlah -8,05087 90,19508 -35,3127 22,85412

b = 0,706697 β = 1,415033

a = 6,392307 α = 597,2329

(17)

Ms 2 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 105,75 4,661078 0,20837786 1,048411 0,198756 2 130,25 4,869456 0,635875855 0,552769 1,150346 3 246 5,505332 0,236870049 0,39141 0,605171 4 311,75 5,742202 0,035450739 0,314705 0,112648 5 323 5,777652 0,197428745 0,273245 0,722534 6 393,5 5,975081 0,030039806 0,251386 0,119497 7 405,5 6,005121 0,203469153 0,243928 0,834136 8 497 6,20859 0,956710231 0,251548 3,803291 9 1293,75 7,1653 0,316255445 0,282879 1,117988 10 1775 7,481556 0,097612265 0,389071 0,250885 11 1957 7,579168

Jumlah

8,915253

S (11, 95%) = 0.67

S hitung = 0,687114

2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 105,75 0,061404 -2,75877 4,661078 -12,8588 7,610816 2 130,25 0,149123 -1,82333 4,869456 -8,87861 3,324524 3 246 0,236842 -1,30826 5,505332 -7,2024 1,711541 4 311,75 0,324561 -0,93549 5,742202 -5,37178 0,875144 5 323 0,412281 -0,63204 5,777652 -3,65171 0,399476 6 393,5 0,5 -0,36651 5,975081 -2,18994 0,134332 7 405,5 0,587719 -0,12098 6,005121 -0,72651 0,014636 8 497 0,675439 0,118032 6,20859 0,732815 0,013932 9 1293,75 0,763158 0,364894 7,1653 2,614576 0,133148 10 1775 0,850877 0,643424 7,481556 4,813811 0,413994 11 1957 0,938596 1,026145 7,579168 7,777325 1,052973

Jumlah

-5,79289 66,97053 -24,9413 15,68452

b = 0,817422 β = 1,223359

a = 6,518706 α = 677,7009

(18)

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 3 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 209,5 5,344724 0,051174 1,079055 0,047425 2 220,5 5,395898 0,451263 0,591587 0,762801 3 346,25 5,847161 0,872456 0,442789 1,970365 4 828,5 6,719617 0,1748 0,387289 0,451342 5 986,75 6,894417 0,310476 0,387714 0,800786 6 1346 7,204893 0,742698 0,480648 1,545201 7 2828,75 7,94759 Jumlah 5,577919

S (7, 95%) = 0.8

S hitung = 0,5015

Tabel Estimasi Parameter Weibull Dua Parameter Ms 3 tahun

2004

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 209,5 0,094595 -2,30888 5,344724 -12,3403 5,330927 2 220,5 0,22973 -1,34318 5,395898 -7,24767 1,804138 3 346,25 0,364865 -0,78984 5,847161 -4,61832 0,623847 4 828,5 0,5 -0,36651 6,719617 -2,46283 0,134332 5 986,75 0,635135 0,008195 6,894417 0,056497 6,72E-05 6 1346 0,77027 0,385842 7,204893 2,779948 0,148874 7 2828,75 0,905405 0,85788 7,94759 6,818075 0,735957

Jumlah

-3,5565 45,3543 -17,0146 8,778142

b = 0,864786 β = 1,15635

a = 6,918558 α = 1010,86

Tabel Pengujian Kecocokan Distribusi Weibull Dua

Parameter Ms 3 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 216 5,375278 0,441833 1,079055 0,409463 2 336 5,817111 1,098612 0,591587 1,85706 3 1008 6,915723 0,10059 0,442789 0,227174 4 1114,67 7,016314 0,377872 0,387289 0,975685 5 1626,5 7,394186 0,272504 0,387714 0,702849 6 2136 7,66669 0,028536 0,480648 0,059369 7 2197,83 7,695226

Jumlah

4,2316

S (7, 95%) = 0.8

S hitung = 0,410697

(19)

2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 216 0,094595 -2,30888 5,375278 -12,4109 5,330927 2 336 0,22973 -1,34318 5,817111 -7,81344 1,804138 3 1008 0,364865 -0,78984 6,915723 -5,46231 0,623847 4 1114,67 0,5 -0,36651 7,016314 -2,57157 0,134332 5 1626,5 0,635135 0,008195 7,394186 0,060592 6,72E-05 6 2136 0,77027 0,385842 7,66669 2,958128 0,148874 7 2197,83 0,905405 0,85788 7,695226 6,601577 0,735957

