QUARTERLY REPORT
For the Third (3
rd
) Quarter of the Year 2016
PT.PERENTJANA
OJAJA in subconsultilncywith
0
Yongma EngineeringCo.
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
Ltd
and
51PT.
EpadaSconPennata EngineeringConsultant
CTC Office:
JI.
Ciniru VII No. 25, Kebayoran Baru, Jakarta Selatan, 12180
Phone /Fax: (021) 7229823
y
U
\a.
'cn"R
...
:;;._,IR
~~
I\~S·
... ,
.1
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
oad Imp
=~~..
~~··~'PO~::.::iI::a~it
f~'~
·"~Yj
. eader
.
r::J1
)
If
~~"
eTC - WIN:-:'!p ./
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
r
Cc:
'PIIIJc,?q
_
•.__ ..- /
-.
/
_In~enn,'t
"I'
"".-
hi!"
~ .,...
1.
Direktur Jentteral:6iha-Marga
2.
lnspsktorat
Jenderal, Kementrian PU-PERA
3.
Direktur Transportasi - Bapperias
4.
Direktur Pengelolaan Kas Negara (PKN), Kementrian Keuangan
5.
Direktur Pengembangan Jaringan Jalan, Dit.Jen Bina Marga
6.
Direktur Jalan Bebas Hambatan, Perko\pan dan Fasilitasi Jalan Daerah, Dit.Jen Bina Marga
7.
Direktur Pembangunan J,alan, Dit.Jen Bina Marga
8.
Direktur
Prsservast
Jalan, Dit.Jen Bina Marga
·9.
Biro Perencanaan
&
KLN, Kementrian PU-PERA
10. Kepala Balai Besar Pelaksanaan Jalan Nasional
II
Medan
11. Kepala Balai Pelaksanaan Jalan
Nasional III
Padang
v
12. Kepala Balai Besar Pelaksanaan Jalan
Nasionat V
Palembang
13.
Kasubdit Keterpaduan Perencanaan
&
Sistem Jaringan, DPJJ - DJBM
1.4.
Kasubdit Mah.ajemen Konstruksi, DPJJ - DJBM
15..
Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengel1dalian PHLN
16. Th~ Wand
Bank
Office,
Jakarta
17. PT Perentjana Djaja
18.
Yongma Engineering Co, Ltd
19.
PT. EpadasconPermata
Engineering Consultant
20. File
This report is reproduced arid submitted in twenty (20) copies for distribution to all concerned authorities.
Should you have any comment or additional information that need to be incorporated in the Report, please
feel free to get in touch with us.
In compliance with Item No,3 (List of Documents To Be Delivere<;l')of our Consultancy Contract, we submit
herewith the Quarterly Progress Report covering the Third (3rd) Quarter of the Year 2016 (July, August,
September 2016).
:. Ir. Agusta E. Sinulingga, M.T
Officer in Charge PMU WINRIP
: Quarterly Progress Report for the Third (3rd) Quarter of the Year
2016
Subject
Attention
Directorate General of Highways, MPWH
JI.
Patimura 20 Kebayoran Baru
Jakarta Selatan
Indonesia
: 03_10/JJS/O/Q-3.2016
.
Jakarta, October 14; 2016
Perentjana Djaja
MINISTRY OF PUBLIC WORKS 8t HOUSING
DIRECTORATE
GENERAL
OF HIGHWAYS
DIRECTORATE
OF ROAD NETWORK DEVELOPMENT
Core Team Consultant for
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
1
1 Executive Summary
1.1 Current Implementation Situation
1.1.1 Civil Works
Implementation of the WINRIP Project is scheduled to be implemented into three (3)
Annual Work Programs (AWP's). The implementation starts with the preparation of
tender documents (detailed design drawings including associated bidding documents),
tendering stage (procurement of works) and the actual civil works construction
implementation.
The original implementation schedules of the three (3) Annual Work Programs (AWPs)
are scheduled in three (3) phases, namely ; AWP-1 to start in mid-2011 and to be
completed on the last quarter of 2014, AWP-2 is expected to begin in mid 2012 with
target date of completion by mid-2016 and AWP-3 is expected to start during the early
part of 2013 and to be completed during the middle part of 2017.
However, due to some unavoidable circumstances the original implementation
schedules did not materialized.
Based on the present status of the program implementation progress, a revised
implementation schedule, the Project Implementation Timeline (as shown on
Page 2
) is
to be implemented in order to accommodate the originally delayed schedule into the
remaining time frame of the WINRIP Program until the expiry date of the loan
agreement by the end of
December 2017
. Shown on
Page 3
is the current construction
status of the implementation relative to the Project Implementation Timeline.
Table 1
[image:4.595.138.538.486.758.2]shows the present status.
Table 1 - Implementation Status as of End of the 3
rd
Quarter on September 30, 2016
Note : Packages 9 and 18 are proposed to be deleted from the program.
Pack
Package Name
Contract
Under
Contract
For
Proc
No.
Sign
Construct
Signing
Process
1
Krui - Biha
Completed
2
Padang Sawah - Sp.Empat
Completed
3
Manggopoh - Padang Sawah
Completed
4
Ipuh - Bantal
Completed
5
Sp. Rampa - Poriaha
6
Ps. Pedati - Kerkap
7
Indrapura - Tapan
8
Bts.Pariaman - Manggopoh
10
Sp. Empat - Sp. Air Balam
11
Bantal - Mukomuko
12
Kambang - Indrapura
13
Sp. Rukis - Tj.Kemuning
14
Painan - Kambang
15
Sibolga - Bts.Tap Sel
16
Seblat Ipuh
17
Sp.Gn.Kemala - Pg.Tampak
19
Lais Bintunan
Completed
20
Lubuk Alung - Sicincin
21
Lubuk Alung - Kuraijati
T O T A L :
17
12
1
2
Western I ndonesia National Roads I mprovement Project
2
Project Implementation Timeline
Length C'tion
Km
Period
J N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
1
Krui - Biha
25,00
21 mth
2
Padang Sawah - Sp.Em pat
40,90
24 mth
3
Manggopoh - Padang Sawah
32,00
24 mth
4
Ipuh - Bantal
42,40
24 mth
5
SIMPANG RAMPA - PORIAHA
11,10 18 mth
11
BANTAL - MUKOMUKO
50,10 24 mth
