TECHNICAL
ASSISTANCE
FOR SUPPORT OF
THE PROJECT IVANAGE[/ENT
UNIT
CORE
TEAM CONSULTANTS (CTC}
QUARTERLY
REPORT
For
the First
(1't) Quarter
of the year
2016
T
I
I
I
MINISTRY
OF
PUBLIC WORKS
& HOUSING
DIRECTORATE
GENERAT
OF HIGHWAYS
DIRECTORATE
OF
PLANNING
Core TeamConsultant
for
Western Indonesla National Roads Improvement
pFject (WINRIp)
IBRD Loan t{o.8043_IDI
I
I
t
I
I
I
I
I
I
I
I
I
t
I
Team
Cc: 1.
4. 5. 6 7. 8.
I
10. 11. 1aIJ 14. 15. 16. 17. 18. 19.
20.
Our Ref.No.
Subject
Directorate General of Highways, MpWH
Jt. Patrmura20
Kebayoran
BaruJakarta Selatan
IndonesiaAttention
:
lr.
Agusta
E.Slnulingga,
M.TOfffcer
in charge
pMUWtNRtp
In
compliance
with ltem
No3
(List
of
Documenis
To Be
Delivered)
of
our consultancy contract, we
submit
[,T.t"X'tNo|[j.n"tnerlv
Progress neport coverint
tn"
nlfi"ici".rt"r
of the year 2016
(January,
February, Thisreport
6
reproduced
andsubmitted in
twenty
(20)copies for distribution to all
concerned authori.es.
3:?#3"t3r:inilffimment
cr
additional
intrmation that need to be
incorporatod in
the
Reporr,
preaseERA
), Kementrian Keuanaan
, Dit.Jen Bina MarqaBina
Marga
ina MargaMarga
U-PERA
Kementrian Dalam
Neoerl r Negerielaksana Witayah I, DJBM
etaksanaWilayah l, DJBM
etaksanaWilayah l,
DJBI\,4dan Petaksanaan pengendalian pHLN
Yongma Engineering
Co, Ltdr-/.r.
Epadascon permata Engineering
Consultant
-FIJCPl
PERENTJA|,IA DJAiA in subconsultancy withei
yongrna tngineeringco. Ltd and=tpT. EpadEscon permara I ngineering consultanl CTC Office: Jl. Ciniru Vtt No. 25, (ebayoran Baru, Jakart3 Setatan, 12180
I
7
I
J
I
I
{
fr.r.
'El
4{
B
E
-o
E
(J
o
J
trl
a
o
E
G
t
I
I
I
I ,t
l,;.i
z
-1
..
a--t
';2
:
-{
5?
+ J
Si
' t, F -1
lF .J
t
i,s
ts
s
I
t
I
t
I
I
1
U)
J
Tq
a<
v,7
Et
i
,1
I
t
a
T
I
F
2016
Quarterly
ProgressReport
1*
Quarter
:-lanuary-February-March
I
I
I
I
Table
OfContents
Executive
1.1
Current lmplementation
Situation
...
12
General
...,..,....
5
4
5
Road
Safety
Audit
I
l
t
I
I
I
I
t
t
I
I
I
t
I
I
2016
Quarterly
progress Report
l'tQuarter
:
January-February-l4arch
I
I
I
t
I
I
li
I
ANNEXES
Annex
P-l
Annex
P-2Annex
P-3Annex
P-4Annex
P-5Annex
P-6Annex
P-7Annex
P-11Annex
P-13Annex
P-15Annex
P-17Annex
P-19Package
No.
1 (Biha-
Krui)
Package
No.
2 (Pd. Sawah-
Sp.Empat)
Package
No.
3(Manggopoh
-
pd.Sawah)
Package
No.4
(tpuh
-
Bantal)
Package
No.
5 (Sp. Rampa-
poriaha)
PackageNo.
6 (Ps.pedati-
Kerkap)
Package
No.
7(lndrapura
-
Tapan)
Package
No.
11(Bantal
-
Mukomuko)
Package
No.
13 (Sp. Rukis-
Tj.
Kemuning)
Package
No. 15
(Sibolea-
Bts. Tapsel)Package
No.
17 (Sp. Gunung Kemala-
pugung Tampak)
PackageNo. 19 (Lais
-
Bintunan)
I
t
I
I
l'
I
I
I
I
t
2016
Quarterly
Progress Report
1'tQuarter
:January-February-March
T
I
I
I
APPENDICES
Appendix
1
:Appendix
2
:Appendix
3
:t
I
I
t
I
I
I
I
I
I
t
I
I
I
I
Appendix
5Appendix 6
Appendix
7Appendix
8Appendix
9Appendix
10Appendix
11Appendix
12Appendix
13Appendix
14Appendix
15Appendix
15
Appendix
17Appendix
5-1Appendix
S-2Appendix
5-3Appendix
5-4Disbursement
and
Expenditures Status
Report
At
The
EndofThe euarter (March
2016)
Detailed Summary of
the
Project
CostMonitoring
Procurement
Planfor
Consulting
Serviceslist
of
Namesof Community
Representative Observers
(CRO)Anti Corruption Action
Plan (ACAp)Activity
Progressof Community
Representative Observers
(CRO)list
of Appointed Third
Party
Monitors
(TpM)
Progress
of
Third
Party Monitoring
(TpM)
Activities
Complaints
Handling Mechanism System
(CHS)Work Activities On Publication/Disclosure
Environmental
Safeguards
Environmental Management
plan {EMp)
Compliance
Status
of
Monitoring of Environmental Mitigation
Overall
LandAcquisition
Status asof
end
of
March
2016
Statusof
Road SafetyAudits
Summary
of
Workshops
andTrainings
In 201.3up
to
March
2016
Summary
of
Studies and Reports
(Environmental Activitv)
Summary
of
Studies and Reports
(SocialActivity)
Community
Development
Activity
Reports
2016
Quarterly
Progress Report
1*
Quafter
: January-February-March
I
t
I
I
Executive
Summary
1.1
Currentlmplementationsituation
1.1.1
Civll Works
I
I
I
t
I
t
I
I
I
lmplementation of the wrNRrp project is schedured
to
be impremented into three
{3)Annual
Work
Programs
(AWp's). The implementation starts
with the
ments (detailed
design
drawings including associated bidding documents),
tendering stage
(procurement
of
works) and
the actual
civil works
construction
implementation.
