CO2 CH4 N2O 1. Heat Exchanger (HE) Pelayuan Cerobong I Semester II/2019 2.499.245.277 749.774 99.970 2. Heat Exchanger (HE) FBD Cerobong II Semester II/2019 811.043.862 243.313 32.442 3. Heat Exchanger (HE) TSD II Cerobong III Semester II/2019 738.951.075 221.685 29.558 4. Heat Exchanger (HE) TSD I Cerobong IV Semester II/2019 703.905.969 211.172 28.156
5. Genset 450 kVA Genset Semester II/2019 108.683.112 44.001 880
4.861.829.295 1.469.945 191.006
Total Semester II/2019
REKAPITULASI PERHITUNGAN EMISI SUMBER GAS RUMAH KACA YANG BERASAL DARI PABRIK PENGOLAHAN TEH
Hasil Perhitungan Emisi (m3) Periode
Sumber Emisi
No. Kode Cerobong
GRK UNTUK CO2 (Diesel & Biomassa)
Nilai Kalori Masing-Masing Bahan (LHV) (Low Heating Value)
Data Laju Alir
Nama Bahan Jumlah kalori (Kilo Kalori) Laju Alir Emisi Sem II/2019 Satuan
Cangkang 4000 Kcal/Kg 4.000.000 Kal/Kg 956.023 Joule/kg Cerobong I 0,0299520 m3/jam
Diesel 9240 Kcal/liter 9.240.000 Kal/Liter 2.208.413 Joule/liter Cerobong II 0,0291600 m3/jam
Cerobong III 0,0265680 m3/jam
Cerobong IV 0,0253080 m3/jam
Perhitungan Emisi Gas Rumah Kaca berasal dari Faktor Emisi IPCC Genset 450 kVA 0,0271080 m3/jam
Dengan Rumus:
E = A x EF
dimana:
A = Energi Bahan bakar (Ton Joule) A = LHV x Laju Alir x Waktu Operasi EF = Faktor Emisi
Sumber Emisi Periode Laju Alir
(m3/Jam)
LHV (Nilai Kalori)
Jam Beroperasi
(Jam)
Faktor Emisi (EF) (Ton CO2/Ton
Joule)
Jumlah Emisi (m3)
Cerobong I Semester II/2019 0,0299520 956.023 872,80 100.000 2.499.245.277 Cerobong II Semester II/2019 0,0291600 956.023 290,93 100.000 811.043.862 Cerobong III Semester II/2019 0,0265680 956.023 290,93 100.000 738.951.075 Cerobong IV Semester II/2019 0,0253080 956.023 290,93 100.000 703.905.969
Genset Semester II/2019 0,0271080 2.208.413 24,50 74.100 108.683.112
Jumlah Kalori (dlm Kalori) Jumlah Kalori (dalam Joule)
GRK UNTUK CH4 (Diesel & Biomassa)
Nilai Kalori Masing-Masing Bahan (LHV) (Low Heating Value)
Data Laju Alir
Nama Bahan Jumlah kalori (Kilo
Kalori) Laju Alir Emisi Sem II/2019 Satuan
Cangkang 4000 Kcal/Kg 4.000.000 Kal/Kg 956.023 Joule/kg Cerobong I 0,0299520 m3/jam
Diesel 9240 Kcal/liter 9.240.000 Kal/Liter 2.208.413 Joule/liter Cerobong II 0,0291600 m3/jam
Cerobong III 0,0265680 m3/jam
Cerobong IV 0,0253080 m3/jam
Perhitungan Emisi Gas Rumah Kaca berasal dari Faktor Emisi IPCC Genset 450 kVA 0,0271080 m3/jam
Dengan Rumus:
E = A x EF
dimana:
A = Energi Bahan bakar (Ton Joule) A = LHV x Laju Alir x Waktu EF = Faktor Emisi
Sumber Emisi Periode Laju Alir
