• Tidak ada hasil yang ditemukan

WINRIP DOC IFR CTC IFR Q1 Jan Mar 2016 SA 20160331 00389

N/A
N/A
Protected

Academic year: 2017

Membagikan "WINRIP DOC IFR CTC IFR Q1 Jan Mar 2016 SA 20160331 00389"

Copied!
51
0
0

Teks penuh

(1)

INTERIM FINANCIAL REPORT

PERIOD JANUARY – MARCH 2016

(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)

Referensi

Dokumen terkait

All four (4) AWP-1 contract packages were signed by the end of 2013 with actual work commencement on January 2014.. During the quarter three (3) contract packages for AWP-2 and

TECHNICALASSISTANCE FOR SUPPORT OF THE PROJECT MANAGEMENT UNIT.. coRE TEAM CoNSULTANTS

Appendix 2 : Report At The End of The Quarter (March 31, 2015) Appendix 3 : Detailed Summary of the Project Cost Monitoring Appendix 4 : Procurement Management of Civil Works..

To date, with the exception of one (1.) package, all the safety audits at Design Stage were furry completed with corresponding individual report for each packages

INTERIM FINANCIAL REPORT

[r]

Project : P090990 -western rndonesia National Roads rmprovement project. To: Directorate General of f)ebt

Pejabat Pembuat Komitmen Pernbjnaan Adminiskasi dan Pelaksanaan Pengendalian PHLN. Pattimura No, 20, Kebayoran Baru - Jakarta Selatan. Untuk selanjutnya disebut PIHAK