The
orlginal implementation
schedules
of the three
(3)Annual
work
programs (AWps)
arescheduled
inthree
(3) phases, namely
;AWp_l to start in mid_2011and
to
be
completed on
the
last quarter
of 2OL4, AWp-2 is expected
to
begin in mid ZOlZ with
target date of completion
by
mid-2016 and AWp-3
isexpected
to
start during the
earrypart of 2013
andto
becompleted during the middle part of 2017.
However,
due
to
some
unavoidable circumstances
the
original
implementation
schedules
did not materialized.
Based
on the
present
status
of the
program
implementation
progress,
a
revised
implementation
schedure,the project
rmprementation
Timerine
(asshown
on page 2)
isto
be implemented in order to
accommodate the
originaly
derayed schedure
into the
remaining
time
frame
of the
WlNRlp program
until the
expiry date
of
the
loan
agreement
bythe
endof December
20u.
shown on
page
3
isthe current construction
status of the implementation relative to
the
project rmplementation Timeline. Table
I
shows
the
present status,
Table
1 -lmplementation
Status
asof
Endof the ln
euarter
on March
31,2016
I
I
I
I
I
I
L Krui- Biha Completed
2 Padang Sawah -Sp,Empat
3 ManBgopoh - Padangsawah Completed
lpuh - Bantal 5 Sp, Rampa- Poriaha
6 Ps. Pedati- Kerkap
7 Indrapura -Tapan
8 gts.Pariaman - Manggopoh
10 Sp. Ernpat- Sp. Air Balam
1,1, Bantal- Mukomuko
Kambang- Indrapura
Sp. Rukis - TJ.KemuninS 14 Painan'Kalrlbang
Slbolga - Ets.Tap Sel
seblat
-
lpuh17 5p.Gn.Kefiala - Pg.Tampak 19 Lais - Bintunan
20 Lubok Al'rng - Siclncih
LubukAlunB - kuraijati
TOTAI:
74 11 4Note i Package No.9 and package No.1B cnncelled lrom the program.
[image:7.597.67.563.40.818.2]-c
IE
6
p
,9
Iil
6t
=
(tl
OJ
E
IF
(y
i,t
l,l
I
I
I
I
I
I
I
E,'
ni
* :.
o- .:6 ,'i
t:
i'. a
;l:ri L
t
'6
.9
I
;
,
i,
,.i.ta
| ".r
i
;) r:
ill:ii,.:ll
i!,
!i:
i:!
a
'd
EF
(l
OJ
qJ
E
;
c)
Bs;
:
!:at),
I
I
t
I
I
!'I
CJ
I
ol
9l
a!. I
>.1
T
4)
E
CY
q
c{l
I
I
I
T
I
I
T
T
I
I
I
I
I
T
E
o-qJ
d
I
Rt
Y
o-
_-u
t
{o(o
N
T
I
I
I
T
I
6
!:
ot:
di
I
8
s
b
E.
E"
tnF
dEi
s5i
3-'6
Fd
n*!!:
!*iieE
ET
9E
.i;
d<
e
o
j'
3:!
G ia3
EB
E
z
3
o
0,
q,
o
ruE
lE
E
"84:
E
dJ'a
c
c
(JE
OJ
I
o. E
o
lod
6
E
|o
z
.s
(lJ
E
a
c?
6
c)
3
I
2016
Quarterly
Progress
Report
lsQuafter
: January_February_March
1.1.2
Consultancy
Services
I
I
Contract
signed
Actual
Moblllzation
ct-c
Jul201-2 5 Nov 2012 12 Nov 2012DSC Jul20L2 11Jun 2013 19Jun 20'13
Capacity Building for Djsaster Cancelled
I
t
I
T
I
T
I
I
t
I
I
t
I
t
t
1.1.3
Western Indonesia Nationa
Slope Protection Design and Management
Stillto be Procured
Capacity Building
for
Environmental Management Cancelled Capacity Building
for
Road Safety Cancelled
The technical
assistance
for consultancy
of
,.Capacity Building For
Di:Reduction" has been deleted,
but
replaced by
,Technical
Assistance
onSlope
Stabilization
Designand
Management,.
To accommodate
the new
consultancy assistance,
allocated funds from
twhich
isoriginally intended
for
"Capacity
Building
for
Disaster
Risk Redubeen realigned
to
Category
2
to
fund
the implementation
of
,,Slope Designand
Management".
3oods
At the
end
of this reporting quarter,
no goods
were procured.
Roads Improvement Project
iaster
Riskfor
Study
lategory
3
ction"
hasProtection
t
I
I
I
2016
Quarterly
Progress Repoft
1+Quarter
: January-February-March
t,2
Current
Status
of
Loan
At the
end
of
this quarter (March 2015) some usD 52.94 million of
the
USD150.38 million
forcasted expenditures representing 60.L5%
of
the
available
loan had
been disburseq.
Disbursement
is
considerably behind schedule
by
39.97%
of the
forecast expenditures,
while 71.05%
of the time
hasalready elapsed
with the main reason for the delay
being
the
long period
waiting for the implementation of the remaining civil
works contracts
and slow
progress
of the thirten(13) on-going construction
packages.Total disbursements during
this
Quarter amounted
to
usD 4.659
million
covering
the
payments
for
"statement of
work
Accomplished' (Mc)
to
civil works
contractors
of
the
on-going
construction
packages,
advance payment
to
contractor
of contract
packages
gand replinesment
of
special Account
under category
2.
Details
of
the
Disbursemenrs
and Expenditures
Status
are presented in
Appendix
1.A
more detailed and updated status of
the
loan are
fully
described
and presented in the
Thirtenth
(13'n) Quarterly Financial Report covering
the 1't
euarter
(January, February,
March) of the
Year
2016which
isunder preparation
and will
besubmitted separately.
1.3
Current
Problems and
Action
Required
I
I
l,
I
t
I
I
I
Program
Activity
Responsibility
AWP.1
2 Nos, Under construction completion stages.
2 Nos. Completed and provisionally handed over. lJnder defects liability period for two (2) years.
Contractor
DSc and CivilWorks Project Manager
AWP-z & AWP-3
I
Nos.Two (2) out of the eight (8) packages under constructionare way
behind schedulewith
huge percentagesof
negative progress slippages. Contractors
of
the problematic packagesshall
resolve immediately the current prroblems.2 Nos. Contract Agreementjust recently signed. 3 Nos. Contract Agree ment for signing
2 Nos. For confirmation by World Bank and Ministry to award the contrad . Some issues are
stillto
be resolved.2 Nos. Cancelled from the program.
