• Tidak ada hasil yang ditemukan

REFERENCES Analysing Cost Implications Of Building Design Variables As Areas Of Modelling To Achieve Value For Money A Study on Selected Buildings in Surakarta and Surrounding Areas.

N/A
N/A
Protected

Academic year: 2017

Membagikan "REFERENCES Analysing Cost Implications Of Building Design Variables As Areas Of Modelling To Achieve Value For Money A Study on Selected Buildings in Surakarta and Surrounding Areas."

Copied!
7
0
0

Teks penuh

(1)

133 REFERENCES

Aeroboe, M. B. (1995). Energy management strategies for facility managers, SA Refrigeration and Air-conditioning, 11(1), 43–53.

Al., Q. in I. et. (2015). Nigerian building and Road Research Institute (NABRRI) (1989).

Al-Asfoor, M. D. (1993). Computerized Conceptual Cost-Estimating System for Domestic Water Supply Projects, unpublished thesis. King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.

Allsopp, K. (1983)Journal Vol. 177(4), pp. 29. (n.d.). An Architects View, architects.

Al-Momani, A. H. (1996). Construction cost prediction for public school buildings in Jordan. Construction Management Economics, 14, 311–317.

Anastasia, M. Nancy, Y.N. Ricky, K. Beni, T. (2012). Korelasi bentuk, struktur dan konstruksi pada bangunan bentang besar dengan struktur membran (studi kasus: convention center yaya san pendidikan telkom, bandung).

Ashworth, A. & H. (2004). Willis’ Practice and Procedure Quantity Surveyors. Blackwell Science Ltd.

Ashworth, A. and Skitmore, R. M. (1983). Accuracy in Estimating. The Chartered Institute of Building.

Baxter, A. (1983). Buildability: A Structural Engineer’s View,. Architects’ Journal, 177(5), pp.30.

Beeston, D. T. (1987). A future for cost modelling. Building cost Modelling and Computers. P.S. Brandon, E & FN Spon, 15–24.

Bojic, M., Yik, F., Wan, K. and Burnett, J. (2002). Influence of envelope and partition.

Bozai, G. A. (1981). Regression Analysis Models for Preliminary Cost Estimating in Highway Construction, unpublished thesis presented in partial fulfillment for the degree of Master of Science. NED University of Engineering and Technology, Pakistan.

C. Gray, W. H. (2001). Building Design Management. Butterworth-Heinemann, Boston, MA,.

Carroll. (1982). Mechanical and Electrical Services Elements,.

Cartlidge, D. (2013). Quantity Surveyor‟s Pocketbook (2nd ed.). Oxford.: Elsevier.

Charleson, A. W. (2005). Structure as Architecture. . Oxford: Architectural Press.

Chasey, A. D. & Schexneyder, A. M. (2000). Constructability: The key to reducing investment risk. AACE International Transactions, RI3A.

(2)

134

Cheung, F. (2005). -Development and Testing of a Method for Forecasting Prices of Multi-Storey Buildings during the Early Desing Stage: the Storey

Enclosure Method Revisited. PhD Thesis. Queensland University of Technology (Australia).

CIRIA. (1983). Buildability: An Assessment.

CIRIA (1983). (1983). Buildability: An Assessment.

Clark, W. and Kingston, J. (1930). The Skyscraper: A Study in the Economic Height of Modern Office Buildings. American Institute of Steel Construction, New York.

Coombs, M. (1983). Buildability: A Delegate’s View. Architects Journal, 177(5 April), 47.

Cunningham, T. (2013). Factors Affecting The Cost of Building Work -. In An Overview. Dublin Institute of Technology.

Cyon Research. (2003). The building information model: A look at Graphisoft’s virtual building concept. Retrieved from

http://www.wbh.com/WhitePapers/Graphisoft_Virtual_Building_Model-a_Cyon_Research_White_Paper_030102.pdf#search=%22fragmented construction% 20%22BIM%22%22.

Department of the Environment (1971). (n.d.). Local Authority Offices: Areas and Costs. London.

Eastman, C. M. (1999). Building Product Models: Computer Environments Supporting Devopment Construction. CRC Press. New York: CRC Press.

Eldeen, T. A. M. S. (1996). Budget Estimating Models for the Construction Cost of Public School Buildings in Saudi Arabia, unpublished thesis. King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.

Ellen, L. and K. S. Y. (2007). A Study of the Economic Value of High-rise Office Buildings in China Strategic Integration of Surveying Services. In FIG Working Week 2007. Hong Kong SAR, China.

