1
LEMBAR PENGESAHAN
Disiapkan Oleh: Disetujui Oleh:
No Nama Paraf Tgl No Nama Paraf Tgl
1 2
Dudi Udayana Deny Hermawan
1 2 3
Andy Nugraha
Disahkan Oleh:
___________________ _____________________
Maman Sudarisman John Soedaryono
2 DOCUMENT HISTORY
Version Description Sign
3 TABLE OF CONTENT
TOPIC PAGE
I. OVERVIEW 4
I.01. PURPOSE 4
I.02. INTRODUCTION 4
I.03. IMPLEMENTATION 4
II. PROCEDURE 5
II.01. ROLE & RESPONSIBILITIES 5
II.02. CONTRACT MANAGEMENT 5
II.03. SELECTING PROVIDERS 6
II.04. ACCEPTANCE/ REJECTION CRITERIA 7
II.05. QUALITY CONTROL 8
II.06. CONFIDENTIALITY PROTECTION 9
II.07. TRAINING 9
II.08. AUDITS 9
II.09. MONITORING 10
II.10. RECORDS 10
4
I. OVERVIEW
I.01. PURPOSE
The purpose of this SOP is to define the process for selecting, approving, and monitoring subcontractors, vendors, and consultants.
I.02. INTRODUCTION
To ensure consistency and quality of services and products, the PT. POSITION requires that subcontractors, vendors, and consultants:
a. Be approved for use by the respective institution through which funding is managed b. Have written agreements as to the product or services that are to be provided; and, c. Have sufficient quality controls in place to mitigate any risks that a supplier might
introduce to a study or department.
I.03. IMPLEMENTATION
This SOP will be implemented prospectively. Supplies selected prior to implementation of this procedure may continue to be used unless they are determined to be unacceptable due to performance.
5
II. PROCEDURE
II.01. ROLE & RESPONSIBILITIES
Role Responsibilities
Hiring Manager
(Project Director, Head Dept, Project Manager)
Evaluate and select suppliers
Collaborates with F&A to develop contract documents
Monitor suppliers
Determine study-specific training requirements
Maintain study-specific training documentation
Review and update contracts in coordination with Administration & Finance & (A&F)
Provide performance feedback to A&F Administration & Finance
Manager and Analyst
Ensure compliance with applicable institution and grant agency requirements
Develop statements of work, budgets, justifications, etc., as needed to finalize contracts
Maintain contract documentation
Review and update contracts in coordination with hiring managers
Resolve performance issues Quality Assurance or
Designee
Conduct quality reviews and audits of suppliers, as appropriate
Determine PT.POSITION training requirements
II.02. CONTRACT MANAGEMENT
Administrative support is provided by both SC & PT.POSITION A&F departments. To ensure efficient and timely processing of requests, project directors, and department heads must work with their respective institution's A&F representative to obtain and manage funds and finalize contracts with providers. Specific contacts are listed on the Administration documents.
6 II.03. SELECTING PROVIDERS
STEP ACTION
1
Identify the specific needs for the product or services2
Identify which individual, institution, or business will most likely meet the operational need. Use the following types of sources to identify
prospective providers:
Previous experience with the provider
Pre-approved/ preferred lists (e.g., maintains a list of vendors that have standard agreements with the PT. POSITION)
Sales calls
Website searches
Recommendations from others
3
Evaluate prospective using any one or combination of the following methods as appropriate
Review of marketing materials and information from vendor websites
Review of CVs for key staff or consultants
Request the provider respond to a quality questionnaire
Review of provider policies, procedures, and other internal documentation
Conductin-g a site audit (see section entitled, Audits)
Note: For general evaluation criteria, see section entitled, Acceptance/
Rejection criteria
4
Coordinate with the appropriate Administration & Finance Analyst to complete all necessary paperwork to finalize the agreement with the provider7 II.04. ACCEPTANCE/ REJECTION CRITERIA
Providers are evaluated base on criteria such as the following:
a. Acceptance Criteria
Ability to meet the identified needs of the department/ company
Company history and business sustainability
Experiences and qualification of staff or consultant
Clientele profile and client feedback as indicators of quality and dependability
Quality system structure, definition and compliance level
Cost of products or services
Capability to deliver within specified timeframes
Compliance with applicable federal law
Has safety management program and structure b. Rejection Criteria
Poor or inconsistent quality
Non-compliance with policy and procedures
Non-compliance with applicable state federal law
Untimely delivery
Inability to meet the company specification
Incompatibility with the company or project owner
Company instability