13
SP RUKIS - TJ KEMUNING
56,30 24 mth
17
Sp.Gn.KEMALA - Pg. TAMPAK
36,80 24 mth
6
PS. PEDATI - KERKAP
25,00 15 mth
19
LAIS - BINTUNAN
11,60 10 mth
15
SIBOLGA - BATAS TAPSEL
36,00 27 mth
7
INDRAPURA - TAPAN
19,50 21 mth
8
BTS.Kt PARIAMAN-MANGGOPOH
46,80 24 mth
10
SIMPANG EMPAT - SP.AIR BALAM
61,70 24 mth
12
KAMBANG - INDRAPURA
55,20 24 mth
14
PAINAN KAMBANG
31,50 21 mth
16
SEBLAT IPUH
34,50 21 mth
20
LUBUK ALUNG SICINCIN
14,60 18 mth
21
LUBUK ALUNG KURAITAJI
16,80 18 mth
9
RANTAU TIJANG-KOTA AGUNG
42,00
The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
18
MUKOMUKO-BTS SUMBAR
25,80
The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
Original target :
715,60
km
ENVIRONMENT & SOCIAL SAFEGUARD
Revised target :
640,00 km
Prequalification
Detail Eng Design
LARAP Study
Road Safety
Owner's Estimate
Appraisal & Public Consultation
Procurement & Sign Contr
Bid Document
LARAP Implementation
Preparation for Commencement of Work
Standard Biding Document
COW
PROC
COW
PROC
COW
PROC
CONSTRUCTION
CONSTRUCTION
PROC
COW
PROC
COW
PROC
COW
PROC
COW
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
Pack
#
PACKAGE NAME
2012
2013
2014
2015
2016
2017
2018
OE & BD
DED
RSA & REVISED DED
OE & BD
CONSTRUCTION
PROC
COW
Review DED & RS
Review DED & RS
Review DED & RS
Review DED & RS
Review DED & RS
PQ
CONSTRUCTION
Review DED & RS
PQ
PROC
COW
Review DED & RS
PQ
CONSTRUCTION
COW
CONSTRUCTION
PROC
CONSTRUCTION
PQ
RS
Proc
COW
SBD
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
DED
RSA & REVISED DED
OE & BD
DED
RSA & REVISED DED
OE & BD
OE
BD
DED
SBD & OE + BD
Rev-DED RS
DED
Rev-DED RS
Rev-DED RS
DED
COW
PROC
COW
CONSTRUCTION
OE & BD
DED
Rev-DED RS OE & BD
OE & BD
DED
OE & BD
COW
CONSTRUCTION
SBD & OE + BD
SBD & OE + BD
PQ
PROC
PROC
CONSTRUCTION
CONSTRUCTION
DED
RSA & REVISED DED
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
3
Updated : September 30, 2016
Length C'tion
Km
Period
J N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
Core Team Consultant (CTC)
40 mth
IMPLEMENTATION
Time extension for sevices
Design & Supervision Cslt (DSC)
42 mth
IMPLEMENTATION
Proposed time extension for sevices
TA for De v.of Slope Stabilization, De s ign & Manage m e nt
PROCUREMENT
1
Krui - Biha
25,00
21 mth
8 Jan'14
2
Padang Sawah - Sp.Empat
40,90
24 mth
6 Jan'14
3
Manggopoh - Padang Sawah
32,00
24 mth
6 Jan'14
4
Ipuh - Bantal
42,40
24 mth
10 Jan'14
5 SIMPANG RAMPA - PORIAHA
11,10
18 mth
18 Jun'15
8 Dec'16
11 BANTAL - MUKOMUKO
50,10
24 mth
23 Feb'15
11 Feb'17
13 SP RUKIS - TJ KEMUNING
56,30
24 mth
11 Feb'17
17 Sp.Gn.KEMALA - Pg. TAMPAK
36,80
24 mth
04 Sep'15
23 Agt'17
6 PS. PEDATI - KERKAP
25,00
15 mth
11 Mar'15
31 Aug'16
19 LAIS - BINTUNAN
11,60
10 mth
11 Mar'15
CONSTRUCTION 300+125 days
08 May'16
15 SIBOLGA - BATAS TAPSEL
36,00
27 mth
20 Nov'15
06 Feb'18
7
INDRAPURA - TAPAN
19,50
21 mth
10 Dec'15
30 Agt'17
8
BTS.Kt PARIAMAN-MANGGOPOH
46,80
24 mth
PROC
23 Mar'16
31 Dec'17
10
SIMPANG EMPAT - SP.AIR BALAM
61,70
24 mth
12
KAMBANG - INDRAPURA
55,20
24 mth
23 May'16
CONSTRUCTION 604days
16 Jan'18
14
PAINAN KAMBANG
31,50
21 mth
PROC
3 aug'16
CONSTRUCTION 516 days
31 Dec'17
16
SEBLAT IPUH
34,50
21 mth
CONSTRUCTION
20
LUBUK ALUNG SICINCIN
14,60
18 mth
CONSTRUCTION 486 days
31 Dec'17
21
LUBUK ALUNG KURAITAJI
16,80
18 mth
CONSTRUCTION 486 days
31 Dec'17
Original target :
715,60
km
ENVIRONMENT & SOCIAL SAFEGUARD
Revised target :
640,00 km
Prequalification
Detail Eng Design
LARAP Study
Road Safety
Owner's Estimate
Appraisal & Public Consultation
Procurement & Sign Contr
Bid Document
LARAP Implementation
Preparation for Commencement of Work
Standard Biding Document
ICB
1 Sep' 16
1 Sep' 16
IMPLEMENTATION
SBD & OE + BD
Rev-DED RS
Rev-DED RS
Rev-DED RS
PQ
PROC
CONSTRUCTION 450+90 days
CONSTRUCTION
RSA & REVISED DED
OE & BD
Review DED & RS
Review DED & RS
PQ
PQ
Review DED & RS
Review DED & RS
PROC
CONSTRUCTION 720 days
CONSTRUCTION 720 days
CONSTRUCTION 649 days
PROC
PROC
DED
CONSTRUCTION 630 days
Review DED & RS
SBD & OE + BD
RSA & REVISED DED
OE & BD
DED
RSA & REVISED DED
OE & BD
SBD & OE + BD
DED
RSA & REVISED DED
OE & BD
DED
DED
30-Des-17
18-Des-16
6-Nov-12
19-Jun-13
PROC
PROC
DED
Rev-DED RS
ICB
ICB
NCB
NCB
DED
PROC
CONSTRUCTION 720 days
ICB
ICB
NCB
NCB
NCB
Review DED & RS
PQ
RS
Proc
COW
SBD
DED
OE
BD
DED
NCB
NCB
Pack
#
PACKAGE NAME
2012
2013
2014
2015
2016
2017
2018
ICB
ICB
ICB
ICB
ICB
#########
CONSTRUCTION 640 + 93 days
19-Apr-16
PROC
20-Mar-16
08-Apr-16
CONSTRUCTION 540 days
CONSTRUCTION 730 + 105 days
CONSTRUCTION 730 + 75 days
CONSTRUCTION 730 + 90 days
Review DED & RS
PQ
ICB
ICB
Proc
Western I ndonesia National Roads I mprovement Project
4
1.1.2 Consultancy Services
TA Consultant
Mobilization
Planned
Contract
Signed
Mobilization
Actual
CTC
Jul 2012
5 Nov 2012
12 Nov 2012
DSC
Jul 2012
11 Jun 2013
19 Jun 2013
Capacity Building for Disaster
Risks Reduction
Cancelled
Development of Slope
Stabilization, Design and
Management
January 2017
Capacity Building for
Environmental Management
Cancelled
Capacity Building for
Road Safety
Cancelled
The technical assistance for consultancy of Capacity Building For Disaster Risk
Reduction has been deleted, but replaced by Technical Assistance for
Development of Slope Stabilization, Design and Management .
