DAFTAR PUSTAKA
Bector dan Chandra. 2005. Fuzzy Mathematical Programming and Fuzzy Matrix Games. Springer. Germany.
Chen, L. S., Cheng, C. H. 2005. Selecting IS Personnel Using Ranking Fuzzy
Number by Metric Distance Method, European Journal of Operational
Research. 160 (3): 803-820.
Demeulemeester, E. L., Herroelen, W. S. 2002. Project Scheduling A Research Handbook. Kluwer Academic Publishers. United States of America.
Dimyati, T. dan Dimyati, A. 1999. Operation Research Model-Model Pengambilan Keputusan. Sinar Baru Algesindo. Bandung.
Heizer, J., Render, B. 2009. Operations Management Manajemen Operasi. Salemba Empat. Jakarta.
Klir, G. J., Folger, T. A. 1988. Fuzzy Sets, Uncertainty, and Information. Prentice-Hall. United States of America.
Laksito, B. 2005. Studi Komparatif Penjadwalan Proyek Konstruksi Repetitif
Menggunakan Metode Penjadwalan Berulang (RSM) dan Metode Diagram Preseden (PDM). Media Teknik Sipil. Surakarta.
Lee, K. H. 2005. First Course on Fuzzy Theory and Applications. Springer. Berlin.
Setiadji. 2009. Himpunan & Logika Samar - Serta Aplikasinya. Cetakan Pertama. Graha Ilmu. Yogyakarta.
Shankar, N. R., Sireesha, V., Rao, K. S. and Vani, N. 2010. Fuzzy Critical Path
Method Based on Metric Distance Ranking of Fuzzy Numbers,
International Journal of Math. 4: 995-1006.
Shankar, N. R., Sireesha, V., and Rao, P. B. 2010. An Analytical Method for
Finding Critical Path in a Fuzzy Project Network, International J.
Contemp. Math. Sciences. 5: 953-962.
Sireesha, V., Rao, K. S., Shankar, N. R. and Babu, S. S. 2012. Critical path
analysis in the network with fuzzy interval numbers as activity times,
International Journal of Engineering Science and Technology (IJEST). 4: 823-832.
Soeharto, I. 1997. Manajemen Proyek dari Konseptual sampai Operasional. Erlangga. Jakarta.
Susilo, F. 2006. Himpunan dan Logika Kabur serta Aplikasinya. Graha Ilmu. Yogyakarta.