REKAPITULASI PERHITUNGAN EMISI SUMBER GAS RUMAH KACA YANG BERASAL DARI PABRIK PENGOLAHAN TEH
No. Sumber Emisi Kode Cerobong Periode Hasil Perhitungan Emisi (m3)
CO2 CH4 N2O
1. Heat Exchanger (HE) Pelayuan Cerobong I Semester I/2021 938,475,340 38,357,303 7,671,461
2. Heat Exchanger (HE) FBD Cerobong II Semester I/2021 1,258,000,881 51,416,930 1,856,167
3. Heat Exchanger (HE) TSD II Cerobong III Semester I/2021 1,220,822,125 49,897,362 1,552,253 4. Heat Exchanger (HE) TSD I Cerobong IV Semester I/2021 1,245,113,406 50,890,194 1,750,819
5. Genset 450 kVA Genset Semester I/2021 5,266 215 10
Total Semester I/2021 4,662,417,019 190,562,003 12,830,710
DATA ISIAN WAKTU OPERASI & BAHAN BAKAR PTPN VI UNIT USAHA DANAU KEMBAR
No Bulan Tahun
Cerobong I (HE Pelayuan) Cerobong II (HE FBD) Cerobong III (HE TSD II) Cerobong IV (HE TSD I) Genset 450 KvA
Waktu Operasi Massa jenis cangkang sawit (kg/m3)
Bahan Bakar Cangkang
(kg)
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu Operasi (jam)
Bahan Bakar Cangkang
(kg)
∆V (Volume bahan Bakar) mᶾ/bulan
Waktu Operasi (jam)
Bahan Bakar Cangkang
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu
Operasi (jam) Bahan Bakar Cangkang (kg)
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu Operasi (jam)
Bahan Bakar Solar
( liter) Volume
solar
(m3) Jumlah BBC Jumlah BBM Solar
1 Januari 2021 86.35 0.62 24,200 38,791 172.70 40,725 65,280 172.70 40,725 65,280 172.70 40,725 65,280 1.00 40 0.04 122,100 300.00 2 Februari 2021 120.73 22,570 36,179 241.45 44,138 70,752 241.45 44,138 70,752 241.45 44,138 70,752 7.00 310 0.31 91,155 50.00 3 Maret 2021 168.25 36,055 57,794 336.50 52,189 83,656 281.40 43,644 69,959 317.40 49,227 78,908 6.00 450 0.45 116,810 130.00 4 April 2021 143.90 37,465 60,055 287.80 50,207 80,479 287.80 50,207 80,479 287.80 50,207 80,479 19.00 740 0.74 142,390 50.00 5 Mei 2021 126.13 38,865 62,299 252.25 46,605 74,705 252.25 46,605 74,705 252.25 46,605 74,705 10.00 230 0.23 152,180 - 6 Juni 2021 141.10 56,540 90,631 282.20 55,269 88,594 282.20 55,269 88,594 282.20 55,269 88,594 4.00 170 0.17 175,740 170.00 Jumlah Semester I 2021 786.45 215,695.00 345,748.18 1,572.90 289,133.33 463,466.11 1,517.80 280,588.33 449,768.90 1,553.80 286,171.33 458,718.17 47 1,940 1.94 800,375 700.00
GRK CO2
Sumber Emisi Periode ∆V (Volume
bahan Bakar) m ᶾ/Semester I
NCV
(TJ/kg.ton) ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E Co2 tonCo2/th Cerobong I Semester I/2021 345,748.18 43 860 12,785,767,572 73.4 938,475,340 Cerobong II Semester I/2021 463,466.11 43 860 17,138,976,586 73.4 1,258,000,881 Cerobong III Semester I/2021 449,768.90 43 860 16,632,454,025 73.4 1,220,822,125 Cerobong IV Semester I/2021 458,718.17 43 860 16,963,397,906 73.4 1,245,113,406 Genset Semester I/2021 1.94 43 860 71,741 73.4 5,266
GRK CH4
Sumber Emisi Periode ∆V (Volume bahan
Bakar) mᶾ /Semester I
NCV
(TJ/kg.ton) ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E CH4 tonCo2/th Cerobong I Semester I/2021 345,748.18 43 860 12,785,767,572 3.0 38,357,303 Cerobong II Semester I/2021 463,466.11 43 860 17,138,976,586 3.0 51,416,930 Cerobong III Semester I/2021 449,768.90 43 860 16,632,454,025 3.0 49,897,362 Cerobong IV Semester I/2021 458,718.17 43 860 16,963,397,906 3.0 50,890,194 Genset Semester I/2021 1.94 43 860 71,741 3.0 215
GRK NO2
Sumber Emisi Periode ∆V (Volume bahan
Bakar) mᶾ /Semester I
NCV (TJ/kg.ton
)
ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E NO2 tonCo2/th Cerobong I Semester I/2021 345,748.18 43 860 12,785,767,572 0.6 7,671,461 Cerobong II Semester I/2021 83,656.33 43 860 3,093,610,996 0.6 1,856,167 Cerobong III Semester I/2021 69,959.12 43 860 2,587,088,435 0.6 1,552,253 Cerobong IV Semester I/2021 78,908.39 43 860 2,918,032,315 0.6 1,750,819 Genset Semester I/2021 0.45 43 860 16,641 0.6 10