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
5
1.2
Current Status of Loan
At the end of this quarter on September 30, 2016 some 29.75% or USD 74.39 million of the
available loan had been disbursed, which is 7.85% over the revised forecasted expenditures
of 21.90% (USD 54.75 million) at the end of the quarter.
Total disbursements during this Quarter amounted to USD 9.38 million covering the
payments for "Statement of Work Accomplished' (MC) to civil works Contractors of the
on-going construction packages and advance payments to Contractors of newly started
contract packages. Details of the Disbursements and Expenditures Status are presented
in
Appendix 1
.
A more detailed and updated status of the loan are fully described and presented in the
Fiftenth (15
th
) Quarterly Financial Report covering the 3
rd
Quarter (July-August-September)
of the Year 2016 which is under preparation and will be submitted separately.
1.3 Current Problems and Action Required
Program
Activity
Responsibility
AWP-1
4 Nos. Completed and provisionally handed over. Under defects
liability period for two (2) years.
Contractor, PPK and
DSC
AWP-2 & AWP-3
12 Nos.Four (4) out of the twelve (12) packages under
construction are way behind schedule with huge
percentages of negative progress slippages. Contractors
of the problematic packages shall resolve immediately
the current problems. PPK and DSC shall closely
monitor the activities of the Contractor.
1 No. Completed .Handed over and awaiting issuance of TOC.
1 No. Ministry pose no objection to award the contract, Contract
Agreement still to be executed .
1 No. For confirmation by World Bank and Ministry to award the
contract . Some issues are still to be resolved.
2 Nos. Cancelled from the program.
Contractor and
PPK and DSC
POKJA
Civil work Project Manager,
DSC, POKJA and CTC
PMU and MPW
Capacity Building for
Disaster Risks Reduction
Under procurement proceedings.
Development of Slope
Stabilization, Design and
Management
Still to be procured
Sub-Directorate of
Geotechnical and Slope
Management, Directorate of
Road Construction, DGH,
MPWH
Capacity Building for
Environmental
Management
Cancelled
Capacity Building for
-Western I ndonesia National Roads I mprovement Project
6
2
General
2.1 Reporting Requirements
Quarterly Progress Reports
:
This is the eleventh (11
th
) Quarterly Progress Report as
required and stipulated in CTC's consultancy contract and the Loan Agreement. Prior
to the production of this report, Monthly Progress Reports have been prepared and
have dealt with all aspects of the works. This report attempts to bring the situation up
to date by covering overall progress up to the end of third (3
rd
) Quarter of the Year
2016.
Financial Monitoring Reports
:
These have been prepared for each quarter since the
beginning of 2013 with the first Report, issued in May 2013, covering the period
January
March 2013. Since that date quarterly reports have been prepared and
submitted regularly.
Report
Period Covered
Date Issued
Financial Monitoring Report No. 1
January 2013 March 2013
May 15, 2013
Financial Monitoring Report No. 2
April 2013 June 2013
August 15, 2013
Financial Monitoring Report No. 3
July 2013 September 2013
November 15, 2013
Financial Monitoring Report No. 4
October 2013 December 2013
February 15, 2014
Financial Monitoring Report No. 5
January 2014 March 2014
May 15, 2014
Financial Monitoring Report No. 6
April 2014 June 2014
August 15, 2014
Financial Monitoring Report No. 7
July 2014 September 2014
November 15, 2014
Financial Monitoring Report No. 8
October 2014 December 2014
April 7, 2015
Financial Monitoring Report No. 9
January 2015 March 2015
August 31, 2015
Financial Monitoring Report No. 10
April 2015 June 2015
October 2, 2015
Financial Monitoring Report No. 11
July 2015 September 2015
December 16, 2015
Financial Monitoring Report No. 12
October 2015 December 2015
February 10, 2016
Financial Monitoring Report No. 13
January 2016 March 2016
June 8, 2016
Financial Monitoring Report No. 14
April 2016 June 2016
August 25, 2016
Financial Monitoring Report No. 15
July 2016 September 2016
Under Preparation
CTC Monthly Progress Reports
:
These report have been prepared covering each full
month since January 2013. Subsequent reports have been submitted on a regular
monthly basis.
Environmental Studies and Activity Reports
:
These report have been continuously
updated and submitted to PMU for submission to World Bank for Bank's issuance of No
Objection Letter (NOL).
Appendix S-1
shows the summary of submitted of Reports
covering each contract package since inception of the Project.
Social Impact Studies and Activity Reports
:
These report which mainly dealt with the
implementation of "Land Acquisition Resettlement Action Plan" (LARAP) have been
continuously submitted to PMU for submission to World Bank for Bank's issuance of
No Objection Letter (NOL).
Appendix S-2
indicates the updated summary of all
submitted Reports.
Anti-Corruption Action Plan (ACAP) : Community Development Activity Reports
:
These Reports have been prepared and continuously submitted to the Client.
Appendix S-3
shows the summary of submitted Reports from the very first (1
st
)
submittal up to latest report before the Quarter ended.
Community Representative Observers (CRO) and Third Party Monitoring (TPM)
Reports
:
These Reports were consolidated and reviewed by CTC as prepared and
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
7
Their reports were based on their actual observations and monitoring during
pre-bid meetings, site visit and pre-bid openings of every contract package under procurement.
Appendix S-4
shows the updated summary of all reports which were forwarded to PMU.
2.2 Loan Status
[image:10.595.76.526.499.718.2]The agreed allocation of loan funds from the original loan agreement together with the %
disbursed by the World Bank to the end of the quarter date (September 30, 2016) is
presented in
Table 2
Table 2
Category
Description
Loan Restructuring
Amount US$
for the 3
Total Disbursement
rd
Quarter of
2016
Previous
Disbursement
Total Disbursed by
WB to End
September 30, 2016
in US$
% Disbursed
1
Betterment and Capacity
Part 1
Expansion of National Roads.
220,400,000.00
9,.377,785.40
59,425,773.04
68,803,498.44
31.22
2
Part 2
Implementation Support
17,000,000.00
0,00
5,583,880.83
5,583,880.83
32.85
3
Part 3
Road Sector Institutional
Development
0
0,00
0
0
0
4
Contingency for Disaster Risk
Part 4
Response
0
0
0
0
Unallocated
12,600,000.00
0,00
0
0
0
Original Loan
Amount
250,000,000.00
9,.377,785.40
65,009,653.87
74,387,379.27
29.75
2.3 Financial Management
S-Curve for Financial Progress
#REF!
1.25
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Month
%
Co
mp
let
e
Actual Expenditure USD 74.39
mil (29.75 %)
WINRIP ACTUAL PROGRESS UP TO SEPTEMBER 2016 AND FORECAST UP TO JUNE 2018
ACTUAL Sept 2016
Original Forecast
Forecast Expenditure Rev
USD
54.75 mil
(21.90%)
Forecast Sept 2016
Deviation = + 7.85 %
Western I ndonesia National Roads I mprovement Project
8
2.4 Project Cost Monitoring
A detailed summary of the project cost monitoring in tabular format is presented as
Appendix 3
at the end of this report.
