Optimalisasi Penjadwalan Proyek Menggunakan Fuzzy Critical Path Method (Fuzzy CPM) Berdasarkan Metric Distance Rank pada Bilangan Fuzzy

N/A
N/A
Protected

Academic year: 2017

Membagikan "Optimalisasi Penjadwalan Proyek Menggunakan Fuzzy Critical Path Method (Fuzzy CPM) Berdasarkan Metric Distance Rank pada Bilangan Fuzzy"

Copied!
2
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

Bector dan Chandra. 2005. Fuzzy Mathematical Programming and Fuzzy Matrix Games. Springer. Germany.

Chen, L. S., Cheng, C. H. 2005. Selecting IS Personnel Using Ranking Fuzzy

Number by Metric Distance Method, European Journal of Operational

Research. 160 (3): 803-820.

Demeulemeester, E. L., Herroelen, W. S. 2002. Project Scheduling A Research Handbook. Kluwer Academic Publishers. United States of America.

Dimyati, T. dan Dimyati, A. 1999. Operation Research Model-Model Pengambilan Keputusan. Sinar Baru Algesindo. Bandung.

Heizer, J., Render, B. 2009. Operations Management Manajemen Operasi. Salemba Empat. Jakarta.

Klir, G. J., Folger, T. A. 1988. Fuzzy Sets, Uncertainty, and Information. Prentice-Hall. United States of America.

Laksito, B. 2005. Studi Komparatif Penjadwalan Proyek Konstruksi Repetitif

Menggunakan Metode Penjadwalan Berulang (RSM) dan Metode Diagram Preseden (PDM). Media Teknik Sipil. Surakarta.

Lee, K. H. 2005. First Course on Fuzzy Theory and Applications. Springer. Berlin.

Setiadji. 2009. Himpunan & Logika Samar - Serta Aplikasinya. Cetakan Pertama. Graha Ilmu. Yogyakarta.

(2)

Shankar, N. R., Sireesha, V., Rao, K. S. and Vani, N. 2010. Fuzzy Critical Path

Method Based on Metric Distance Ranking of Fuzzy Numbers,

International Journal of Math. 4: 995-1006.

Shankar, N. R., Sireesha, V., and Rao, P. B. 2010. An Analytical Method for

Finding Critical Path in a Fuzzy Project Network, International J.

Contemp. Math. Sciences. 5: 953-962.

Sireesha, V., Rao, K. S., Shankar, N. R. and Babu, S. S. 2012. Critical path

analysis in the network with fuzzy interval numbers as activity times,

International Journal of Engineering Science and Technology (IJEST). 4: 823-832.

Soeharto, I. 1997. Manajemen Proyek dari Konseptual sampai Operasional. Erlangga. Jakarta.

Susilo, F. 2006. Himpunan dan Logika Kabur serta Aplikasinya. Graha Ilmu. Yogyakarta.

Referensi

Dokumen terkait

Keuntungan (kerugian) dari perubahan nilai aset keuangan dalam kelompok tersedia untuk.

difference between delivered and wasted feed. Apparent digestibilities and pancreatic enzyme activities along the intestinal tract were determined from analyses of chyme from

The present study was designed to determine the quantitative dietary crude protein requirement for optimum growth of juvenile American eel using a practical fish-meal- based diet and

[r]

Memiliki kemampuan untuk mengelola program pembelajaran (termasuk memilih dan menentukan tema-tema materi yang akan diberikan kepada anak, baik harian, mingguan

Dalam berbagai proses pengujian statistika, data yang digunakan haruslah berskala interval, oleh karenanya, jika data yang dimiliki oleh peneliti berskala ordinal maka

Rakit komponen yang belum terpasang, sambung kelistrikan dan saluran udara Distribution Station sesuai diagram kelistrikan dan pneumatik yang telah tersedia.. Rancang programnya

Hal ini menunjukkan bahwa prosentase sumbangan pengaruh variabel independen terhadap variabel dependen sebesar 27.0% atau variasi variabel independen yang digunakan dalam