Jumlah

-3,5565 47,88053 -18,6379 8,778142

b = 0,816048 β = 1,225418

a = 7,254686 α = 1414,719

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter

Ms 3 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 492,5 6,199494461 0,164963654 1,060046 0,155619 2 580,83 6,364458115 0,072493214 0,566942 0,127867 3 624,5 6,43695133 0,002399042 0,409157 0,005863 4 626 6,439350371 0,234162491 0,337763 0,693275 5 791,17 6,673512863 0,000417017 0,304777 0,001368 6 791,5 6,673929879 0,217696018 0,297949 0,730649 7 984 6,891625897 0,380772496 0,322189 1,18183 8 1440 7,272398393 0,426687388 0,424958 1,00407 9 2206,33 7,699085781

Jumlah

3,90054

S (9, 95%) = 0,74808

S hitung = 0,76

Tabel Estimasi Parameter Weibull Dua Parameter Ms 3 tahun

2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 492,5 0,074468 -2,55894 6,199494 -15,8641 6,548178 2 580,83 0,180851 -1,61199 6,364458 -10,2595 2,598526 3 624,5 0,287234 -1,08293 6,436951 -6,97076 1,172736 4 626 0,393617 -0,69266 6,43935 -4,46028 0,479778 5 791,17 0,5 -0,36651 6,673513 -2,44593 0,134332 6 791,5 0,606383 -0,07002 6,67393 -0,4673 0,004903 7 984 0,712766 0,221108 6,891626 1,523792 0,048889 8 1440 0,819149 0,536541 7,272398 3,90194 0,287876 9 2206,33 0,925532 0,954505 7,699086 7,348816 0,91108

Jumlah

-4,6709 60,65081 -27,6933 12,1863

b = 0,387597 β = 2,580002

a = 6,940137 α = 1032,912

(20)

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 3459 537,9664 1,26598 570,5504 10,125 7,5 4200 12,51837 0,024705397 1,26598 570,5504 10,125 7,5 1000 2,03482 0,025131723 1,26598 570,5504 10,125 7,5 1500 3,39981 0,023589828 1,26598 570,5504 10,125 7,5 2000 4,89356 0,023295413 1,26598 570,5504 10,125 7,5 2500 6,49099 0,023428086 1,26598 570,5504 10,125 7,5 3459 9,79101 0,024086065

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 1 Tahun 2005

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 4071,83 449,6389 1,20469 481,3999 16,375 15,04 449,6389 0,9211 0,06486464 1,20469 481,3999 16,375 15,04 100 0,1506 0,16017064 1,20469 481,3999 16,375 15,04 1500 3,9320 0,04979814 1,20469 481,3999 16,375 15,04 1800 4,8978 0,04957048 1,20469 481,3999 16,375 15,04 1900 5,2275 0,04957083 1,20469 481,3999 16,375 15,04 2000 5,5607 0,04959779 1,20469 481,3999 16,375 15,04 4071,83 13,0945 0,05217832

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 1 Tahun 2006

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

5171,94 487,3421 1,258001 471,0316 21 3,4 449,64 0,9432 0,0514341 1,258001 471,0316 21 3,4 100 0,1423 0,1775531 1,258001 471,0316 21 3,4 5000 19,5258 0,0174044 1,258001 471,0316 21 3,4 5171,94 20,3742 0,0173836 1,258001 471,0316 21 3,4 5800 23,5340 0,0173537 1,258001 471,0316 21 3,4 6000 24,5594 0,0173563 Keterangan : tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif Tf = Waktu yang diperlukan untuk perawatan korektif MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

(21)

PM F Beta Alpha Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 2207,875 375,7453 1,228392 372,3775 6,92 2,33 375,75 1,01112 0,024240 1,228392 372,3775 6,92 2,33 2000 7,88467 0,012602 1,228392 372,3775 6,92 2,33 2207,875 8,90299 0,012491 1,228392 372,3775 6,92 2,33 2800 11,92026 0,012360 1,228392 372,3775 6,92 2,33 2900 12,44533 0,012356 1,228392 372,3775 6,92 2,33 3000 12,97455 0,012355 1,228392 372,3775 6,92 2,33 3200 14,04503 0,012362 1,228392 372,3775 6,92 2,33 3500 15,67940 0,012391

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 2 Tahun 2005

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 4295,75 593,65 1,415033 597,2329 8,25 4,53 593,65 0,9915215 0,021169 1,415033 597,2329 8,25 4,53 1400 3,338412 0,016597 1,415033 597,2329 8,25 4,53 1600 4,032742 0,016489 1,415033 597,2329 8,25 4,53 1700 4,3939666 0,016482 1,415033 597,2329 8,25 4,53 1800 4,7641227 0,016497 1,415033 597,2329 8,25 4,53 2000 5,5300785 0,016582 1,415033 597,2329 8,25 4,53 4295,75 16,313041 0,019086