REKAPITULASI PERHITUNGAN EMISI SUMBER GAS RUMAH KACA YANG BERASAL DARI PABRIK PENGOLAHAN TEH
No. Sumber Emisi Kode Cerobong Periode Hasil Perhitungan Emisi (m3)
CO2 CH4 N2O
1. Heat Exchanger (HE) Pelayuan Cerobong I Semester II/2020 905,299,446 37,001,340 7,400,268
2. Heat Exchanger (HE) FBD Cerobong II Semester II/2020 713,526,623 46,747,156 9,349,431
3. Heat Exchanger (HE) TSD II Cerobong III Semester II/2020 1,143,045,502 46,718,481 9,343,696 4. Heat Exchanger (HE) TSD I Cerobong IV Semester II/2020 1,143,747,091 46,747,156 9,349,431
5. Genset 450 kVA Genset Semester II/2020 4,547 186 37
Total Semester II/2020 3,905,623,208 177,214,319 35,442,864
DATA ISIAN WAKTU OPERASI & BAHAN BAKAR PTPN VI UNIT USAHA DANAU KEMBAR
No Bulan Tahun
Cerobong I (HE Pelayuan) Cerobong II (HE FBD) Cerobong III (HE TSD II) Cerobong IV (HE TSD I) Genset 450 KvA
Waktu Operasi Massa jenis cangkang sawit (kg/m3)
Bahan Bakar Cangkang
(kg)
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu Operasi (jam)
Bahan Bakar Cangkang
(kg)
∆V (Volume bahan Bakar) mᶾ/bulan
Waktu Operasi(jam)
Bahan Bakar Cangkang(k
g)
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu
Operasi(jam) Bahan Bakar Cangkang (kg)
∆V (Volume bahan Bakar)
mᶾ/bulan Waktu Operasi (jam)
Bahan Bakar Solar
( liter) Volume
solar
(m3) Jumlah BBC Jumlah BBM Solar
1 Juli 2020 119.75 0.62 52,190 83,658 239.50 42,910 68,783 238.60 42,749 68,525 239.50 42,910.42 68,783.23 0 - 210,910 90.00 2 Agustus 2020 105.80 33,170 53,170 211.60 46,103 73,901 211.60 46,103 73,901 211.60 46,103 73,901.31 1 100.00 0.10 180,880 130.00 3 September 2020 119.75 41,060 65,817 239.50 44,992 72,119 239.50 44,992 72,119 239.50 44,992 72,119.37 2 100.00 0.10 164,170 60.00 4 Oktober 2020 83.20 25,440 40,779 166.40 27,135 43,496 165.90 27,135 43,496 166.50 27,135 43,496.03 7 400.00 0.40 160,920 260.00 5 November 2020 97.10 36,715 58,852 194.20 61,958 99,316 194.20 61,958 99,316 194.20 61,958 99,316.07 6 300.00 0.30 96,115 360.00 6 Desember 2020 91.75 19,495 31,249 183.50 39,775 63,757 183.50 39,775 63,757 183.50 39,775 63,757.31 14 775.00 0.78 167,985 260.00 Jumlah Semester II 2020 617.35 208,070.00 333,525.69 1,234.70 262,873.75 421,373.32 1,233.30 262,712.50 421,114.85 1,234.80 262,873.75 421,373.32 30.00 1,675.00 1.68 980,980 1,160.00
GRK CO2
Sumber Emisi Periode ∆V (Volume
bahan Bakar) m ᶾ/Semester I
NCV
(TJ/kg.ton) ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E Co2 tonCo2/th Cerobong I Semester II/2020 333,525.69 43 860 12,333,779,915 73.4 905,299,446 Cerobong II Semester II/2020 262,873.75 43 860 9,721,071,152 73.4 713,526,623 Cerobong III Semester II/2020 421,114.85 43 860 15,572,827,004 73.4 1,143,045,502 Cerobong IV Semester II/2020 421,373.32 43 860 15,582,385,432 73.4 1,143,747,091 Genset Semester II/2020 1.68 43 860 61,942 73.4 4,547
GRK CH4
Sumber Emisi Periode ∆V (Volume bahan
Bakar) mᶾ /Semester I
NCV
(TJ/kg.ton) ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E CH4 tonCo2/th Cerobong I Semester II/2020 333,525.69 43 860 12,333,779,915 3.0 37,001,340 Cerobong II Semester II/2020 421,373.32 43 860 15,582,385,432 3.0 46,747,156 Cerobong III Semester II/2020 421,114.85 43 860 15,572,827,004 3.0 46,718,481 Cerobong IV Semester II/2020 421,373.32 43 860 15,582,385,432 3.0 46,747,156 Genset Semester II/2020 1.68 43 860 61,942 3.0 186
GRK NO2
Sumber Emisi Periode ∆V (Volume bahan
Bakar) mᶾ /Semester I
NCV (TJ/kg.ton
)
ƿ Solar
(kg/m3) Ek J/th IPCCo2 (ton
Co2/TJ) E NO2 tonCo2/th Cerobong I Semester II/2020 333,525.69 43 860 12,333,779,915 0.6 7,400,268 Cerobong II Semester II/2020 421,373.32 43 860 15,582,385,432 0.6 9,349,431 Cerobong III Semester II/2020 421,114.85 43 860 15,572,827,004 0.6 9,343,696 Cerobong IV Semester II/2020 421,373.32 43 860 15,582,385,432 0.6 9,349,431 Genset Semester II/2020 1.68 43 860 61,942 0.6 37