Ellis, M. W. (1996). Practical evaluation and integrated simulation of building HVAC system performance. University of Pretoria.

Establishment, B. R. (1970). Building Research Establishment Digest 64 soils and foundation 3HMSO.

Etuka. (1989). Engineering Practice in Nigeria, in the millennium, The Abuja Engineers. A Publication of Nigeria Association of Engineers., 2(3), 295– 302.

Ezetah. (1999). Developing local materials for building use. In A paper presented at Housing Corporation in Nigeria, workshop. Abuja.

Ferry, D. and Brandon, P. S. (1991). Cost Planning of Buildings. Oxford: Blackwell Scientific Publications.

(3)

135

Flanagan, R. and N. G. (1978). The relationship between construction price and height. Chartered Surveyor Building and Quantity Surveying Quarterly, 5(4), 68–71.

Fortune, C. and Hinks, J. (1998). Strategic building project price forecasting models in use – paradigm shift postponed. Journal of Financial Management of Property and Construction, 3(1), 3–26.

Fortune, C. and Lees, M. (1994). The relative performance of new and traditional cost models in strategic advice and clients,. The Royal Institution of

Chartered Surveyors.

Fortune, C., Lees, M. (1996). The relative performance of new and traditional cost models in strategic advice and clients. The Royal Institution of Chartered Surveyors.

Frampton, K. (1995). Studies in Tectonic Culture: The Poetics of Construction in Nineteenth and Twentieth Century Architecture. Massachusetts Institute of Technology.

Frick, H. (1998). Sistem Bentuk Struktur Bangunan: Dasar-dasar konstruksi dalam Arsitektur. Yogyakarta:Kanisius.

Horner, M. and Zakieh, R. (1996). Characteristic items – a new approach to pricing and controlling construction projects. Construction Management Economics, 14, 241–252.

Ibrahim, A. . (2004). Application of Regression Analysis for Assessing the Effect of Variation in Building Plan Shape on Unit Construction Cost. Samaru Journal of Information Studies, 4(2), 20 –26.

Ibrahim, A. D. (2007). Effect of changes in Building Layout on the unit

construction cost of Residential Building. Quantity Surveying Section, 7(1).

Ibrahim, S, Alumbugu, P. O, Abdul Azeez, A, Wasiu, A. (2015). Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in Nigeria,. International Refereed Journal of Engineering and Science (IRJES) ISSN, Volume 4(Issue 3 (March 2015)), 39–50.

Illingworth, J. R. (1984). (1984). Buildability, Concrete, August, pp. 10–11.

J., A. S. (1985). Long-Range Forecasting: From Crystal Ball to Computer (2 nd ed.). New York: John Wiley & Sons Inc.

J.F., M. (1988). Design productivity: A quality problem. Journal of Management Engineering ASCE, 4(4), 350–362.

Jagger, J. S. and D. (2007). Building cost planning for the design team (2nd ed.). Amsterdam : Elsevier Butterwworth-Heinemann.

Johan, Johny, dan L. D. (1998). Analisis Penerapan Value Engineering pada Proses Perencanaan/Desain Sub Struktur Bangunan Apartemen di Jakarta”. Jurnal Teknik Sipil Fakultas Teknik, No. 1 Tahu.

(4)

136

Kim, G. H. Yoon, J. E. An, s. H. Cho, H. H. and Kang, K. I. (2004). Neural network model incorpating a genetic algorithm in estimating construction costs. Building and Environment, 39(11), 1330–1340.

Kirkham, R. (2007). Ferry and Brandon’s Cost Planning of Buildings (8 th ed.). Oxford.: Blackwell Publishing.

Kosonen, R., and Shemeika, J. (1997). The use of a simple simulation tool for energy analysis. Proceedings of the Fifth International IBPSA Conference, Prague, Czech Republic, 2 ., 369–376.

Kouskoulas, V and Koehn, E. (1974). (1974). Predesign Cost-Estimation Function for Buildings. Journal of the Construction Division ASCE, 100(12), 589–604.

Kozy, B. and S, T. (2007). Stability Analysis and Bracing for System Buckling in Twin i-Girder B bridge Structures: Assessement,. Besign and Construction, Volume 3(No. 3-4 Routledge Journals), pp 149–163.

Landow, G. P. A. (2000). A Ruskin quotation? Retrieved from

http://www.victorianweb.org/ authors/ruskin/quotation.html (accessed 20 July 2015).