2.5 World Bank Implementation Review Mission and Site Visit
A World Bank supervision mission for implementation review took place on August 9, 2016
and August 11, 2016 with the kick off and wrap up meetings, respectively.
The Technical and Financial Audit Consultant mission also took place on August 22, 2016
until September 2, 2016 with site visit inspection on Packages 5, 6, 11, 13 and 15. The
mission concluded the inspection on September 2, 2016 with coordination meeting in
Ministry of Public Works.
An "Agreed Key Action Plans" for progress compliance monitoring of the status of the
works on monthly interval is shown in
Table 3
.
Table 3 Agreed Key Action and Plans
Status as of end of 3
rd
Quarter (September 2016)
No.
Action
By Whom
Target dates
1.
Send the BER of package 16
PMU and CTC
•
August 12, 2016
2.
Inform the Bank about the decision taken for Package 10
PMU and CTC
•
As soon as
possible
3.
Inform the Bank about the steps DGH has taken/will take in the case of
the misrepresentation of facts in the bidding of Package 8 in response to
the letter WINRIP/265 of December 9, 2015. If DGH is not taking any
steps, this needs to be reported too.
PMU/CTC
•
As soon as
possible
4.
Send to the Bank the draft RfP and the budget for the slope stabilization,
design, and management
PMU and CTC
•
August 12, 2016
5.
Send to the Bank the shortlist for the slope stabilization, design, and
management
PMU and CTC
•
August 19, 2016
6.
Send the NOL to the contract modification #1 of the DSC contract
Bank
•
August 12, 2016
7.
Send the NOL for the replacement of the DSC team leader
Bank
•
August 10, 2016
8.
Send request to the Bank for the replacement of DSC staff for packages
14, 20 and 21
PMU and CTC
•
August 12, 2016
9.
Send to the Bank the #2 DSC contract modification for price escalation
and other changes (staff) under the DSC contract
PMU and CTC
•
September 2016
10.
Send to the Bank the revised version of the procurement plan
PMU
•
August 12, 2016
[image:11.595.77.579.339.770.2]2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
9
12.
Send the environmental management and monitoring plans (RKPPL) for
packages 14, 20 and 21 to the Bank
•
October 5, 2016
13.
Cary out HIV/AIDS workshops
PMU/CTC/ DSC
•
Package 7 Sept.
22, 2016
•
Package 8 on
Sept. 20, 2016
•
Package 12 on
Sept. 23, 2016
14.
Send a letter to the local Environmental Agencies, with copy to the
Bank, to urge them to follow-up on inadequate quarry management and
reporting by third party quarry owners
PMU and CTC
•
August 31, 2016
15.
Collect the environmental permits for all quarries both owned by third
parties and contractors, including evidence of compliance of the owner
with the environmental license
PMU and CTC
•
September 5,
2016
16.
Send to the Bank an update of the environmental monitoring table in
annex 4, including an update for the information on the quarries
PMU and CTC
•
October 5, 2016
17.
Update the project website with the implementation reports of RKPPL
and RKL/RPL, UKL/UPL or SPPLH for all packages
PMU and CTC
•
September 5,
2016
18.
Send to the Bank confirmation letter on status of the affected person (1)
due to the bridge development and status of additional LARAP for
package 2
PMU and CTC
•
August 16, 2016
19.
Send to the Bank final LARAP document of package 5 signed by the
relevant Government authority
PMU and CTC
•
August 16, 2016
20.
Send to the Bank the right of use permission letter for the Forestry
Department for the existing road of package 5
PMU and CTC
•
End of August
2016
21.
Carry out remedial actions for the LARAP implementation of package 5
PMU
•
As soon as the
DIPA revision is
done
22.
Send to the Bank the monitoring report of LARAP implementation of
package 5
PMU
•
After completion
of remedial
actions
23.
Submit LARAP monitoring reports for packages 11, 15, 16 and 19 to the
Bank
PMU
•
End of August
24.
Submit LARAP monitoring report for package 7
•
Beginning of
September 2016
25.
Submit LARAP monitoring reports for package 10, 12, and 14
•
Mid-September
2016
26.
Submit LARAP monitoring report for package 8
•
Mid-October
2016
27.
Submit LARAP monitoring report for package 13 for 590 APs
PMU
•
End of August
28.
Submit LARAP monitoring report for package 21 formally (515 APs)
PMU
•
August 16, 2016
29.
Submit LARAP monitoring report for package 20
•
PMU and CTC
•
End of August
2016
Western I ndonesia National Roads I mprovement Project
10
Bank
2016
31.
Submit the quarterly IFR for April to June 2016 to the Bank
•
PMU
•
August 15, 2016
32.
Provide additional follow-up response to the quality improvement
support inspection reports TFAC for packages 1, 6 and 19
•
PMU/DSC
•
August 12, 2016
33.
Send the revised TFAC response for package 3 informally to the Bank
•
PMU/DSC
•
August 11, 2016
34.
Send the TFAC response formally to the Bank for packages 1, 2, 3, 4, 6,
19 and 11
•
PMU/DSC
•
September 2,
2016
35.
Put the Mid-term review report on WINRIP website
•
PMU/CTC
•
August 20, 2016
36.
Submit to the Bank the 2015IRMS traffic data for the 19 road packages
•
PMU/CTC
•
September 15,
2016
37.
Regularly submit the quarterly progress reports to the Bank
•
PMU
•
Noted for each
calendar quarter
38.
Disclose updated procurement plan after Bank approval in the Winrip
website linked to MPW Website
•
PMU
•
After Bank
approval
39.
Update the newsletter quarterly, including the list of contracts,
implementation progress, project related workshops and number,
typology and status of complaints
•
PMU
•
Every quarter
40.
Send quarterly newsletter to the civil society forum in each project
province in hard copy or through an electronic mailing system
•
PMU
•
Every quarter
2.6 Project Steering Committee Meeting
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
11
3
Project Management and Implementation
3.1 Procurement Status
(A) Civil Works
Civil Works are now being implemented in Annual Work Programs (AWP) which have
been numbered AWP-1, AWP-2, and AWP-3.
All Contract Agreements for the four (4) AWP-1 contract packages were signed by the
end of 2013 with actual work commencement on January 2014.
[image:14.595.136.526.359.757.2]Under the other two (2) implementation programs, AWP-2 and AWP-3, thirteen (13)
packages were already procured, while and the other two (2) packages are under final
procurement stages.
Table 4
Shows the actual pre-construction and procurement status under the
implementation schedules AWP-2 and AWP-3
Table 4
Package
No.
Package Name
Status
AWP-2
5
Sp. Rampa - Poriaha
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on June 18, 2015
6
Ps. Pedati - Kerkap
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on March 11, 2015
7
Indrapura Tapan
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on
December 10, 2015
8
Bts. Pariaman Manggopoh
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on March
23, 2016
10
Sp. Empat Sp. Air Balam
Revised Bid Evaluation Report (BER) and award
of Contract has been issued No Objection Letter
(NOL) on February 22, 2016 by the World Bank.
Announcement and notification of award by the
Ministry is still pending due to some issues that
are still to be resolved.