Contractor and PPK and Dsc
POKJA
Civil work Project Manager, DSC, POKJA and CTC
PMU and MPW
Capacity Building
for
Disaster Risks Reduction Cancelled
Slope Protection Design and Management
Stillto be procured
5ub-Directorate
of
Environmental & Road
Safe{
DTA.DGHCapacity Building
for
EnvironmentalManagement Cancelled
Capacity Building
for
Road Safety Cancelled
I
I
I
I
I
t
2016Quarterly
Progress Report
1*Quarter
: January-February-March
t
t
I
T
I
I
I
t
General
2,1
ReportingRequirements
Ouarterlv
Proeress Reoorts:
This
ls the ninth
(gth)
euarterly
progress
Report
asrequired and
stipulated in
CTC'sconsultancy contract
andthe
Loan
Agreement. prior
to
the
production
of
this
report, Monthly
progress Reports have been prepared
anohave dealt
with
all
aspects
of the works. This
report
attempts
to bring
the situation
up
20'J,6.
Financial
Monitorlng
ReDorts: These have been prepared
for
each
quarter
since the
beginning
of
2013
with ihe first
Report, issued
in
May 2013,
covering
the
period
January
-
March
2013.
Since
that
date quarterly reports have
been prepared
and
submitted
regularly.
Report Pedod Covered Dste lssued
Financlal Monitoring Report No. 1 January 2013
-
March 2013 May 15,2013 Financial Monitoring Report No.2 April 2013 -June 2013 August 15, 2013 Financial Monitoring Report No. 3 luly 2013-
September 2013 November 15, 2013 Financial Monitgring Report No.4 October 2013-
December 2013 February 15,2014 Financial Monitoring Report No.5 January 2014-
March 2014 May 15, 2014 Financial Monitoring Repon No.6 April2014-June 2014 August 15, 2014 Financlal MonitorinB Report No.7 July 2014-
September 2014 November 15, 2014 Financial Monitoring Report No.8 October 2014-
December 2014 April 7, 2015 Flnancial Monitoring Report No.9 January 2015-
March 2015 August 31, 2015 Financial Monitoring Report No. 10 April 2015-
June 2015 October 2, 2015 Financial Monitoring Report No, 11 July 2015 -September 2015 December 16, 2015 Financial Monltoring Report No. 12 October 2015-
December 2015 February 10,2016 Financial Monitorlng Report No. 13 January 2016-
March 2016 under PreparalionCTC
Monthlv ProEress
ReDorts:
These
report
have been prepared covering each full
month
since January 2013. Subsequent
reports have been submitted
on a
regular
monthly
basis.Environmental Studles
and
Activiw
Reports: These report
have been
continuously
updated
and
submitted to
PMU
for submission
to
World
Bankfor
Bank's issuance
of
NoObjection
Letter
(NOL).
Appendix
S-1 shows
the
summary
of
submitted
of
Reportscovering
eachcontract
packagesince
inception of the
project.
Soclal
lmpact Studies and
Activiw
Reoorts: These report
which
mainly
dealt
with
the
implementation
of
"Land Acquisition Resettlement
Action
plan',
(LARAp)
have
been
continuously
submitted
to
PMU
for
submission
to
World
Bank
for Bank's
issuance
of
No
Objection
Letter
(NOL).
Appendix S-2
indicates
the
updated summary
of all
su
bmitted
Reports.
t
I
t
I
I
t
I
These
Reports
have been
prepared
and
continuously
submitted
to
the Client.
Appendix
S-3
shows
the
summary
of
submitted Reports
from the
very
first
(1't)
submittal up
to
latest report before
the
Quarter ended.
ReDorts:
These Reports
were
consolidated
and
reviewed by
CTCas
prepared
and
submitted
by
the
appointed
CRO's
and
TPMs
of the
respective
contract
package.
Their reports were
based
on
their
actual
observations and monitoring during
2016
Quarterly
Progr€ss Report
1$Quarter
: January-February-Marcn
I
I
I
I
bid meetings, site visit and bid openings
of
every
contract
package
under procurement.
Appendix
S-4shows
the updated summary of
all
reports which were forwarded
to
pMU.
2,2
loan
Status
The
agreed
allocation of
loan
funds from the original
loan
agreement together with the
%disbursed
to the
end
ofthe
quarter
date
(March
ZL,ZOI6I
is Dresented inTable
2
2.3
Financial Management
S-Curve
for
Financial
Progress
A
report
atthe
end
of the quarter (March
31,20j.6)
ispresented
inAppendix
2I
I
I
I
I
t
t
I
I
I
t
I
l
T
I
Des.rlpdon
Amount UsS for the 16 Quare' ot 2016
Iot€l olsbuEed by WB to End MaEh 31,
2016ln UsS
Eettef ment and capacity
E)(pansion of National Roads
220,4m/mo,m 3,369,796.03 43,986,071.ss 47 ,354,857 .5A 2t 49
2 Part 2
lmFlementation Support
17,0@,m.0o 1,299,000.co 4,284,880.83 5,5$,a808a 32€5
3 Part 3
flo.d Sedor lnstitutional 0 0,00 0 o o
Cont insency for Disaster A is k
0 0 o 0
12,6m,mm 0,m 0 o o
OdEInElLo.n
2S0,0oo,000,@ 4$6At7 .O3 4t,269,952.38 52,93A,7 4a.41 21,18
E
E in tl
tur6 5!34 mll(21,13*) _
10.0c
o00
I
I
I
t
2016
Quarterly
Progress Report
1oQuarter :
January-February-March
2.4
Project
Cost
Monitoring
A detailed summary
of the
project cost monitoring in tabular
format
is presented
asAppendix
3
atthe
endof this report.
2.5
World
Bank
lmplementation
Review Mission and
Site
Visit
During
this
quarter period
ending
on
March
2016,
the
World
Bank,s
Technical
andFinancial
Audit
Consultants
(TFAC)
mission performed
and
conducted
sit€
audits on
The mission visited the
two
(2) contract
packages
from
February Zg, ZOf6
to
March
4,2016 in order
to
accessthe
following
:.
The quality of works implemented by the
Contractor,
site
management
and
quality control and compliance
of
equipment.
.
The actions taken
by
the
Design Supervision
Consultant
(DSC) concerning
qualiW control role.
.
Follow-up inspection
of
what
actions
taken up by
the
Contractor
on
the
remaining non-conformance works
that
were previously inspected way back in
November 2015.
As
the
period ended,
the
regular
monthly
progress meeting was held
to
review
and/or
update
the
implementation progress and monitoring
the
key
activities on
the Agreed
Key
Action
Plans".