(m3/Jam) LHV (Nilai Kalori)
Jam Beroperasi
(Jam)
Faktor Emisi (EF) (Ton CH4/Ton
Joule)
Jumlah Emisi (m3)
Cerobong I Semester II/2019 0,0299520 956.023 872,80 30 749.774
Cerobong II Semester II/2019 0,0291600 956.023 290,93 30 243.313
Cerobong III Semester II/2019 0,0265680 956.023 290,93 30 221.685
Cerobong IV Semester II/2019 0,0253080 956.023 290,93 30 211.172
Genset Semester II/2019 0,0271080 2.208.413 24,50 30 44.001
Jumlah Kalori (dlm Kalori) Jumlah Kalori (dalam Joule)
GRK UNTUK N2O (Diesel & Biomassa)
Nilai Kalori Masing-Masing Bahan (LHV) (Low Heating Value)
Data Laju Alir
Nama Bahan Jumlah kalori (Kilo Kalori) Laju Alir Emisi Sem II/2019 Satuan
Cangkang 4000 Kcal/Kg 4.000.000 Kal/Kg 956.023 Joule/kg Cerobong I 0,0299520 m3/jam
Diesel 9240 Kcal/liter 9.240.000 Kal/Liter 2.208.413 Joule/liter Cerobong II 0,0291600 m3/jam
Cerobong III 0,0265680 m3/jam
Cerobong IV 0,0253080 m3/jam
Perhitungan Emisi Gas Rumah Kaca berasal dari Faktor Emisi IPCC Genset 450 kVA 0,0271080 m3/jam
Dengan Rumus:
E = A x EF
dimana:
A = Energi Bahan bakar (Ton Joule) A = LHV x Laju Alir x Waktu EF = Faktor Emisi
Sumber Emisi Periode Laju Alir
(m3/Jam) LHV (Nilai Kalori)
Jam Beroperasi
(Jam)
Faktor Emisi (EF) (Ton N2O/Ton
Joule)
Jumlah Emisi (m3)
Cerobong I Semester II/2019 0,0299520 956.023 872,80 4 99.970
Cerobong II Semester II/2019 0,0291600 956.023 290,93 4 32.442
Cerobong III Semester II/2019 0,0265680 956.023 290,93 4 29.558
Cerobong IV Semester II/2019 0,0253080 956.023 290,93 4 28.156
Genset Semester II/2019 0,0271080 2.208.413 24,50 0,6 880
Jumlah Kalori (dlm Kalori) Jumlah Kalori (dalam Joule)
Waktu Operasi Bahan Bakar Waktu Operasi Bahan Bakar Waktu Operasi Bahan Bakar Waktu Operasi Bahan Bakar Waktu Operasi Bahan Bakar 1 Juli 2019 176,37 78.330 58,79 44.193 58,79 44.193 58,79 44.193 1,5 90,00 2 Agustus 2019 156,12 62.190 52,04 39.563 52,04 39.563 52,04 39.563 2,5 130,00 3 September 2019 153,94 52.900 51,31 37.090 51,31 37.090 51,31 37.090 1,5 60,00 4 Oktober 2019 113,16 60.960 37,72 33.320 37,72 33.320 37,72 33.320 5,5 260,00 5 November 2019 118,23 23.750 39,41 24.122 39,41 24.122 39,41 24.122 8 360,00 6 Desember 2019 154,98 61.000 51,66 35.662 51,66 35.662 51,66 35.662 5,5 260,00
872,80
339.130 290,93 213.950 290,93 213.950 290,93 213.950 24,50 1.160,00 Jumlah Semester II 2019
PTPN VI UNIT USAHA DANAU KEMBAR DATA ISIAN WAKTU OPERASI & BAHAN BAKAR
No Bulan Tahun Cerobong I (HE Pelayuan) Cerobong II (HE FBD) Cerobong III (HE TSD II) Cerobong IV (HE TSD I) Genset 450 KvA