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 2 Tahun 2006

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 5065,833 676,2273 1,223359 677,7009 8,152 5,125 676,223 0,9973328 0,019380 1,223359 677,7009 8,152 5,125 3000 6,1715122 0,013224 1,223359 677,7009 8,152 5,125 3200 6,6785284 0,013210 1,223359 677,7009 8,152 5,125 3400 7,1926763 0,013208 1,223359 677,7009 8,152 5,125 3500 7,4523208 0,013211 1,223359 677,7009 8,152 5,125 5065,833 11,714991 0,013439 Keterangan : tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif Tf = Waktu yang diperlukan untuk perawatan korektif MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

(22)

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 4200 966,6071 1,156354 1010,862 7 7,6 966,6071 0,94955 0,014602 1,156354 1010,862 7 7,6 4400 5,47814 0,011036 1,156354 1010,862 7 7,6 4500 5,62237 0,011034 1,156354 1010,862 7 7,6 4600 5,76710 0,011033 1,156354 1010,862 7 7,6 4800 6,05802 0,011034 1,156354 1010,862 7 7,6 5000 6,35084 0,011038

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 3 Tahun 2005

MTB(jam) Dist. Weibull PM F Beta Alpha Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 2856 1233,571 1,225418 1414,719 7,15 15,62 100 0,03890 0,072400 1,225418 1414,719 7,15 15,62 1233,571 0,84543 0,016406 1,225418 1414,719 7,15 15,62 1500 1,07436 0,015879 1,225418 1414,719 7,15 15,62 2000 1,52845 0,015457 1,225418 1414,719 7,15 15,62 2500 2,00913 0,015369 1,225418 1414,719 7,15 15,62 2856 2,36515 0,015400 1,225418 1414,719 7,15 15,62 3500 3,03442 0,015553

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 3 Tahun 2006

MTB(jam) Dist. Weibull

PM F Beta Alpha

Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp) 2856 948,5367 2,580002 1032,912 7,56 2,8 500 0,153836 0,015743 2,580002 1032,912 7,56 2,8 948 0,801461 0,010260 2,580002 1032,912 7,56 2,8 1200 1,472328 0,009674 2,580002 1032,912 7,56 2,8 1300 1,810056 0,009658 2,580002 1032,912 7,56 2,8 1400 2,191429 0,009730 2,580002 1032,912 7,56 2,8 2856 13,79030 0,016124 Keterangan : tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif Tf = Waktu yang diperlukan untuk perawatan korektif MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

(23)

LAMPIRAN C 

 

Gambar

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun  2004
Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun  2005
Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter  Ms 1 tahun 2006
Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter  Ms 2 tahun 2004
+7

Referensi

Dokumen terkait

Pengadaan merupakan proses penyediaan obat yang dibutuhkan di Rumah Sakit dan untuk unit pelayanan kesehatan lainnya yang diperoleh dari pemasok eksternal melalui pembelian

Hasil penelitian menunjukkan bahwa CSR PT Vale Indonesia Tbk berpengaruh signifikan terhadap tingkat pendidikan dan tingkat pendapatan kelompok tani di Kecamatan

Pembuatan Tugas Akhir ini akan bermanfaat baik bagi mahasiswa yang melaksanakan tugas akhir, mahasiswa di bawahnya dan menunjang proses kegiatan belajar mengajar PSD III Teknik

News Reader: BULAN BAKTI GOTONG ROYONG MASYARAKAT. UNTUK MENINGKATKAN KEBERSAMAAN DAN RASA KESETIAKAWANAN SOSIAL / KHUSUSNYA DI BIDANG PEMBANGUNAN /

Lesi yang paling khas dari skabies adalah berupa terowongan yang dibuat oleh.. Sarcoptes scabiei tempat tinggal

Peraturan Menteri Kesehatan Republik Indonesia Nomor 982/Menkes/Per/IX/1995 tentang Penyusunan AMDAL bidang Kesehatan, Peraturan Menteri Negara Lingkungan

Berdasarkan penjelasan tersebut, sehingga dapat disimpulkan bahwa kualitas audit adalah proses dari awal hingga hasil terbitnya sebuah laporan audit yang dilakukan oleh seseorang

CIREBON SUPER BLOK MALLGround Floor No. Cipto Mangunkusumo No. Margonda Raya No. MORITZ )Lantai Upper Ground Unit UG -