Also
taken up
during
the meeting
was
the
presentations
of
the
results
of
the
TFACaudit
reports and recommendations
to
rectify
the
non-conformance findings.
An "Agreed
Key Action Plans"
for
progress compliance monitoring
of the
status
of
the
works on weekly, bi-monthly
and monthly intervals
isshown
inTable
3.Table
3"Agreed
Key Action and Plans"
Status as
of
end
of
lst
Quarter
I
I
I
T
I
I
t
t
I
I
I
T
t
I
I
No,
Action
By WhomUpdated Status
March 29, 2016 New Deadlines
t.
Review BERS of packages 14 and 16 Ban k.
April 1, 20162 Send signed contract extension of Package 4 to Bank PMU and CTC
.
DoneSend signed contract extension of Package 2 and 3 to
Bank PMU and CTC
.
Mid of February.
AprilS, 2016Submit si8ned contracts for packages 8 and 12 to Bank PMU and CTC
.
Done
5,
Inform the Bank about the steps DGH has taken/will take in the case
of
the misreDresentation of facts inthe
biddingof
Package8 in
responseto the
letter WINRIP/265 of December 9, 2015. lf DGH is not taking any steps, please inform as alsoPMU and CTC
.
Consultation withLegal Department onSorng
As soon as possible
Inform the gank the bidding process of package 10 PMU and CTC
.
February 1,2016.
April 8, 2016 [image:14.598.1.571.28.812.2]I
I
I
I
2016
Quarterly
ProgressReport
l*Quarter
: January_February_MarchNo,
Actlon
ByWhom
Updated Status
r|r'|arch 29,20L6 New Deadlines
7.
Send to Bank response to letter WlNRtp /279 of
January 12, 2016 regarding the extension of bid validilies
PMU and CTC
.
DoneInform the Bank about the plans regarding the Slope
Protection in Package 3
PMU, CTq
DSg WB
.
May 15, 20169.
Send technical
support
documentsfor
contractmodification of package 6 (40% increase)to Bank PMU and CTC
.
Donet
I
t'
I
I
I
I
I
I
I
I
I
I
t
t
10.
Inform
the Bank
about DGH'S plansto
cover theadditional drainage
and slope
protection requirements under packaBe 19PMU and CIC
.
May 15, 201611,
Send
a
letterto
DGH |.eBardingthe
swamp area inpackage 19 Bank
.
AprilS, 2016t2.
Publish the Request
for Manitestatlon
of Interestfor
the slope stabilization, design, and manaBement for
the Bank's review
Subdit Construction
Geotechnic
and Stability
and cTc
.
February 1, 2016Once the Bank
approves tne e-procurement system
Send
the
RfP forthe
slope stabilization, design, andmanaBement to Bank for NOL PMU and CTC
.
Done.
End of April 2016Send to the Bank the request for the extension of the
CTC contract PMU and CTC
.
Done-15
Send to the Bank the resFonse related to the contract modification to the DSC contract (end date December 201.6)
PMU and CTC
.
End of Feb 2016.
Mid-April2016L6.
send
to
the
Bank an updateof
the
environmental monitoringtable in annex4
includingthe informationon the auarries
PMU and CTC
r
End of April 20165end the envi.onmental management and monitoring
plans {RKPPL) for packages 5 and 17 to the Bank PMU and CTC
.
RKPPL package#05&17 will be
submit on mid of
Feb 2016
.
End ofApril201618. Carry
out the
workshopon
HtV/
A|DSfor
newpackages
PMU / C'tcl
DSC
.
2 June 2016(PackaBe No.7)
19.
Send
the tirst
environmental management andmonitoring implementation reports
tor all
packagesunder construction
to
the environmental
agencies(refer
to
annex
4
or
environmental safeguard compliance table)crc/DGH
Packages
No.2,4,6,11&19 end of April 201.6
.
PackagesNo.1,5,7,13,15
&
17 for of lune2016.
20.
Carry out environmental supervision missions jolntlywith the Environrrental Agency in order
to
make surecontractors cornply
with their
environmental management plans (RKPPL)PMU lCtC
/
Bank/
Env.ABency
.
April& May 2016I
I
I
t
2016
Quarterly
Progress Report
1$Quafter
: January-February-March
No. Action By
Whom
Updated Statut
March 29,2016 New Deadllnes
2L. Request additional budget for LARAP implementatlon
in 2016 (DIPA revision), especially for package 13 PMU
.
As soon as possible.
March 30/ 201617
Inform the Bank about the measures that will be taken
to accelerate LARAP implementation
for packages 12,
13,
14
15,20
and 21, which is riskingto
seriouslydelav the stan/imblementatidn o{ rhF
w6.((
PMU and cTc
.
April 15,2016t
I
I
t
I
I
I
I
I
I
I
I
T
I
I
23.
Submit
to the
Bank additlonal IARAP documentfor
package 16 PMU.
Mid-April 201624. Submit the IFR for January to Mdrch 2015 to the Bank
.
PMU.
lMay 15,2016Submit 2015 financial audit report to Eank
.
PMU andcTc
.
June 30,201626.
Disclose updated procurement plan after Bank
approvalin the Winrip website linked to MpW
Website
.
PMU.
February 5, 2016.
Done27.
Update the newsl€tter quarterly, including the Iist of
contracti, lmplementation progress, project related workshops and number, typology and status
of
complaints
r
PMU.
Every quarter.
Noted28,
Send quarterly newsletterto the civil societv forum in each project province in hard copyorthrough an
electronic mailing system
.
PMU.
Every quarter.
N oted?q
Provide feedback to the formalresponse
tothe
quality improvement support inspection reports TFAC
for packages 2, 3,
4
and 19r
Bank.
April 15, 2016?n
Provide a formal follow-up response
to
quality improvement support inspection reports TFACforpackage 1
r
PMU/Dsc.
March 31,201631.
Provide a fornalfollow-up response
to
quality improvement support inspection reports TFAC forpeckage 19
.
PMU/DSC.
April30,201632.
Provide a formalfollow-up responseto quallty improvement support inspectlon reports TFAC for
package 11
. PMU/Dsc
.
May 15, 201633
Regularl\/ submit the quarterly progress reports to the
Ba nk PMU
.
Each calendar.
Noted2.6
Project
Steering
Committee MeetinB
No
Steering Committee
meeting during this quarter.