Has no safety management program and structure (except the provider will follow the company safety program)
8 II.05. QUALITY CONTROL
The following controls mitigate financial, operational risk associated with the use of providers:
CONTRACT TYPE/ PRODUCT
OR SERVICES
QUALITY CONTROLS
Sub-Contractors Proof of insurance
Proof of qualification
Restriction on subcontracting to other individuals
Directors approval
Confidentiality agreement Vendors Proof of insurance
Sole-source justification
Proof of qualification
Company ownership rights specified
Confidentiality agreement
Use of approved supplier list (e.g., Company Material Management Vendor Agreement list, IT Network Standard for Hardware &
Software, etc)
Cost limits for department approval for expenditures
Incoming acceptance/ qualification/ validation of hardware and software
Vendors audit (see section entitled, Audits) Consultants Proof of insurance
Sole-source justification
Proof of qualification
Company ownership rights specified
Confidentiality agreement
Consultant restrictions on implementation of recommendation
Supervision of work by Company Hiring Manager
Used of approved/ preferred vendors (e.g., Company Material Management Vendor Agreement list)
Cost limits to department approval for expenditures
9 II.06. CONFIDENTIALITY PROTECTION
Many contract documents provided by PT. POSITION contain boilerplate language for Protection of intellectual property. There are instances, however, when separate confidentiality agreements or business associate agreements are needed. Hiring managers should consult with their A&F contact to determine whether separate documents are required. The hiring manager is responsible for carefully reviewing contract materials and ensuring that all appropriate details and documents are included as part of the contract, and that the documents are complete (e.g., signed and dated by the appropriate parties).
II.07. TRAINING
The following training requirements apply to providers:
Providers are required to have sufficient knowledge and experience to perfolm their contractual obligations.
The COMPANY will maintain, as part of the contract files, proof of qualifications (e.g., resume, CV, company brochure, or equivalent documentation).
As part of study-specific files, project directors will maintain current and archived copies of signed and dated qualifications. Qualifications should be updated
annually.
Providers who perform study-specific responsibilities may need to be trained on study documents and methods, computer systems, and PT. POSITION SOPS.
Training will be documented according to SOP Safety, Training Program for employee.
II.08. AUDITS
It may be necessary to conduct initial or periodic audits of a provider. Audits should be considered when there is a major risk to the PT. POSITION (e.g., for outsourcing of responsibilities that have been transferred to the PT. POSITION from a private industry sponsor, or outsourcing of major software development projects). Audits may be conducted by PT. POSITION Quality Assurance or by a vetted third party. Project Manager and Project Directors should coordinate with Quality Assurance to ensure that audits are incorporated into selection and monitoring activities, as appropriate.
10 II.09. MONITORING
Monitoring is generally accomplished through one of the following:
Day-to-day supervision by the COMPANY hiring manager
Review and acceptance of work products and services
Incoming inspection and acceptance of equipment
Routine review of contracts soon-to-expire
Individual problems or errors are corrected on a case-by-case basis and are the responsibility of hiring managers. However, if problems become frequent and impact the successful functioning of department, hiring managers must notify their A&F contact. A&F will work with the hiring manager and the vendor, sub-contractor, or consultant to ensure that recurrent or pressing problems are addressed satisfactorily. The provider's performance and their response to identified problems will be factored into contract renewal negotiations and may result in the provider being replaced.
II.10. RECORDS
The following records will be maintained:
RECORDS FORMAT LOCATION/ ACCESS
Contract files (e.g., statement of work, agreement, qualifications, performance feedback, etc.)
Hardcopy with signature
In Administration and finance (A&F) files
Specific training documentation Softcopy or Hardcopy with signature
In specific files maintained by the project manager or director Audit documentation Softcopy or Hardcopy
with signature
In audit files maintained by the project manager and/or project director
HES Questionnaires form and result
Softcopy or Hardcopy with signature
In Administration and finance (A&F) and HES Managers files maintained by HES Division