FLOOD MANAGEMENT IN SELECTED RIVER BASIN
CS 11: CBFRM Support and
Facilitation 0.00 0.00 0.00 0.00 0.00 0.00
5 Consulting Services by BBWS 3 Cis CS 12: External
Environment
Safeguard Monitoring 0.00 0.00 0.00 0.00 0.00 0.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
117 6 Consulting Services by BWS Maluku
CS08-B: External Social Safeguard
Monitoring 0.00 0.00 0.00 0.00 0.00 0.00
CS 13: External Environment
Safeguard Monitoring 0.00 0.00 0.00 0.00 0.00 0.00
7 Consulting Services by Bappenas
CS 04: IME Consultant 0.00 0.00 0.00 0.00 0.00 0.00
8 Consulting Services by Kementerian Pertanian CS 05: Consulting
Services for Farmland Management and Sustainable Agriculture Practices
1.00 0.22 25.00 0.00 0.37 0.35 0.13
9 Consulting Services by Kementerian Dalam Negeri CS 06: Consulting
Services for Institutional Development for CBFRM
3.79 0.22 19.70 0.00 1.74 1.01 0.28
Kemajuan Pelaksanaan Kegiatan
No Paket Kontrak/
Komponen Status
1 Output 2: Civil Works by BBWS 3 Cis (Cidanau-Ciujung-Cidurian) CW 01: Construction of
Ciujung Flood Dike, Right Bank 11 km
- Konstruksi fisik sudah dimulai sejak April 2019.
- Penimbunan tanah sudah dilakukan di Desa Malabar (Zona 1), Desa Blokang (Zona 2), dan Desa Nagara. Clearing mencapai 8 km sampai Desa Kampung Baru.
CW 02: Construction of Ciujung Flood Dike, Left
Bank 11 km - Dalam tahap pembangunan tanggul.
CW 03: Dyke from up to toll and after the toll
- Desain CW 3 dalam proses finalisasi dan ada rencana penambahan panjang tanggul.
- Menimbang limpasan banjir dalam Flood Modeling berdasarkan data LIDAR maka akan menambah waktu untuk pembuatan desain, tambahan luas yang dibebaskan, dan AMDAL baru yang diperlukan.
- Penyusunan desain perlu menimbang Flood Modelling terbaru, dan menimbang aspek pembebasan lahan di CW 01 dan CW 02 yang diurus bersamaan dengan CW 03.
Pamayaran River Dredging and Dyke Upper Pamayaran River, Rangkas Bitung Upgrading D/Stream Ciujung and Cidurian Rivers
2 Output 2: Civil Works by BWS Maluku CW 04: Construction
Batu Merah Check Dam - Dukumen lelang sudah dikirimkan kepada ADB dan sedang menunggu NOL-1 dari ADB.
Batu Merah River Normalization
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
118
Way Ruhu River
Normalization
Way Ruhu Rivermouth Dredging
Normalization of other rivers
3 Output 2: Equipment Equipment by BBWS 3 Cis
Equipment by BBWS Maluku
Equipment by Dit River and Coastal (RC)
4 Output 1: Consulting Services by Dit RC
CS 01: Flood Risk Management and Engineering Services
- Pekerjaan yang dilakukan yakni terkait supervisi terhadap pekerjaan CW 01 dan CW 02 serta melakukan penyusunan DED untuk CW 03 dan CW 04.
- Dalam proses pembuatan Flood Prone Map berdasarkan hasil survei LIDAR.
- Melakukan supervisi terhadap pembangunan tanggul Sungai Ciujung CW-01 dan CW-02.
- Melakukan studi dan penyiapan dokumen lelang untuk paket Civil Work, termasuk peralatan Hidrologi dan Early Warning.
- Pengadaan dan supervisi beberapa pekerjaan survei: geoteknik, topografi, dan LIDAR.
CS 02: Project Implementation Management Services
- Fasilitasi penyusunan AWP dan Implementation Plan tahun 2020.
- Melakukan monitoring progress paket di Kementan dan Kemendagri.
- Mengembangkan website FMSRB dan PPMS dengan status 60%.
- Melakukan revisi PAM FMSRB.
- Menyusun laporan tematik terkait lingkungan dan social.
CS08-A1: External Social Safeguard Monitoring
for 3 Cis - Penyusunan laporan safeguard monitoring report.