2016
Quarterly
ProgressReport
1$Quarter
: January-February-MarcnI
T
I
T
Project Management and lmplementation
3.1
Procurement
Status
I
t
I
I
I
t
I
t
I
I
I
I
I
I
I
(A)
Civil
Works
Civil
Works are now being
implemented
in
Annual Work
programs {AWp)
which
have
All Contract Agreements
for the
four (4) AWP-1 contract
packageswere signed by the
end
of
2013
with
actual
work commencement
on January
2014.Under
the other two
(2)
implementation
programs,
AWp-2
and AWp-3,
nine
(9)packages
were already procured
and
are
on-going construction, while and the other
six (6) packagesare
under final procurement
stages.
Table
4 Showsthe
actual
pre-construction and procurement status under the
implementation
schedules
AWP-2 andAWP-3
Table
4
No.
AWP.2
5 Sp. Rampa - Poriaha
Procured. Under construction since
the
issuanceof Notice To Proceed (NTP) on June 18, 20L5
6 Ps.
Pedati-
Kerkap Procured. Under construction sincethe
issuanceof Notice To Proceed (NTP) on March 11, 201.5
7 Indrapura
-
TapanProcured. Under construction since
the
issuanceof
Notice To Proceed (NTP) onDecember 10, 2015
8 Bts- Pa riaman
-
MaProcured.
Under
construction
since
the
issuanceof
Notice To Proceed (NTP)on
MarchSp. Empat
-
Sp.Air
BalamRevised
Bid Evaluation Report
(BER)and award
of Contract has been issued No Objection Letter(NOL)
on
February 22, 2016 bythe World
Bank.Announcement
and notification of awafd bvthe
Ministry
isstill
pending dueto
some issuesthat
I arestillto
be|."r:iu"1
___
]
Procured. Under construction since
the
issuance lof
Notice To
Proceed (NTP)on
February
23,Signing
of
Contract Agreement
by
the
contracting
parties was executed in January 28,2016. Bank issued NOL and Form 384 on March Bantal -
Mukomuko
Kambang
-
Ind ra puraWestern Indonesia National Roads Improvement project
[image:17.600.31.575.133.779.2]2016
Quarterly
Progres I1s
Quafter
: January-February-
Yla rchI
I
I
I
Sp. Rukis
-
Tj. KemuningProcured. Under construction since
the
issuance of Notice To Proceed
on July
22,201,5
AWP-3
Bid Evaluation Report {BER) as well as the
Painan
-
Kambangfecommenoalton
IoI
award ot contract has been forwardedto World
Bank on March 21, 2016for
request of issuanceof
No Objection Letter {NOLl.ocured. Under construction since the issuance Notice To Proceed (NTP) on November 20,
1sl
l
sed Bid Eval'ration Report has been
bmitted
to
World Bank on March 21, 2016,me issues are still
to
be resolved priorta
luance of NOL,
.**a.
Una.,
""*tru"tion
rin"" tn"
isru"ni"
]77
. Sp.Gn.Kernala-
Pg.Tampak
ofNoticeTo
Proceed (NTP)onSeptember4,
icured. Under construction since the issuance l
Notice To Proceed (NTP) on March 11, 2015
I
ntract
has
Iissued No Objection Letter (NOL) on
h 23, 2016 by
the WrnO
U:nO:_
]
Evaluation Report {BER)
and
lommendation for award of contract
has
I
issued No Objection Letter (NOL)
on
I
h 23, 2016 by
the World
Bank. Note : Packages No,g and No.18 are cancelled from the program.I
Presented in
Appendix
4 isthe current
status
of procurement management.
(B)
Services
The
CoreTeam
(CTC), Design& Supervision Consultant
(DSC),and
the others
Capacity
Building Consultancv status are discussed in Section
3.4.3,2
lmplementation
Status
-
Civil
Works
As
of
end
of this reporting quarter
ending
(March
2016),
there are currently eleven
{11)contract
packagesthat
are under construction. Construction implementation of
two
(2)contract
packages
under
AWP-I.
program have recently been
completed
with
the
issuance
of
"Taking Over
Certificates"
(TOC)and
are
now
currently under
defects
liability
period
for
twenty four
(24)
months effective on
the
dav
the
TOCwere
issued.Details
of
each
contract
package areshown
ln Table
5.I
I
t
I
o
F
I
I
I
t
t
I
t
I
I
I
I
-tro
lz
E
Cfl
ti
0
E
ts
5
IN
-
a)6
d
E
o)
E
o
E
!
o
cl
.e
z
,E
dJ
c
oc
I
(u
3
3a
2016
Quarterly
ProgressRepoft
lstQuarter
:January-February-March
I
I
I
I
Activities
done
during this month were
repair
and restoration
of deteriorated existing
pavements,
roadway
excavation,
embankment formation,
spreading of
granular
pavement for roadway widening,
asphalt paving,
structural works, construction of stone
masonry side ditches,
stockpiling of raw material, production of
crush aggregates,
other
minor works, bridge construction
and
finalization
of
',Field Engineering,,surveys.
The
four
(4)contract
packagesunder implementation program
AWp-1
were not
from
15to
125calendar
dayswere granted extending the completion
dates
at the
earliest
onJanuary
L0, 2015and
the
latest on
April
!9,20f6.
Physically,
two
(2)ofthe
contract
packages hasalready
been
fully completed
and
recently
handed
andtaken
over by
the
Client,
while the two
(2)other
packagesare
about
to
becompleted next month (April
2016).
Under
the
implementation
program AWp-2 and AWp-3,
there
are
currently eight
(8)contract
packagesthat
are on-going
construction implementation
and one
(1)contract
package have
just
been issued Notice To Proceed
(NTp)to
commence
works.
physical
progress
of two
(2)of the
packagesare
laggingfar
behind schedule
with
negative
sfippages
of
-42.77y"
and-57.87%
while
progress
for the other
six (G) packages arestill
slightly
on
or behind
schedule.
Generally,
with the exception of the two
(2)contract
packageswith
hugenegative
slippages,
the
civil works implementation
isfairly
in
the right direction.
Progress
status
of the thirteen
(13) on-going civil
works contracts
asof this reporting
period
areshown in Table
5.Following are
brief
status of
the thlrteen
(13)on-going construction contract
packages
:Package
No.
1:
Blha
-
Krui
The
contract
package issubstantially completed
on January
20,2016 and
provisionally
handed over
to the
Employeer.
Taking
OverCertificate of the
Works
hasbeen issued
bythe
Engineeron the
same day
of
the
Provisional Hand
over
(PHo)
which
is alsothe starting
date
for "Defects Notification
Period" until after
t\lvo
(2)years reckoned
from the
issuance
of
the
TOC.A more
detailed
previous status
of this
package ispresented
in ANNEXp-l
Executlve
Summary
Report.
