DAFTAR PUSTAKA
Agah, H. R. (2007). Penyediaan Fasilitas Putaran Balik pada Segmen Jalan. Majalah Teknik
Jalan & Transprotasi No. 110 , 11-16.
Aldian, A., & Taylor, M. (2001). Selecting Priority Junction Traffic Models to Determine
U-Turn Capacity at Median Opening. Proceedings of Eastern Asia Society for Transprotation
Studies Vol. 3 No. 2 , 101-113.
Al-Masaeid, H. (1999). Capacity of U-turn at Median Opening. ITE Journal , 28-34.
Ang, A., Tang, W., & Hariandja, B. (1987). Konsep-konsep Probabilitas dalam Perencanaan
dan Perancangan Rekayasa. Bandung: Erlangga.
Brilon, W., & Koenig, R. (1997). Useful Estimation Procedure For Critical Gaps. Third
International Symposium in Intersections without Traffic Signal , 71-78.
Currin, T. R. (2001). Traffic Engineering (A Manual for Data Collection and Analysis).
USA: Webcom Ltd.
Jenjiwattanakul, T., & Sano, K. (2011). Effect of Waiting Time on the Gap Acceptance
Behavior of U-turning Vehicles at Midblock Opening. Journal of the Eastern Asia Society for
Transportation Studies, Vol. 9 , 1601-1612.
Jenjiwattanakul, T., Sano, K., & Nishiuchi, H. (2013). Capacity of U-turn Junction at
Midblock Median Opening on Urban Arterial Based on Balancing Volume-to-capacity Ratio.
Proceeding of Eastern Asia Society for Tansportation Studies Vol. 9 .
Luttinen, R. T. (2004). Capacity and Level of Service at Finnish Unsignalized Intersection.
Helsinki: Finnish Road Administration.
Mannering, F., Kilareski, W., & Washburn, S. (2005). Principal of Highway Engineering and
Traffic Analysis. USA: Malloy, Inc.
Salter, R. J. (1974). Highway Traffic Analysis and Design. Houndmills: MacMillan Publisher
Ltd. .
Service, T. C. (2000). Highway Capacity Manual . USA: TRB Publisher Office.