Some of our results are: (a) for a defendant clearly in the majority, awarding peremptory challenges is unlikely to be optimal because of increased wrongful acquittal costs; (b) for
In contrast, the same unit in period 2 ( B 2 ) is e $ cient since it produces the maximum output attainable, given the existing technology. labour) and one output (i.e. GDP)
Buchanan, Estimating the cost for doing a cost estimate, The Telecommunications and Data Ac- quisition Progress Report 42125, Long-Range Planning Program, January } March,
For that purpose, we can follow the lead of the previously mentioned authors and consider a criterion suggested by Barber and Lyon [7], namely by constructing a control group with
The production planning problem for the milling machine indeed is a lot-sizing and scheduling prob- lem with sequence-dependent setups.. Setting the milling machine up actually means
The IDEF0 model for the technology selection process involves several activities such as identify feasible systems, select performance variables, identify competitive
By carrying out a parametric analysis of the setup costs in the economic lot-sizing problem, we have obtained new results about the structure of optimal solution for given number
Second, by using nonparametric Kernel regression techniques which do not require the pre-specification of functional forms prior to estimation, we estimate and examine an