MANAJEMEN PROYEK LANJUT

Advance Project Management

Dr. Ir. Budi Susetyo, MT

Fakultas

TEKNIK

Program Magister

SIPIL - MK

(2)

Bagian Isi

Bagian Isi

1. PM and Project financial management

2. Money and time relationship

3. Evaluasi proyek

4. Analisis ketidakpastian dan resiko proyek

5. Analisis financial proyek

6. Perencanaan sumberdaya keuangan proyek

7. Pengawasan dan pengendalian sumberdaya keuangan proyek

UTS

2

UTS

8. Studi kasus project financial management

9. Studi kasus perhitungan money and time relationship

10. Studi kasus evaluasi proyek

11. Studi kasus evaluasi dan resiko proyek

12. Studi kasus cashflow proyek

13. Perencanaan cashflow proyek

14. Protap pengawasan dan pengendalian proyek

UAS

(3)

Studi

Studi Kasus

Kasus Evaluasi

Evaluasi Resiko

Resiko

P

k

P

k

Proyek

Proyek

(4)

Evaluasi Resiko Proyek

Pada bagian ini terkait studi kasus evaluasi resiko proyek perlu diperhatikan berbagai ketentuan atau persyaratan terkait alokasi resiko pada kontrak proyek. Kontrak tersebut akan mengatur peran dan keterlibatan para pemangku kepentingan, meliputi :.

1. Bencana alam atau force majeure. Ketentuan ini akan mengatur pihak pemilik dan pelaksana tentang biaya yang perlu dikeluarkan terkait hal ini.

2. Pengantian kerugian atau Indemnification yang terjadi akibat pihak ketiga

3. Pertanggungan atas resiko kerugian atau liens, biaya yang harus ditanggung antara pemilik dan pelaksana untuk asuransi akibat kerugian yang mungkin terjadi dari pihak ketiga seperti demo buruh,

k h dll

4

kerusuhan, dll.

4. Biaya terkait hukum perburuhan atau ketenagakerjaan

5. Biaya akibat kondisi tapak, seperti biaya tak terduga yang harus dikeluarkan akibat dari kondisi tapak. 6. Biaya atas kerusakan pada fasilitas

7. Biaya akibat keterlambatan atau penundaan pekerjaan 8. Biaya untuk keselamatan dan kesehatan pekerja 9. Biaya terkait perijinan, keamanan, ketertiban 10. Lain2

Perhatikan kasus berikut dan buat kajian pada studi kasus proyek yang sedang diamati. Perhatikan berbagai ketentuan pada kontrak konstruksi terkait resiko proyek.

(5)

Case 1.

Example 1: A Contract Provision Example with High Contractor Risk

"Except where the sole negligence of COMPANY is involved or alleged, CONTRACTOR shall indemnify and hold harmless COMPANY, its officers, agents and employees, from and against any and all loss, damage, and liability and from any and all claims for damages on account of or by reason of bodily injury, including death, not limited to the employees of CONTRACTOR, COMPANY, and of any subcontractor or CONTRACTOR, and from and against any and all damages to

property, including property of COMPANY and third parties, direct and/or consequential, caused by or arising out of, in

while or in part, or claimed to have been caused by or to have arisen out of, in whole or in part, an act of omission of CONTRACTOR or its agents, employees, vendors, or subcontractors, of their employees or agents in connection with the performance of the Contract Documents, whether or not insured against; and CONTRACTOR shall, at its own cost and expense, defend any claim, suit, action or proceeding, whether groundless or not, which may be commenced against COMPANY by reason thereof or in connection therewith, and CONTRACTOR shall pay any and all judgments which may be recovered in such action, claim, proceeding or suit, and defray any and all expenses, including costs and attorney's fees which may be incurred by reason of such actions, claims, proceedings, or suits."

Comment: This is a very burdensome provision for the contractor. It makes the contractor responsible for practically

every conceivable occurrence and type of damage, except when a claim for loss or damages is due to the sole negligence of the owner. As a practical matter, sole negligence on a construction project is very difficult to ascertain because the work is so inter-twined. Since there is no dollar limitation to the contractor's exposure, sufficient liability coverage to cover worst scenario risks will be difficult to obtain. The best the contractor can do is to obtain as complete and broad excess liability insurance coverage as can be purchased. This insurance is costly, so the contractor should insure the contract price is sufficiently high to cover the expense.

(6)

Case 2.