Package
No. 2
: PadangSawah
-
Sp.Empat
(tncluding Air
Gadang
Bridgel
As
the
endof
this reporting period, the
overall
work
progress
basedon
the
revised
schedule
is96.83%
with at
least 3%of the works still
to
bedone until the
revised
expiry
of the
comDletion
time.
To date,
the remaining
25calendar
daysleft from the
revised extended
construction
perlod
ismore
than
enough
for the contractor
to
complete
the remainins works until the
I
I
li
T
I
I
I
I
l
t
I
T
I
t
I
-c
Pio
=
a
o
l
{.t
T
c-(! fc
(q
I
I
I
I
E
0)
'd
E
q.) E (Us
o-E
6
.F
(E
z.
.ao
o
E
c
c
a
In(u=
o
.G
I
I
I
I
I
I
I
I
t
I
I
E
tg
I
tf,
o
l3
E
2016
Quarterly
ProgressReport
1$quarter
: January-February-March
I
I
I
I
revised
take
over
date
on
April
19, Z016,but this will
depend
with the
progress and
completion of Air
Gadang Bridge.
With
regard
to the construction of
Air Gadang Bridge,
allthe
20 pre-cast girders
required
were launched
in place and
two
(2) spansout
ofthe
four
(4)
spansof
bridge deck
has beencasted
asof
end
of this quarter
endinB
March
2016.
Construction of approach
roads
are also
on-going during the period.
ANNEX P-2
Executlve
Summary Report present
amore
detailed
status of
the Contract
Package.
Package
No. 3 :
Manggopoh
-
PadangSawah
The
contract
packages issubstantially completed
some
few
daysbefore the target date
of compfetion on March 20,2016and provisionally
handed over
to the
Employeer
on
March 1Z
2016.
Taking Over
Certificate of the
Work
hasbeen
issued
bythe
Engineeron the
same day
of
the
Provisional Hand Over
(PHO)which
is alsothe starting
date
for,,Defects Noflfication
Period"
until after two
(2)years reckoned
from the
issuance
ofthe
TOC.A more
detailed
status
of the project
progress are
shown
in
ANNEX p-3,,Executive
Summary Reporf
.Package
No. 4 :
lpuh
-
Bantal
Although the Contractor
has beengranted time extension of completion from
January
9, 2016to April
11., 2016,the current
status
of this contract
packagestill
remain in
critical
situation
with
respect
to the
revised
completion date.
Durihg
this quarter ending
March 2016,
the actual overall
progress
is 91.02%with
still
8.38%
ofthe
work still to
becompleted.
Based on
the Contractor's performance during the
course of
the contract,
it
seems
doubtful that the remaining
8.38%of the works
can
becompleted
on
the target date
of
completion,
considering
that only
17calendar
daysare
remainlng to complete the
balance
of the works.
Shown
in ANNEXP4
"Executive Summary Report,'
showing
the
details and status
of the
project.
I
I
lr
I
I
I
t
t
l'
I
I
I
I
I
2016
Quarterly
ProgressReport
1sQuarter
:January-February-March
T
t
I
I
t
t
t
I
Package
No. 5
:Sp.
Rampa-
Poriaha
To date, since
the
commencement
of
works
started nine (9) and half months
ago,
the
actuaf physical
work
progress
isonly
10.11% against scheduled
work
progress
of
SZ.Ba%.The delayed works
further accumulated to -42.77%atthe
end
of this month.
with
only
48%or eight
(8)
months of contract time are left
and a huse
deflcit of unfinish
attained
unlessdrastic actions
from
the part of the Contractor will
be
enforced.
Other problem
that
hampered
the slow progress of the works which shall be
addressed
immediately
by the
concerned
authorities is
the
unexpected
ROW
problems wherein
some
improvements
such astrees
andother obstructions
exist along
the alignment.
Considering
that
the
current problems are resolved anwime soon and
in
order
for
the
Contractor
to
catch-up
with
the
schedule
to
meet
the
completion date,
at
least
11%progress per
month
have
to
be achieved.
ANNEX P-5
"Executive Summary Report"
shows
the Contractor,s
progress Schedule.
Package
No. 6
:Kerkap
-
Ps.Pedati
Based
on
the original
progress schedule ending on
the quarter month of March
2016,
the
actuaf
overall
physical
work accomplished is
27.55%
out of
85.30% schedule
or
-57.81%
negative slippage.
Work
during
the
whole
1*
quarter
were very
minimal
and
were
mainly focused on
Asphalt
Pavement and
Routine Maintenance Work
items-As
the period ended,72% of the works
still
remain
to
be
done while
84%of the contract
tirne
have already elapsed
and
based
on the
Contra€tor,s performance and
average
progress
per month during
the
past
13
months, completion date on
June
2, 2016 is not
possible.
The major
work item
which conributed
to
the
huge negative slippage is
the
Aspahalt
Pavement.
To date only
9.10%
out of
the
70.65%
component
of
whole
works
has been
accomplis hed.However,
in
the
event
that the
recently concluded ,,Field
Engineering,,
results with
proposed 90 calendar days
time
extension
will
be formally approved,
the
completion
date
will
be moved
forward to
August 31, 2016.
ANNEX P-6
"Executive Summary Report" shows
the
complete details
of
the
contract
package.
Package No.
7: Indrapura
-
Tapan
The
contract
packagejust recently commenced on December
lO,
201,6.During
the period from the
issuance
of
Notice
To
proceed (NTp)
until
end
of this quarter,
contractor concentrated on
the
preparation
for
mobilization
at
site and finalization
of
the
FieldEngineering.
I
t
I
I
I
I
t
t
t
t
2016 Quarterly Progress
Repoft
1"
Quarter
: January-February-March
I
t
I
I
During
the
period
only small
percentages
of
the
General,
Structure
and
Routine
Maintenance works
have
been done accumulating to just
0.14% progress
for the
whole
month
ANNEX
P-T
"Executive Summary
Reporf
shows
the
complete details
of
the
contract
package.
Package
No.
8
:Bts. Kota
Pariaman
-Manggopoh
Notice To Proceed
(NTP)to
commence
the works
has beenissued on
March
23,
ZOf6.
At the time of the
preparation
of
this Report,
there
is
still
no work schedule
{S-Curve)submitted
bythe Contractor.
Package
No.