11
Bantal - Mukomuko
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on February 23,
2015
12
Kambang Indrapura
Western I ndonesia National Roads I mprovement Project
12
Package
No.
Package Name
Status
13
Sp. Rukis Tj. Kemuning
Procured. Under construction since the
issuance of Notice To Proceed on July 22,
2015
AWP-3
14
Painan Kambang
Procured. Under construction since the issuance
of Notice To Proceed on August 3, 2016
15
Sibolga Bts. Tapsel
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on November 20,
2015
16
Seblat - Ipuh
Revised Bid Evaluation Report has been
resubmitted to World Bank on August 22, 2016
and by August 24, 2016 Bank Issued No
Objection Letter (NOL), while the Ministry
confirmed on Sept. 26, 2016 the results of the
BER and POKJA s recomendation to award the
contract..
17
Sp.Gn.Kemala Pg. Tampak
Procured. Under construction since the issuance
of Notice To Proceed (NTP)on September 4,
2015.
19
Lais Bintunan
Procured. Construction completed. Turn Over
Certificate still to be issued.
20
Lubuk Alung Sicincin
Procured. Under construction since the issuance
of Notice To Proceed on September 1, 2016.
21
Lubuk Alung - Kuraitaji
Procured. Under construction since the issuance
of Notice To Proceed on September 1, 2016.
Note : Packages No.9 and No.18 are cancelled from the program.
Presented in
Appendix 4
is the current status of procurement management.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the others Capacity
Building Consultancy status are discussed in Section 3.4.
3.2 Implementation Status Civil Works
As of end of this reporting quarter (September 2016), five (5) of contract packages were
already completed and currently under defects liability period for twenty four (24) months
effective on the day the TOCs were issued.
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
[image:16.842.55.811.106.500.2]Western I ndonesia National Roads I mprovement Project
13
Table 5
Program
Contract
Package
#
Contractor
Name of Road
Province
Contract
Signed
Commence
ment of
Work
Original
Time
Extension
Revised
Contract
Amount
Contract
Time
Completion
Date
Contract Amount
Contract
Time
Completion
Date
AWP-1
1
PT. Jaya Konstruksi
Manggala Pratama Tbk
Biha - Krui
Lampung
Nov 25,
2013
Jan 8, 2014
134,909,211,000
640 CD
Oct 9, 2015
93 CD
140,255,020,000
733 CD
Jan 10, 2016
2
PT.Jaya Konstruksi Manggala
Pratama Tbk
Padang Sawah
Sp. Empat including
Air Gadang
West
Sumatera
Dec 6, 2013
Jan 6, 2014
197,936,699,000
730 CD
Jan 5, 2016
105 CD
249,348,931,000
835 CD
Apr 19,
2016
3
PT. Jaya Konstruksi
Manggala Pratama Tbk
Manggopoh
Padang Sawah
Sumatera
West
Dec 6, 2013
Jan 6, 2014
143,688,963,000
730 CD
Jan 5, 2016
75 CD
183,940,872,000
805 CD
Mar 20,
2016
4
PT. Waskita Karya and PT.
Mulya Turangga (JO)
Ipuh - Bantal
Bengkulu
Nov 14,
2013
Jan 13, 2014
186,936,750,000
730 CD
Jan 12, 2016
90 CD
194,902,179,000
820 CD
Apr 11,
2015
AWP-2
5
PT. Nusa Konstruksi
Enjiniring Tbk.
Sp. Rampa -
Poriaha
Sumatera
North
March 17,
2015
June 18,
2015
107,321,260,310
540 CD
Dec 8, 2016
-
-
-6
PT. Waskita Karya (Persero)
Tbk.
Ps. Pedati - Kerkap
Bengkulu
Feb 27,
2015
Mar 11,
2015
86,517,470,000
450 CD
Jun 2, 2016
240 CD
118,444,156,000
690 CD
Jan 28, 2017
7
PT. Adhi Karya
Indrapura Tapan
Sumatera
West
Nov 26,
2015
Dec 10,
2015
129,699,900,000
630 CD
Aug 30,
2017
-
-
-8
PT. PP/PT. Statika Mitra
Sarana J.O
Bts. Kota Pariaman
- Manggopoh
Sumatera
West
Jan 28, 2016
Mar 23,
2016
355,500,000,000
720 CD
Mar 12,
2018
-71 CD
649 CD
Dec 31,
2017
11
PT. Hutama Karya/PT. Daya
Mulya J.O.
Bantal
Mukomuko
Bengkulu
Dec 18,
2014
Feb 23,
2015
228,899,717,000
720 CD
Feb 11,
2017
-
262,611,303,000
-
-12
PT. Lancar Jaya/PT. Cahaya
T.A. J.O
Kambang
Indrapura
Sumatera
West
Jan 28, 2016
May 23,
2016
358,650,400,000
720 CD
May 12,
2018
-116 CD
604 CD
Jan 16, 2018
13
PT. Waskita Karya (Persero)
Tbk.
Sp. Rukis TJ.
Kemuning
Bengkulu
Dec 18,
2014
July 22,
2015
292,700,000,000
720 CD
July 10,
2017
-
-
-AWP-3
14
PT. Yasa Patria
Perkasa/Conbloc, JO
Painan Kambang
Sumatera
West
Jun 1, 2016
Aug 3, 2016
214,327,429,680
630CD
Apr 12,
2018
-114 CD
-
516 CD
Dec 31,
2017
15
PT. Pembangunan
Perumahan (Persero)
Sibolga Bts.
Tapsel
Sumatera
North
July 13,
2015
Nov 20,
2015
260,100,000,000
810 CD
Feb 6, 2018
-
-
-17
PT. Jaya Konstruksi
Manggala Pratama Tbk
Sp. Gunung Kemala
Pugung Tampak
Lampung
Nov 17,
2014
Sept 4, 2015
199,551,000,000
720 CD
Aug 23,
2017
-
-
-19
PT. Roda Tekindo Purajaya
Bintunan - Lais
Bengkulu
Feb 27,
2015
Mar 11,
2015
33,689,452,000
300 CD
Jan 4, 2016
125CD
44,419,760.000
425CD
May 8, 2016
20
PT. Nindya Karya
Lubuk Alung
Sicincin
Sumatera
West
Jun 1, 2016
Sep 1, 2016
113,818,300,000
540CD
Feb 22,
2018
-54 CD
-
486 CD
Dec 31,
2017
Western I ndonesia National Roads I mprovement Project
14
Activities done during the 3
rd
Quarter of 2016 were repair and restoration of deteriorated
existing pavements, roadway excavation, embankment formation, spreading of granular
pavement for roadway widening, asphalt paving, structural works, construction of stone
masonry side ditches, stockpiling of raw material, production of crushed aggregates, other
minor works, bridge construction, finalization of Field Engineering surveys and
mobilization of resources of the newly started contract packages.
The four (4) contract packages under implementation program AWP-1 were already
completed and now under defects liability period for two (2) years since the issuance of
TOCs.