Example 2: An Example Contract Provision with Medium Risk Allocation to Contractor

"CONTRACTOR shall protect, defend, hold harmless, and indemnify COMPANY from and against any loss, damage, claim, action, liability, or demand whatsoever (including, with limitation, costs, expenses, and attorney's fees, whether for appeals or otherwise, in connection therewith), arising out of any personal injury (including, without limitation, injury to any employee of COMPANY, CONTRACTOR or any subcontractor), arising out of any personal injury (including, without limitation, injury to any employee of COMPANY, CONTRACTOR, or any subcontractor), including death resulting therefrom or out of any damage to or loss or destruction of property, real and or personal (including property of

COMPANY, CONTRACTOR, and any subcontractor, and including tools and equipment whether owned, rented, or used by CONTRACTOR, any subcontractor, or any workman) in any manner based upon, occasioned by , or attributable or related to the performance, whether by the CONTRACTOR or any subcontractor, of the Work or any part thereof, and CONTRACTOR shall at its own expense defend any and all actions based thereon, except where said personal injury or property damage is caused by the negligence of COMPANY or COMPANY'S employees. Any loss, damage, cost expense or attorney's fees incurred by COMPANY in connection with the foregoing may, in addition to other remedies, be deducted from CONTRACTOR'S compensation, then due or thereafter to become due. COMPANY shall effect for the

benefit of CONTRACTOR a waiver of subrogation on the existing facilities, including consequential damages such as, but not by way of limitation, loss of profit and loss of product or plant downtime but excluding any deductibles which shall exist as at the date of this CONTRACT; provided, however, that said waiver of subrogation shall be expanded to include all said deductible amounts on the acceptance of the Work by COMPANY."

Comment: This clause provides the contractor considerable relief. He still has unlimited exposure for injury to all

persons and third party property but only to the extent caused by the contractor's negligence. The "sole" negligence issue does not arise. Furthermore, the contractor's liability for damages to the owner's property-a major concern for contractors working in petrochemical complexes, at times worth billions-is limited to the owner's insurance deductible, and the owner's insurance carriers have no right of recourse against the contractor. The contractor's limited exposure regarding the owner's facilities ends on completion of the work.

(7)

Case 3.

Example 3: An Example Contract Provision with Low Risk Allocation to Contractor

"CONTRACTOR hereby agrees to indemnify and hold COMPANY and/or any parent, subsidiary, or affiliate, or COMPANY and/or officers, agents, or employees of any of them, harmless from and against any loss or liability arising directly or indirectly out of any claim or cause of action for loss or damage to property including, but not limited to,

CONTRACTOR'S property and COMPANY'S property and for injuries to or death of persons including but not limited to CONTRACTOR'S employees, caused by or resulting from the performance of the work by CONTRACTOR, its employees, agents, and subcontractors and shall, at the option of COMPANY, defend COMPANY at CONTRACTOR'S sole expense in any litigation involving the same regardless of whether such work is performed by CONTRACTOR, its employees, or by its subcontractors, their employees, or all or either of them. In all instances, CONTRACTOR'S indemnity to COMPANY shall

be limited to the proceeds of CONTRACTOR'S umbrella liability insurance coverage."

Comment: With respect to indemnifying the owner, the contractor in this provision has minimal out-of-pocket risk.

(8)

1. Hendricson, Project Management for Construction, Web Version, 2003

2. Zulkarnain Djamin, Perencanaan dan Analisa Proyek, Universitas Indonesia, 1984

Pustaka

Referensi

Dokumen terkait

Program SHT ini juga ditujukan untuk mendukung program besar pemerintah Kota Surabaya yaitu Sparkling Surabaya yang memiliki tujuan pengembangan pariwisata Surabaya

Maka dari permasalahan tersebut dibuatkan sistem informasi manajemen syiar berbasis web dimana dalam pembuatannya menggunakan bahasa pemrograman Ruby dan Rails sebagai

Adapun juduk yang penulis ambil pada penulisan skripsi ini yaitu “ Media Pembelajaran Interaktif Bahasa Arab untuk anak Muslim Usia Dini Berbasis Web2. Adapun penulisan

laporan keuangan tri wulan yang telah di publikasikan  Untuk angka pada harga saham di gunakan nila rata – rata. antara harga tertinggi dan harga terendah

Self assessment system dan penagihan pajak dengan surat paksa secara simultan berpengaruh terhadap penerimaan pajak.. Kata Kunci: Self Assessment System, Penagihan

Kota Tripoli adalah kota tentera Salib yang pertama menghasilkan Aloi denier dengan. ciri-ciri Frank sama ada menggunakan nama Bertram (1109-1112) atau yang

isometric otot quadriceps dan latihan closed kinetic chain terhadap peningkatan aktivitas fungsional pada penderita osteoarthritis knee , terdapat saran yang

Hasil penelitian yang dilakukan peneliti menunjukan bahwa tidak ada hubungan antara riwayat keluarga yang pernah menderita mioma uteri dengan kejadian. mioma