11
:Bantal
-Mukomuko
Based
on
the
revised schedule due
to
approval of
the
results
of "Field
Engineering,,,
the
actual overall
progress
attained by
the
Contractor up
to
end
of this
period
is
3a.a7%
against 43.85%.
At the
end
of
the
13th month
of
the contract
period, Contractor,s performance with
respect
to
their work
progress
seem
to
be
satisfactory
as
the
negative
slippage
havebeen minimized
to
a single
digit.
In
other
words,
the
Contractor have
no difficulty
in
compf
eting the
works on
or before the target
date
completion February
II,2Ol7
.For
more
details
of the
Contract
Package,
refer
to
ANNEX
p-11 ,'Executive Summary
Report".
Package
No.
13 : Sp. Rukis-
Tj. Kemuning
The
current work
progress
showed
sign
of slowing down
for the
pastthree (3) months
asonlv
0.24yoprcgress
has beenachieved
during this period.
At
the
end
of
the
month,
the
overall
work
accomplished
is
L4.62%
of
the
26.94%
schedule
at
month's end. The negative slippage suddenly dropped
from
-5.99%
in
the
preceeding
month to
-12.32%
this month.
The negative
slippage
is
still
manageable
at the
moment, provided
the
Contractor will
take immediate
actions
on problems
that are hampering the work progress. Barring
any
unforseen
circumstances
that
will
disrupt
or
interrupt the construction implementation,
it
isexpected
that the
project can
becompleted on-tirne or
evenahead
of the
schedule.
Details
ofthe
work
progressare
shown
in ANNEX
P-13"Executive Summary Reports',.
PackageNo.
15: Sibolga-
Bts.Tapsel
The
contract
packagejust recently
commenced
on November
20,
ZOLS.During
the
period from the
issuance
of
Notice
To
Proceed
(NTP)until end of this month,
Contractor concentrated
on
the preparation
for mobilization
atsite
.I
I
I
I
I
I
T
T
t
I
I
t
I
t
2016
Quarterly
Progress Report
1*Quarter
:January-February-March
I
I
I
I
At
the
end
of
this
reporting quarter (March
31, 2016)
actual overall
progress
achieved
isL.69%
of
the
5.57% schedule.
During
the
whole quarter,
the
Contractor
mainly
concentrated
on
mobilization
to
site and minor
roadworks
on
Drainage, Earthworks,
Structures and
Reinstatement
and
Minor
Works-Detailed
and
work
progress
of
the
contract
package
are
shown
in
ANNEX
p-15
"Executive Summary
Reporf
.The
current status
of the
sub-project is
fairly
being
implemented
as
evidenced
by
not
incurrring any negative slippage since
the
Contractor commenced
works
way
back
in
September
4,
2015.
Overall progress
to
date
is 6.15%against
6.10%schedule, or
the
progress
isslighty
ahead
of schedule
by +0.06%.lf
Contractor can maintain the trend
of their
monthly
progress,
there is no reason
that
the works could not
be
completed on or before the target date of completion
on
August
23, zoL7.
ANNEX P-17
"Executlve Summary Report''
shows
the
complete details
and
work
progress
of the project.
Package
No.
19 :
Lais-
Bintunan
Based
on
corrected
revised progress schedule
by
incorporating
the
results
,,FieldEngineering:'and
125
calendar days
time
extension,
the
progress
of
work
have
considerably
improved
ascompared
in
the previous months.
At
the
end
of the
period,
the total
overall progress attained is 80.18%
against
79.68%
schedule or +1.10% ahead
ofschedule.
Complete details
ofthe
contract
packageare
shown
inANNEX
p-19,,Executive Summary
Reporf'.
I
I
t
I
I
I
I
I
l
I
I
I
I
t
2016
Quarterly
Progress Report
1$Quarter
:January-February-lvlarch
I
I
I
t
I
I
l{
Variation
Order
Details
To
date, amendements and/or variation orders for six
(6)
on-going construction contract
packages
were already processed and approved by Pejabat Pembuat
Komitmen
(PPK),the
authorize
Office
to approve
financial disbursement.
The approved variations
orders
were
dueto the following
reasons
:Change
of
PPK SubProject Manager.
Contract
amount revision due
to
Technical Justification
of
Field
Engineering
results.
Revision of time for completion (time extension).
Contract
amount revision due
to
contract price adjustment (escalation
of
unit
rates).
f)
Changeof Contracto/s authorize representative.
In regards
with
additive cost variations, original cost
of
the six (5) on-going construction
contract
packages increases
bv
Rp. L64,77L,L73,000, while
the
variation orders
for
the
other contract
packagesare still under evaluation
by
DSCand
PPKwhich
isexpected
that
the resulls will
increasesthe respective
original contract amounts.
ln
anticipation
of future
claims
for
varied
works
by the Contractors,
a
revised costs
of
additional
11%of the Original
Costfor
eachcontract
package covered by AWP-I
hasbeen
considered
and 5% cost increases
for
packages
under AWP-2 and AWP-3
to cover
any
Variation
Orders that may arise during
the implementation of the Works,
Presented in Table 7 are details
of
Variation Orders
for
the
four (4) sub-projects
under
AWP-I and two
(2)contract
packagescovered
byAWP-2
andAWP-3
b)
d)
e)
I
I
I
I
I
l'
I
I
t
I
I
I
2016Quarterly
Progress Repoft
1*Quarter
: January-February-March
I
Table
7-
Details
of Amendments (Variation Orders)
I
I
I
PackageNo.Original Contract
Amount
(Rpl
Amend
No,Variation
+/-{Rp)Revised
Contract
Amount
(Rp)
Vatiance %
I rme
Extension
Reason FoI Change
'|
I
t
T
I
I
I
I
I
I
I
I
T
t
1 734,909,27I,0O0 2 +19,163,804,000 154,073,015,000 +74.2O
c
3 0 154,073,0L5,000 +74.2O B
0 l-54,073,015,000 +14.24 D
2 197,936,699,000
L 0 l-97,936,699,000 0
2 0 197,936,699,000 0 F
3 0 197,936,699,000 o B
4 +28,776,518,000 226,7).3,277 ,000 +14.54 C
5 0 226,71,3,277 ,000 +74.54 105 D
6
+5I,472,232,000 249344,93L,OOO +25.97 E3 143,688,963,000
L 0 143,688,963,000 o A
2 0 143,588,963,000 o F
3 0 143,688,963,000 0 B
+21,468,809,000 1,65,L57,772,000 +74.94
c
5 0 165,L57,712,000 +74,94 7q D
+40,251,909,000 I83,940,a12,0AO +24.O1 E
4 186,936,750,000
L 0 186,936,750,000 o
2 +9,501,334,000 196,438,084,000 +5.08
c
0 196,438,084,000 +5.08 B
0 196,438,084,000 +5.08 90 D
L7 224,899,777,000 1 0 224,599,717.O00 B
+33,711,586,000 262,61'r.303 ,ooo
+].l.73
c
1_9 3s,689,452,000 7 0 33,689,452,000 0 B
2 +10,730,308,000 44,479,7 60,000
r31.85
125 CDReason For Change I
A
-
Change of Engineer's Tea m Leader from V. Thiagarajah to Johnson Villar,B
-
Change of PPK sub Project Manager.C
-
Contract amount revision due to TechnicalJustification of Field Engineering resuits.D
-
Revision of timefor
cornpletion (time extension).E
-
Contract amount revision due to contfact price adjustments (escalation). F-Change
of Contractor's authorize representative.I
[image:27.598.31.584.96.825.2]t
2016
Quarterly
Progress Repoft
1oQuarter :
January-February-March
T
t
I
3.4
Consultancy
Services
Technical Asslstance
for Core
Team
Consultant
(CTC)to Support
the Prolect
Management
Unlt.