Under the implementation program AWP-2 and AWP-3, there are currently twelve (12)
contract packages that are on-going construction implementation and one (1) package on
AWP-3 is already completed. Physical progress of two (2) of the packages are lagging far
behind schedule with negative slippages of -57.51% and -44.31% respectively, while
progress for the other ten (10) packages are still slightly on or behind schedule.
Progress status of the on-going civil works contracts as of this reporting period are shown in
Table 6
.
Following are brief status of the on-going construction contract packages :
Package No. 1 : Biha Krui
The contract package is completed on January 20, 2016 and provisionally handed over to the
Employer and currently under Defects Notification Period for two (2) years reckoned from
the issuance of the TOC.
A more detailed previous status during the whole duration of the contract implementation
of this Package is presented in
ANNEX P-I Executive Summary Report.
Package No. 2 : Padang Sawah Sp. Empat (Including Air Gadang Bridge)
The contract package is completed on April 19, 2016 and provisionally handed over to the
Employer and currently under Defects Notification Period for two (2) years reckoned from
the issuance of the TOC.
ANNEX P-2 Executive Summary Report
present a more detailed status during the whole
duration of the contract implementation of the Contract Package.
Package No. 3 : Manggopoh Padang Sawah
The contract package is completed on March 20, 2016 and provisionally handed over to the
Employer on March 17, 2016 and currently under Defects Notification Period for two (2)
years reckoned from the issuance of the TOC.
A more detailed status of the project progress during the whole duration of the contract
implementation are shown in
ANNEX P-3 Executive Summary Report
.
Package No. 4 : Ipuh Bantal
The contract package is completed on May 29, 2016 and provisionally handed over to the
Employer on May 31, 2016 and currently under Defects Notification Period for two (2)
years reckoned from the issuance of the TOC.
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
[image:18.842.58.814.92.503.2]Western I ndonesia National Roads I mprovement Project
15
Table 6
Program
Contract
Package
#
Contractor
Name of Road
Target Progress
Schedule Ending
September 2016
Actual Progress
Accomplished
Slippage
Time Elapsed Remaining
Time
Remarks
AWP-1
1
PT. Jaya Konstruksi Manggala
Pratama Tbk
Biha - Krui
*
-
-
-
-
PHO : Jan 20, 2016
Completed
2
PT. Jaya Konstruksi Manggala
Pratama Tbk
Sp.Empat incl.Air Gadang
Padang Sawah
*
-
--
-
-
PHO : April 19, 2016
Completed
3
PT. Jaya Konstruksi Manggala
Pratama Tbk
Sawah
Manggopoh Padang
*
-
-
-
-
PHO : Mar 17, 2016
Completed
4
PT. Waskita Karya and PT.
Mulya Turangga (JO)
Ipuh - Bantal
*
*
-
-
-
PHO : May 31, 2016
Completed
AWP-2
5
PT. Nusa Konstruksi Enjiniring
Sp. Rampa - Poriaha
88.79%
31.28%
-57.51%
86.27%
74 CD
Based on original contract time
and schedule
6
PT. Waskita Karya Tbk
Ps. Pedati Kerkap
70.27%
64.44%
-5.83%
81.86%
125 CD
Based on 2nd revised contract
time and schedule
7
PT. Adhi Karya
Indrapura - Tapan
16.79%
16.70%
-0.09%
46.10%
339 CD
Based on original contract
time and schedule
8
PT. PP/PT. Statika Mitra J.O
Manggopoh
Bts. Kota Pariaman
7.58%
9.69%
+2.11%
28.70%
462 CD
Based on original contract
time and schedule
11
PT. Hutama Karya/ PT. DMT
Mukomuko - Bantal
84.00%
71.00%
-13.01%
80.67%
139 CD
Based on original contract
time and revised schedule
12
PT. Lancarjaya/PT. Cahaya
T.A. JO
Kambang Indrapura
1.61%
1.05%
-0.56%
21.26%
462 CD
Based on original contract
time and revised schedule
13
PT. Waskita Karya (Persero)
Tbk
Sp. Rukis Tj. Kemuning
63.60%
19.25%
-44.34%
59.94%
288 CD
Based on original contract
time and schedule
AWP-3
14
PT. Yasa PT. Conbloc (JO)
Painan Kambang
0.56%
0.47%
-0.09%
10.29%
462 CD
Based on revised contract
time and schedule
15
PT. Pembangunan
Perumahan (Persero)
Sibolga Bts. Tapsel
23.77%
8.99%
-14.78%
40.16%
462 CD
Based on revised contract
time and schedule
17
PT. Jaya Konstruksi Manggala
Pratama Tbk
Tampak
Sp. Gn Kemala Pg.
33.01%
28.34%
-4.68%
53.82%
332 CD
Based on original contract
time and schedule
19
PT. Rodatekindo Purajaya
Lais - Bintunan
100%
100%
-
-
-
Completed. TOC still to be
issued
20
PT. Nindya Karya
Lubuk Alung Sicincin
0.30%
0.39%
+0.09%
4.94%
462 CD
Based on revised contract time
21
PT. Multi Structure
Lubuk Alung Kuraitaji
0.56%
0.78%
+0.22%
4.94%
492 CD
Based on revised contract time
Western I ndonesia National Roads I mprovement Project
16
Package No. 5 : Sp. Rampa Poriaha
As of end of this period, the actual physical work progress is only 31.28% of the scheduled
work progress of 88.79%. The delayed works relative to the program schedule farther
dropped down to -57.71%.
Based on the original schedule, barely two (2) months of contract time are left and a huge
deficit of still unfinish work of almost 70% to be done which is impossible for the Contractor
to finish the remaining works in such short period of time.
However, it is anticipated, that the original contract time maybe extended due to pending
finalization of the field engineering results and technical justifications.
ANNEX P-5 Executive Summary Report
shows the Contractor s Progress Schedule.
Package No. 6 : Kerkap Ps. Pedati
Based on the 2
nd
revised progress schedule, the actual overall physical work accomplished is
64.44% which is still behind schedule by -5.83%.
Basically the only remaining major work item to be completed is the asphalt pavement
which is 70% component of the whole contract and the end of this period, 37% of the work
item is already completed with still 33% to be done.
For the Contractor to catch-up with the revised completion date on January 28, 2017, at
least a minimum of 9% progress must be attained per month during the remaining four (4)
months of the revised contract time.
ANNEX P-6 Executive Summary Report
shows the complete details of the contract
package.
Package No. 7: Indrapura Tapan
During the end of this quarter, the Contractor seemed to have slowed down as only 3.83%
progress had been achieved as compared with 7.24% progress in the preceeding month,
however the actual overall progress is still more or less on schedule by 4.15%.
Barring any unforeseen circumstances that will interupt or disrupt the execution of the
works, the target date of completion on August 30, 2017 can be easily achieved, provided
the Contractor shall produce at least minimum 7% progress every month during the
remaining contract time of eleven (11) months..
ANNEX P-7 Executive Summary Report
shows the complete details of the contract
package.
Package No. 8 : Bts. Kota Pariaman - Manggopoh
As the quarter ended, the overall actual physical/work progress achieved is 9.69% which is
ahead of schedule by +2.12% relative to the progress schedule of 7.58%.