Langston, G. (2002). A New Era in Cost Planning. In Rick, B and Gerald, D (2002) (eds) Design and Construction: Building in Value. Oxford: Butterworth Heinemann.

Lawson, B. (2006). How designers think. (4th editio). Oxford: Elsevier.

Lee, Y. (2005). The relationship between height and cost of building. Retrieved August 1, 2015, from http://www.archren.com/archly

Lowe, D J, Emsley, M W and Harding, A. (2007). Relationships between total construction cost and design related variables. Journal of Financial Management of Property and Construction, 12(1), 11–23. Retrieved from https://www.escholar.manchester.ac.uk

MacDonald, A. J. (2001). Struktur & Arsitektur, terjemahan. Dr. Ir. Pariatmono dan Ir.

Mahendra, R. (2006). Studi Value Engineering dengan Metode Initial Cost dalam Rangka Usaha Penghematan Biaya Proyek Konstruksi. Universitas

Indonesia, Jakarta.

Mao, W., Zhu, Y. and Irtishad, A. (2007). Applying metadata models to unstructured content of construction documents: a view-based approach. Automation in Construction, 16, 242–52.

Mark and Halliburton. (1972). Soil Science. Journal of Soil Mechanic and Foundation (ASCE), 4(3), 327–339.

Maver, T. (1970). “A Theory of Architectural Design in which the Role of the Computer is Identified.” Building Science, 4, 199–207.

Maver, T. (1979). Cost Performance Modelling, . Chartered Quantity Surveyor, 2:, 11–15.

(5)

137 Moore, P. (1988). Working along the right lines,.

Morton, R. & Jagger, D. (1995). (1995). Design and the Economics of Building. Spon Press.

Newton, S. (. (1982). Cost modeling: a tentative specification, in Brandon, P. S. (eds) Building Cost Techniques: New Directions. London: E&FN Spon.

Palmer, A., Kelly, J., and Male, S. (1996). Holistic Appraisal of Value

Engineering in Construction in United States. Journal. Construction. Eng. Management., 10 ,(1061), 324–328.

Pena. W. and Parshell, S. A. (2001). Problem seeking: an architectural programming primer. (4th ed.). New York: Wiley.

Peter F, K. dan E. B. P. (2013). Penerapan Value Engineering (ve) oleh

Kontraktor dan Konsultan Indonesia. In Konferensi Nasional Teknik Sipil 7 (KoNTekS 7) Universitas Sebelas Maret (UNS), 24-26 Oktober. Surakarta.

Picken, D. H. and I. B. D. (2003). Height and construction costs of buildings in Hong Kong. Construction Management and Economics,21(2), pp.107–111.

Plebankiewicz, K. and Zima, E. (2012). Analysis of the building shape erected in Krakow and its impact on organization, technology and management in construction. An International Journal, 4(1).

Priyatno, H. (2010). Pengoptimalan Value Engineering pada Taha p Desain Bangunan Gedung di Indonesia. Universitas Indonesia Depok.

Ranasinghe, M. (1996). Total project cost: a simplified model for decision makers. Construction Management Economics, 14, 497–505.

Renata, S. H. (2014). ISO/DIS 15686-5 (2006), Life Cycle Cost optimization within decision making on alternative designs,. In Creative Construction Conference.

Renata Schneiderova Heralova. (2014). Life Cycle Cost optimization within decision making on alternative designs Czech Technical University in Prague. In Czech Republic. Creative Construction Conference. Faculty of Civil Engineering, Thakurova 7. 166 29 Prague 6.

RIBA. (2013). RIBA Plan of Work: Retrieved July 6, 2015, from www.a4a.sk/ RIBA-outline.htm

Rochmanhadi. (1992). Teknik Penilaian Disain (Value Engineering), Yayasan Gema Aproteknika, Semarang.

S, A. Z. A. (2005). Cost Implications of Architectural design Variables.

Saleem A., Andrzej M., Bartosz K., A. M. and P. N. (2011). Value Management (Online) The original manual was published in 2011. Retrieved August 24, 2015, from

(http://www.designingbuildings.co.uk/wiki/Value_management_in_building _design_and_construction

Schodek, D. L. (1999). Struktur, edisi kedua, terjemahan oleh. Ir. Bambang Suryoatmono, (edisi kedu).

(6)

138

Seeley, I. H. (1983). Building Economics: Appraisal and Control of Building Design Cost and Efficience (3rd ed.). Macmillan.