lead
Consultant:
PT.Pe]entjana
Djaja
CTC
Contract
No. 06-20/CTC[A/LN/8043/1112
was
signed
on
5
Nov 2012 between
the
Ministry
of
Public
Works,
Directorate
of
Plan DGHand
PT.Yongma Engineering Co. Ltd, PT.
Epadascon
Permata
Engineering
Consultant,
JVand
the
work
commenced
on
12 November2012.
Amendrnent
No.l
to
original contract
was signed
on October
25,2013
to accommodate
the increase in staffing requirements
with the following increase
in cost.
Amendment No. 2 is officially approved.
Proposed
amendment to the Original Contract
and
Amendment
No.
1are
additional man-months
for professional
and technical
staff for
international
and
local, replacement of foreign
and
local consultants
and
modification
to
various reimbursables
to
match
with the actual reouirements.
Amendment No. 3
has
already
been
approved. The amendment
covers
the extension
of
services
of
several
local professional and sub-professional staff beyond the end of their
respective dates
of completion
assignment
covered by Amendment
No. 2
which will
end
on March
6, 2015.Amendment
No.4 to the current
CTCContract (Original Contract and Amendements
1,2
and 3) was signed
on March
4
2016
and
to
expire
or completed on
December
31., 20L7,the
same
date
asthe expiry/closing date
ofthe
loan
agreement.
Based
on the
current progress of the Project, services
of
professional international and
Iocal
staff
as
well
as local
sub-professional
staff
have been extended beyond
their
respective dates
of assignment engagement covered by
Amendment
No.
3.The
amendment
covers
the reouirements of
CTCare as
follows
:Consultancy services
time extension
Additional/Modif ication to
TOR/Terms
of
Reference
Adjustment
of
input
schedule
for
Professional
Staff,
Sub
Professional
and
Supporting Staff
Amendment
to the
Team
Composition
Amendment of the
Staffing
Schedule
Modification
to the
Provisional Sums
Adjustment
of Remuneration paid
in
foreign currency
and local
currency
Adjustment
to the reimbursable
expenses
Amendment
to
Clause 6.1(b)
of the
Special
Condition
of Contract
I
I
li
t
I
I
I
I
l'
I
I
a
I
t
I
2015 Quarterly Progress
Report
1$euarter:
January-February-March
I
Presented
inTabl€
8 isthe
current status of cTc contract,
T
Table
I
Descrlptlon USD IDR
I
OrlginalContract including
10% VAT L,4p,4A70 23,ss6,940,000Amendment
No,l
includins 10% VAT L.447,517 24,664,792,500Combine Variance Against OriB ina I Contract +4.7204
I
Amendment No. 2 including
10% VATr,5o9,r77
24,704,544,150r
Variance Against Original Contract +7,4604 +4,87%I
I
I
I
I
I
I
I
I
I
T
I
Combine Variance Against Original Contract +5.gLo/.
Amendment
No.3 including 10% VAT L,473,91726,328,0s4500
Variance Against Origina I Contract +4,95o/6 +lL.760/0
Combine Variance Against Origina I Contract +9,29%
Amendment
No, 4 including 10% VAT 1,918,158 40,874,769,529Variance Aga inst Original Contract +36.58% +73,53%
Combine Variance Against Original Contract [email protected]%
Note
i
Combine variance (USD+IDR) is based on l. USD = Rp. 9,558 exchange rate used duringthe
time of signing
the original Contract Agreement.Technical Assistance
for
Design
& Supervision Consultant
{DSC}lead Consultant:
Renardet
5.A
DSC
Contract No.
KU.03.01/PPK-PR/W|NR|P/BXI0T/VV2OB
was signed
on
11
jun
20j.3
between
the
Ministry
of Public Works, Head of Regional
Office
for
National
Roadslmplementatlon,
DGHand Renardet
S.A. PT CiptaStrada,
PT. Daya CreasiMitravasa,
pT. Seeconsand
PT. Yodya Karya(Persero)Joint Venture
and
mobilized
on 19 June
2013.
Table
9 showsthe current
status
of
DSCcontract.
Table
9Note I
1)
DraftAddendum No.1 is stillsubject to approval by DGH with World Bank concuffence and issuance of No Objection Letter (NOL).2)
Figures with asterisk(*)are tentative pending approval
ofAddendumNo.l
I
2016
Quafterly
Progress Report
1sQuafter :
January-February-March
I
t
I
t
Technical Assirtance
for
Capacity
Bulldlng
for
Disaster
Risks
Reductlon
Lead
Consultant:
For
deletion
and
to
be replaced by another "Technical Assistance
for
Slope
protection
Design
and Managemenf' which
will
be implemented under
Category
2
of
the
Loan
Agreement.
Environmental Management
[ead Consultant:
Cancelled.
Technical Assistance
for
Capaclty
Building for
RoadSafety
Lead
Consultant:
Cancelled,
Procurement
Planfor
consulting services
is
presented in Appendix
S.3.5
lmplementation
of the Anti-Corruption
Action
plan
Communlty Representetive Officers
(CRO)To date,
the
selection
of
Comrnunity Representative Observers
(CRO)
has
been
LOO%completed
for
all
the nineteen
(19)
contract
packageswith
the
last
selection procees
was
conducted
on
November
!7,
ZO75in
Padang
for
Contract
packages
14, Z0 and 21.
The
overalltotal
numbers