Directory UMM :Journals:Journal Of Policy Modeling:Vol22.Issue1.2000:
Teks penuh
Gambar
Dokumen terkait
The model developed is based upon the delay time concept where because of an absence of PM data, the process parameters and the delay time distribution were estimated from failure
Thus, in order to ®t structural contingent claims models to monthly time series of yields on generic US corporate bonds, we construct monthly variables to serve as proxies for
Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time..
In doing so, the proposed framework relates cost, time and quality performances to three operational processes (physical transformation, product development and material #
In this paper we have analyzed a problem of setting reorder points (or safety stocks) of a popula- tion of items, subject to a restricted set of possible values (expressed as
Although this intuition is correct, the actual analysis is more complicated, as both opportunity cost and value of increased process knowledge are functions of time and
A problem of structure optimization of a series}parallel production system is considered where redundant producing elements (machines) and in-process bu!ers are included in order
The analysis clearly indicates that the impact of Inter-arrival time variation mainly regards the agil- ity performances (i.e. lead time, work in process, average bu!er size,