At the rate the Contractor implement the works, there is no reason that the project cannot
be completed on time.
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
17
Contractor to meet the target date of completion on December 31, 2017.
ANNEX P-8 Executive Summary Report
shows the complete details of the contract
package.
Package No. 11 : Bantal - Mukomuko
Based on the revised schedule due to approval of the results of Field Engineering , the
actual overall progress attained by the Contractor up to end of this period is 71.00% against
84.00%.
At the end of the 19
th
month of the contract period, Contractor s performance with respect
to their work progress drastically slowed down as the negative slippage further dropped
down to -13.01% as compared with -12.15% the previous month. Based on the schedule,
there are only 4,5 months remaining contract time with 29% of the works still to be done.
Considering the Contractor s performance in the previous months, the target date of
completion is still attainable by achieving at least 6% per month progress.
For more details of the Contract Package, refer to
ANNEX P-11 Executive Summary
Report
.
Package No. 12 : Kambang - Indrapura
Work done during the quarter were mainly mobilization of equipment, manpower and
other necessary resources.
After four (4) months, since the Contractor commenced the Works, the overall total
progress as of end of this period is only 1.05% and still behind schedule by -0.50%
Considering the huge magnitude of the project and the upcoming target monthly progress
of 4% this coming October 2016 and gradually increases to as high as 15% in the month of
May 2017, the negative slippage will drastically farther drop down to an uncontrollable
situation if the Contractor will not improve the current situation.
Details of the Contract Package are shown in
ANNEX P-12 Executive Summary Report
.
Package No. 13 : Sp. Rukis Tj. Kemuning
During the period, it was still the same situation as in previous quarter as the Contractor
almost did nothing to improve the work progress with only 0.70% of progress to show for
the whole three (3) month period.
At the end of the quarter, the overall work accomplished is 19.25% and negative slippage
farther dropped from -39.26% in the preceeding month to -44.34% this month.
To date, there are still 81% remaining works which are to be done during the remaining
contract time of 10 months and at least a minimum of 8% progress per month have to be
attained in order to meet the target date of completion on July 10, 2017. However, at the
present rate the Contractor implement the Works, there is no way the Project can be
completed as scheduled.
Western I ndonesia National Roads I mprovement Project
18
Details of the work progress are shown in
ANNEX P-13 Executive Summary Reports.
Package No. 14: Painan - Kambang
Notice To Proceed (NTP) to commence the works has been issued on August 3, 2016 and
pre-construction conference was held on August 15, 2016 at BALAI III office in Padang City.
During the period, Contractor still concentrated on preparation to mobilize their resources,
such as preparation to construct base camp, man-power and equipment.
Based on the revised schedule, the overall actual progress of 0,47% has been achieved
during the period mainly on the General Work Item.
ANNEX P-14 Ëxecutive Summary Report
shows the complete details of the project.
Package No. 15: Sibolga Bts. Tapsel
At the end of this reporting quarter, actual overall progress achieved is 8.99% of the 23.80%
revised schedule for the end of the quarter.
Based on the Contractor s performance during the past II months ending this period, the
negative slippage kept on dropping down at an alarming rate. Taking into consideration
that the remaining works is still 91% and only 60% of the contract time remains, the target
date of completion on December 2017 may not be attained unless the contractor
implements a workable and realistic action plan.
To attain the target date of completion, the Contractor shall deliver at least a minimum
monthly progress of 6.00% during the remainder of the revised contract period.
Detailed and work progress of the contract package are shown in
ANNEX P-15 Executive
Summary Report
.
Package No. 17 : Sp. Gunung Kemal Pg. Tampak
The current status of the sub-project is fairly being implemented as evidenced by the single
digit and menageable negative slippage since the Contractor commenced works way back
in September 4, 2015.
Overall progress to date is 28.34% against 33.01% schedule, or the progress is slighty
behind schedule by -4.68%.
If Contractor can maintain the trend of their monthly progress, there is no reason that the
works could not be completed on or before the target date of completion on August 23,
2017.
ANNEX P-17 Executive Summary Report
shows the complete details and work progress
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
19
Package No. 19 : Lais Bintunan
At the end of the contract period last May 8, 2016, the total overall progress attained is
99.11%.
Basically the Project is fully completed, however, Taking Over Certificate is still to be issued
by DSC.
Complete details of the contract package are shown in
ANNEX P-19 Executive Summary
Report
Package No. 20 : Lubuk Alung - Sicincin
Contractor is currently on mobilization stage.
Notice To Proceed (NTP) to commence the Works has been issued on September 1, 2016
and pre-construction meeting was held on September 20, 2016 in Padang City.
ANNEX P-20 Executive Summary Report
shows the Contractor s schedule and work
progress.
Package No. 21 : Lubuk Alung - Kuraitaji
Contractor is currently on mobilization stage.
Notice To Proceed (NTP) to commence the Works has been issued on September 1, 2016
and pre-construction meeting was held on September 20, 2016 in Padang City.
ANNEX P-21 Executive Summary Report
shows the Contractor s schedule and work
Western I ndonesia National Roads I mprovement Project
20
3.3
Variation Order Details
To date, amendements and/or variation orders for six (6) construction contract packages
were already processed and approved by Pejabat Pembuat Komitmen (PPK), the
authorize Office to approve financial disbursement.
The approved variations orders were due to the following reasons :
a) Change of Engineer s Team Leader from V. Thiagarajah to Johnson Villar.
b) Change of PPK Sub Project Manager.
c) Contract amount revision due to Technical Justification of Field Engineering
results.
d) Revision of time for completion (time extension).
e) Contract amount revision due to contract price adjustment (escalation of unit
rates).
f) Change of Contractor s authorize representative.
g) Deletion of unspent provisional sum amounting to Rp. 7.1 Billion and balancing of
quantity overruns/underruns.
h) Final Quantity.
In regards with additive/deductive cost variations, original cost of the six (6) construction
contract packages increases by Rp. 149,417,273,000 while the variation orders for the
other contract packages are still under evaluation by DSC and PPK which is expected that
the results will increase the respective original contract amounts.
In anticipation of future claims for varied works by the Contractors, a revised costs of
additional 11% of the Original Cost for each contract package covered by AWP-1 has been
considered and 6% cost increases for packages under AWP-2 and AWP-3 to cover any
Variation Orders that may arise during the implementation of the Works.
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
21
Table 7 Details of Amendments (Variation Orders)
Reason For Change :
A Change of Engineer s Team Leader from V. Thiagarajah to Johnson Villar.
B Change of PPK Sub Project Manager.
C Contract amount revision due to Technical Justification of Field Engineering results.
D Revision of time for completion (time extension).
E Contract amount revision due to contract price adjustments (escalation).
F Change of Contractor s authorize representative.
G Deletion of unspent provisional sum amounting to Rp. 7.1 Billion and balancingof quantity overruns/underruns.
H Final quantity (overuns/underruns).
Package
No.
Original Contract
Amount
(Rp)
Amend
No.