CS 08-A2: External Social Safeguard Monitoring CS 09: Social surveys (IOL)
CS 10: AMDAL
CS 11: CBFRM support and facilitation
5 Consulting Services by BBWS 3 Cis CS 12: External
Environment Safeguard Monitoring
6 Consulting Services by BWS Maluku CS08-B: External Social
Safeguard Monitoring CS 13: External Environment Safeguard Monitoring
7 Consulting Services by Bappenas
CS 04: IME Consultant
- Hasil penilaian sudah disampaikan ke ADB pada Agustus 2019.
- ADB meminta panitia lelang melengkapi formulir dan sudah diserahkan ke ADB pada September 2019.
- Keputusan pemenang belum ditetapkan.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
119 8 Output 3: Consulting Services by Kementerian Pertanian
CS 05: Consulting Services for Farmland Management and Sustainable Agriculture Practices
- Verifikasi Kelompok Petani dan Lahan di Kabupaten Serang 42, Kabupaten Lebak 93, dan Kabupaten Pandeglang 72.
- Assessment dan pengukuran lokasi pembangunan embung.
- Rekrutmen Community Facilitator untuk pendampingan petani.
- Sudah ada 71 poktan tanda tangan MoU dengan Dinas Pertanian (29 di Lebak, 19 di Serang, dan 23 di Pandeglang).
9 Output 4: Consulting Services by Kementerian Dalam Negeri
CS 06: Consulting Services for Institutional Development for CBFRM
- Pembentukan 112 Kelompok Masyarakat Siaga Bencana (KMSB). Sejumlah 90 KMSB dilegalkan dengan SK Kades, 89 KMSB punya opsi program, dan 50 punya dokumen Participatory Rural Appraisal (PRA).
- Terdapat 4 KMSB terlibat dalam perbaikan drainase di Rangkasbitung Lebak.
- 10 KMSB tanda tangani MoU Design Partisipation di 20 desa Kabupaten Serang.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
120
Permasalahan/Kendala Yang Dihadapi Tindak Lanjut
Pembebasan lahan
- Pada CW 03 lahan yang masih belum dibebaskan tersebut berlokasi di dekat pabrik pengolahan pasir besi, pemasok Krakatau Steel. Pada CW 04 terdapat permasalahan pembebasan lahan sebesar 21 hektar tanah Negara dan 9 hektar tanah garapan yang dirumuskan proses pelepasan haknya.
Pengadaan Barang/Jasa
- Dikarenakan terlambatnya proses lelang maka terdapat kemungkinan adanya perpanjangan Loan Closing Date selama 12 bulan hingga 30 Juni 2021 untuk penyelesaian seluruh kegiatan.
Pembahasan ini perlu diberi target waktu untuk bisa menakar urgensi perpanjangan tersebut.
Manajemen Proyek
- Desain CW 3 dalam proses finalisasi dan ada rencana penambahan panjang tanggul, menimbang limpasan banjir dalam Flood Modeling berdasarkan data LIDAR. Hal ini sangat mungkin akan menambah waktu untuk pembuatan desain, tambahan luas yang dibebaskan, dan AMDAL baru yang diperlukan.
Pembebasan lahan
- Perlu dipastikan bahwa dalam penyerapan TA 2020 terdapat alokasi untuk pembebasan lahan sebagaimana dimaksud.
Pengadaan Barang/Jasa
- Untuk mengantisipasi adanya kemungkinan perpanjangan loan closing date dan perlunya percepatan penarikan maka disepakati untuk dapat menjadi on schedule pada Agustus 2021. Upaya percepatan dalam pencapaiannya perlu untuk disampaikan dalam bentuk timeline rencana kerja supaya dapat diawasi secara bersama-sama.
Manajemen Proyek
- Diperlukan adanya ketegasan kesepakatan dengan pihak konsultan
untuk dapat turut
mempertanggungjawabkan kualitas hasil desainnya. Desain di setiap wilayah konstruksi dianjurkan untuk dapat difiksasi terlebih dahulu dengan berbagai kemungkinan alternatifnya sehingga dapat meminimalisasi dampak-dampak yang akan menghambat pelaksanaan proyek seperti pengulangan pengurusan AMDAL, pembebasan lahan, dan lain sebagainya.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
121