WINRIP DOC IFR CTC IFR Q1 Jan Mar 2015 20150331 00268
Teks penuh
Dokumen terkait
Goods, Non Consulting Services, Consulting Services and Incremental Operating Cost under part 2 of the project Amount charged to SA (USD eqv) Subtotal WB Financing %
Disbursement Contract Procurement Contract Supplier/ Nationality Contract Contract Amount Payment realization Code Cat.. It is not necessary to contact us if the above information
1-A Western Indonesia National Roads lmprovement projectt. Loan IBRD
Appendix 2 : Report At The End of The Quarter (March 31, 2015) Appendix 3 : Detailed Summary of the Project Cost Monitoring Appendix 4 : Procurement Management of Civil Works..
DIREKTORAT JE]IDERAL BTilA MARCA EATUAlI I(ERJA PETBINAAl{ ADNIilISTRASI DAH PELAKSAlIAAl{ PEl{GEIIDAtI AlI PHtN.. Jafan Pattimura
PERIOD JANUARY – MARCH 2016. For
To date, with the exception of one (1.) package, all the safety audits at Design Stage were furry completed with corresponding individual report for each packages
sesuai konltak tefsebut dt atas' maka PihakKedua berhak menerima pembayaran dari pihek Kesatu dengan lraian. sebagal