Seeley, I. H. (1996). Building Economics. London.: Macmillan.

Seeley, I. H. (1997). Building Economics. (Shittu A.A; A.D Adamu and M.A. Shehu(2013)., Ed.) (5th editio). The Macmillan press Ltd London.

Seeley, I. H. (1999). Building Economics,. London: Macmillan.

Shittu A.A, A. . A. and M. A. S. (2013). Cost Modelling of Mechanical and Electrical Services in Institutional Building Projects in Lagos State of Nigeria.

Sir Stuart Lipton, C. C. (2001). Improving Standards of Design in the Procurement of Public Buildings (CABE/OGC).

Skitmore, R.M. and Marston, V. K. (1999). Cost Modelling. London: E & FN Spon.

Skoyles, T. (1985). The Quantity Surveyor. (8 (3) ed.). London.

Staedman, P., Evans, S. and Batty, M. (2009). Wall area, volume and plan depth in the building stock. Building Research & Information, 37(5), 455 – 467.

Steyert, R. S. (1972). The economics of high rise apartment buildings of alternate design construction, U.S.A. American Society of Civil Engineers.

Swaffield, L.M. and Pasquire, C. L. (1996). A critique of mechanical and electrical services cost planning: existing methods and published information,. Journal of Financial Management of Property and Construction, 1(3), 23–41.

Tan, W. (1999). Construction cost and building height, Construction. Management Economics, 17, 129–132.

Thomsen, C. (1966). How high to rise. Appraisal Journal, 34(4), 585–91.

Tregenza, P. (1972). Association between building height and cost. Architects Journal, November, 1031–2.

Turner, G. R. (1986). Construction Economics and Building Design: A Historical Approach. Van Nostrand Reinhold Company, New York.

v. (2015). Retrieved July 8, 2015, from

www.designingbuildings.co.uk/wiki/Value_in_building design_and_construction

Warszawski, A. (2003). Analysis of Costs and Benefits of Tall Buildings,. Journal of Construction Engineering and Management, 129(4), 421–430.

Williams, T. P. (2002). Predicting completed cost using bidding data,. Construction Management Economics, 20, 225–235.

Wing, C. K. (1999). “On the issue of plan shape complexity: plan shape indices revisited.” Construction Management and Economic, 17, 473–482.

Zainuddin H. (1997.). CONPLAN: Construction planning and buildability

(7)

139

Research Institute Department of Surveying University of Salford, Salford, UK Submitted in Partial Fulfilment for the Degree of D.

Zima. (2008). “Influence of building shape on the construction cost”, Scientific Papers of the Institute of Building Engineering of the Wrocław University of Technology No. 91, series: Studies and Materials No. 20. Technology and

Referensi

Dokumen terkait

Pada Tabel 5.6 dapat diketahui dari 257 orang responden memilih kontrasepsi berdasarkan keyakinan religius diperoleh data mayoritas merasa malu dengan cara pemasangan AKDR

Dalam hal laporan tahunan telah tersedia bagi pemegang saham sebelum jangka waktu 4 (empat) bulan sejak tahun buku berakhir, maka laporan tahunan dimaksud wajib disampaikan

Berdasarkan penelitian yang telah dilakukan tentang Pertimbangan Hukum Oleh Hakim Dalam Menjatuhkan Putusan Terhadap Anak Yang Melakukan Penyalahgunaan Narkotika bahwa

Sebuah Tesis yang diajukan untuk memenuhi salah satu syarat memperoleh gelar Magister Pendidikan (M.Pd.) pada Sekolah Pascasarjana Universitas

Skripsi ini tidak boleh diperbanyak seluruhnya atau sebagian, dengan dicetak ulang, difoto kopi, atau cara lainnya tanpa izin dari penulis.. ADITYA MAULANA FAZRY

The wave is split at beam-splitter b1, where it travels either path b1-m1- b2(call it the green path) or the path b1-m2-b2 (call it the blue path). Mirrors are then used to

Bersamaan dengan ini Kami Menyampaikan Kepada Saudara untuk Membawa dan Memperlihatkan bukti- bukti Asli kualifikasi Perusahaan dan Menyertakan Bukti Penawaran

Berdasarkan hasil evaluasi dokumen penawaran sebagaimana yang tertuang dalam Berita Acara Nomor : 07/BAEP/POKJA-DISHUBKOMINFO-DGL/VII/2012 tanggal 02 Juli 2012 dan Berita Acara