Variation +/-
(Rp)
Revised Contract
Amount
(Rp)
Variance
%
Extension
Time
Reason For
Change
1
134,909,211,000
1
0
134,909,211,000
0
-
A
2
+19,163,804,000
154,073,015,000
+14.20
-
C
3
0
154,073,015,000
+14.20
-
B
4
0
154,073,015,000
+14.20
93
D
5
-13,817,995,000
140,255,020,000
+3,96
-
G
2
197,936,699,000
1
0
197,936,699,000
0
-
A
2
0
197,936,699,000
0
-
F
3
0
197,936,699,000
0
-
B
4
+28,776,518,000
226,713,217,000
+14.54
-
C
5
0
226,713,217,000
+14.54
105
D
6
+22,635,714,000
249,348,931,000
+25.97
-
E
3
143,688,963,000
1
0
143,688,963,000
0
-
A
2
0
143,688,963,000
0
-
F
3
0
143,688,963,000
0
-
B
4
+21,468,809,000
165,157,772,000
+14.94
-
C
5
0
165,157,772,000
+14.94
75
D
6
+18,783,100,000
183,940,872,000
+28.01
-
E
4
186,936,750,000
1
0
186,936,750,000
0
-
A
2
+9,501,334,000
196,438,084,000
+5.08
-
C
3
0
196,438,084,000
+5.08
-
B
4
0
196,438,084,000
+5.08
90
D
5
-1,535,905,000
194,902,179,000
+4.26
-
H
11
228,899,717,000
1
2
+33,711,586,000
0
228,899,717,000
262,611,303,000
+14.73
0
-
-
B
C
[image:24.595.47.578.106.517.2]Western I ndonesia National Roads I mprovement Project
22
3.4
Consultancy Services
Technical Assistance for Core Team Consultant (CTC) to Support the Project
Management Unit.
Lead Consultant: PT. Perentjana Djaja
CTC Contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 Nov 2012 between
the Ministry of Public Works , Directorate of Planning, DGH and PT. Perentjana Djaja,
Yongma Engineering Co. Ltd, PT. Epadascon Permata Engineering Consultant, JV and the
work commenced on 12 November 2012.
Amendment No.1 to original contract was signed on October 25, 2013.
Amendment No. 2 was officially approved, on September 3, 2014.
Amendment No. 3 has been approved on November 30, 2015.
Amendment No. 4 to the current CTC Contract was signed on March 4, 2016.
[image:25.595.136.557.418.733.2]Amendment No. 5 is under finalization. The amendment covers the adjustment of
inputs of staff , remunerations and cost estimates of foreign and local currencies.
Presented in
Table 8
is the current status of CTC contract.
Table 8
Description
USD
IDR
Original Contract including 10% VAT
1,404,370
23,556,940,000
Amendment No.1
including 10% VAT
1,447,517
24,668,792,500
Variance Against Original Contract
+3,07%
+4,72%
Combine Variance Against Original Contract
+4.12%
Amendment No. 2
including 10% VAT
1,509,117
24,704,544,150
Variance Against Original Contract
+7,46%
+4,87%
Combine Variance Against Original Contract
+5.81%
Amendment No.3
including 10% VAT
1,473,917
26,328,054,500
Variance Against Original Contract
+4.95%
+11.76%
Combine Variance Against Original Contract
+9.29%
Amendment No. 4
including 10% VAT
1,918,158
40,878,169,529
Variance Against Original Contract
+36.58%
+73.53%
Combine Variance Against Original Contract
+60.12%
Amendment No. 5
including 10% VAT
*1,914,495
*40,952,551,529
Variance Against Original Contract
*36,.32%
*73.84%
Combine Variance Against Original Contract
*60.22%
Note :
Combine variance (USD+IDR) is based on 1 USD = Rp. 9,558 exchange rate used during the
time of signing the original Contract Agreement.
2016 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
23
Technical Assistance for Design & Supervision Consultant (DSC)
Lead Consultant: Renardet S.A
[image:26.595.135.553.216.295.2]DSC Contract No. KU.03.01/PPK-PR/WINRIP/Bx/01/VI/2013 was signed on 11 Jun 2013
between the Ministry of Public Works, Head of Regional Office for National Roads
Implementation, DGH and Renardet S.A. PT Cipta Strada, PT. Daya Creasi Mitrayasa, PT.
Seecons and PT. Yodya Karya (Persero) Joint Venture and mobilized on 19 June 2013.
Table 9
shows the current status of DSC contract.
Table 9
Description
USD
IDR
Original Contract plus 10% VAT
902.660
57,000,575,500
Addendum No.1 plus 10% VAT
*1,147,190
*60,541,139,347
Variance Against Original Contract
*+27.09%
*+6.21%
Note :
1) Draft Addendum No.1 is still subject to approval by DGH with World Bank concurrence and
issuance of No Objection Letter (NOL).
2) Figures with asterisk (*) are tentative pending approval of Addendum No.1
Technical Assistance for Development of Slope Stabilization, Design and Management:
The Technical Assistance for Disaster Risk Reduction was canceled based on the results of
meeting between DGH and the WB on October 12, 2015. It was decided to cancel the
Technical Assistance and replaced by a Technical Assistance for Development of Slope
Stabilization, Design and Management (under Loan Category-2).
The revised shortlisting of interest consulting firms prepared by POKJA is under
finalization for submission to World Bank. While the revised Request For Proposal (RFP)
have already been submitted to World Bank for the request and issuance of No Objection
Letter (NOL).
Western I ndonesia National Roads I mprovement Project
24
3.5
Implementation of the Anti-Corruption Action Plan
Community Representative Officers (CRO)
To date, the selection of Community Representative Observers (CRO) has been 100%
completed for all the nineteen (19) contract packages with the last selection process was
conducted on November 17, 2015 in Padang for Contract Packages 14, 20 and 21. The
overall total numbers of appointed CRO s are thirty eight (38) individuals who were mostly
professional lecturers from different colleges or universities nearby to the projects.
All these thirty eight (38) CROs discharged their duties as independent observers for
nineteen (19) Contract Packages during the procurement activities.
A complete list of CROs appointed with their corresponding credentials can be found in
Appendix 6
.
Appendix 7
shows the activities of the CROs since the inception of the Project.
Third Party Monitors (TPM)
During this 3
rd
Quarter of 2016 (July-August-September) there were three (3)
appointments of Third Party Monitors for Package No.14. To date all the fifty seven (57)
appointments have been approved..
List of appointed TPM with their respective occupations and professional affiliations are
shown in
Appendix 8,
while
Appendix 9
shows the past to present activities/progress of
the TPM.
Complaint Handling System (CHS)
The WINRIP website has been online, and available for reporting all aspects of the
Anti-Corruption Action Plan including the registering of complaints by the general public. The
website can be accessed at the URL address
http://www.winripibrd.com
.
The CHS application has been completed. The application was put in sub-domain of
WINRIP website since February 2014. To access it, click on the sub-domain URL address
http://chs.winrip-ibrd.com
.
Appendix 10
and
Appendix 11
show the Work Plan on CHS
System and Work Activities on Publication/Disclosures.
The CHS team has been monitoring public complain via SiPP and WINRIP website.
2016 Quarterly Progress Report
3
rd