ANALISIS BIAYA DAN WAKTU

MENGGUNAKAN METODE REGRESI LINIER

Analysis Of Cost and Time Using Linear Regression Method

Skripsi

Disusun sebagai salah satu syarat memperoleh gelar sarjana pada Jurusan Teknik Sipil fakultas Teknik Universitas

Sebelas Maret Surakarta

Disusun Oleh :

HANDRY ANOM ERVIANTO I1113041

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARET SURAKARTA

(2)

ii

ABSTRAK

Handry Anom Ervianto.2016. Analisis Biaya Dan Waktu Menggunakan Metode Regresi Linier.Skripsi, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Sebelas Maret, Surakarta.

Perkembangan laju industri konstruksi di Indonesia berkembang pesat dengan masuknya berbagai teknologi pelaksanaan proyek, untuk mengimbanginya diperlukan penelitian-penelitian yang meneliti perihal manajemen biaya, mutu dan waktu agar diperoleh hal yang paling efisien. Untuk meningkatkan efektifitas dalam pengawasan dan pengendalian proyek maka dilakukan pengendalian biaya dan waktu. Pengendalian adalah aktivitas yang mengikat keseluruhan aktivitas yang terdapat pada manajemen proyek. Perencanaan dan pengorganisasian memang merupakan aktivitas yang berpengaruh terhadap proyek, tetapi pengendalian proyek yang efektif merupakan hal terpenting.

Dalam penelitian ini menggunakan kuesioner yang pertanyaanya berdasarkan perbandingan dokumen pelaksanaan dan monitoring selama proyek berjalan. Dokumen Pelaksanaan sebagai alat pengedalian proyek diperlukan untuk mengantisipasi penyimpangan-penyimpangan yang dapat terjadi dengan memberikan suatu peringatan dini (early warning), bahwa seberapa prestasi pekerjaan yang harus dicapai pada suatu waktu tertentu melalui standar acuan yang dipakai sebagai dasar pengukuran, sehingga apabila terjadi penyimpangan, tindakan perbaikan ( corrective action ) dapat dilakukan sebelum terjadi masalah yang lebih serius. Sedangkan Monitoring dan pelaporan adalah alat-alat yang diperlukan untuk pengendalian dan pengawasan proyek. Monitoring dapat diartikan sebagai mengamat-amati dan mempengaruhi kegiatan-kegiatan pokok dan hasil pekerjaan. Pelaporan berarti memberikan informasi kepada seseorang tentang kemajuan, masalah-masalah dan kemungkinan-kemungkinan di kemudian hari.

Dari penelitian ini didapatkan peningkatan kinerja biaya proyek dipengaruhi oleh kesesuaian kualitas pelaksanaan dilapangan yaitu tentang analisa harga satuan pekerjaan utama, kesesuaian penawaran harga kontraktor, kinerja pelaksanaan prakualifikasi, kenaikan upah dan harga. Peningkatan kinerja waktu proyek konstruksi dipengaruhi oleh kesesuaian kualitas pelaksanaan dilapangan yaitu tentang jumlah dan kondisi alat yang digunakan untuk pekerjaan utama, kesesuaian waktu penyelesaian, metode pelaksanaan kerja dan penangguhan pekerjaan. Diperoleh rumus regresi linier untuk kinerja biaya Y1 = 0,271 + 0,128X1

+ 0,177X2 + 0,234X11 + 0,128X16, dan untuk kinerja waktu Y2 = 0,052 + 0,156 X3

+ 0,006 X7 + 0,301 X8 +0,272X15.

(3)

iii

ABSTRACT

Handry Anom Ervianto.2016. Cost And Time Analysis Method Using Regression Linier. Skripsi, Department of Civil Engineering, Faculty of Engineering, Universitas Sebelas Maret, Surakarta.

The development pace of the construction industry in Indonesia is growing rapidly with the introduction of technology implementation of the project, to compensate the necessary studies that examined the management regarding the cost, quality and time in order to obtain the most efficient. To improve the effectiveness of the supervision and control of the project to control the cost and time. Control is an activity that binds all activities contained in the project management. Planning and organizing is an activity that affect the project, but effective project control is paramount.

In this study used a questionnaire which the question is based on the comparison document the implementation and monitoring during the project. Implementation Document as a tool pengedalian project is necessary to anticipate deviations that may occur by providing an early warning (early warning), that how achievements work to be accomplished at a particular time via a standard benchmark used as the basis of measurement, so that in case of irregularities, corrective action (corrective action) to do before going on to more serious problems. While Monitoring and reporting are the tools necessary for the control and supervision of the project. Monitoring can be defined as observing and influencing key activities and results of the work. Reporting means providing information to someone on the progress, problems and possibilities in the future.

From this study, the performance improvement project cost is influenced by the quality of the field that the suitability of the analysis of the main unit price, suitability Bid contractors, the performance of the implementation of prequalification, wage and price increases. Improved performance when the construction project of the fit quality of implementation in the field which is about the number and condition of the tools used for the main job, timeliness of completion, implementation methods of work and work suspension. Obtained by linear regression formula for performance fees Y1 = 0,271 + 0,128X1 + 0,177X2 +

0,234X11 + 0,128X16, and on-time performance Y2 = 0,052 + 0,156 X3 + 0,006 X7 +

0,301 X8 +0,272X15.

Referensi

Dokumen terkait

Berdasarkan hasil penelitiandapat diketahui bahwa penggunaan energi listrik pada panel Mill A banyak yang tidak sesuai dengan karakteristik alat yang digunakan yaitu

Berbagai alternatif pendapatan yang dilakukan petani sawah di Desa Kolomayan dalam upaya pemenuhan nafkah rumah tangga dengan memanfaatkan modal sosial yang

Franciskus Manalu : Analisa prosedur penyusunan anggaran laba rugi, 2004 USU e-Repository © 2008... Franciskus Manalu : Analisa prosedur penyusunan anggaran laba rugi, 2004

Metode yang digunakan dalam penelitian ini adalah eksperimental dengan pendekatan kuantitatif dengan tolak ukur data dan informasi yang digunakan adalah data keadaan sebelum

Yang disusun untuk melengkapi sebagian persyaratan untuk menjadi Sarjana Teknik pada Departemen Sipil Fakultas Teknik Universitas Indonesia, sejauh yang saya ketahui bukan

seksama, apakah pencilan itu merupakan kesalahan dalam pencatatan amatan atau pencilan tersebut muncul dari kombinasi keadaan yang tidak biasa. yang mungkin saja sangat penting

pada hasil jadi produk sus kering terbaik, maka dalam penelitian ini dilakukan manipulasi pencampuran dua jenis lemak yaitu mentega (butter) dan margarin dengan jumlah

Antusias para pencari kerja / job seeker pada Job Fair 14 UDINUS terhitung sangat tinggi berdasarkan data yang diperoleh yaitu sejumlah 6268 orang yang terdiri

Penelitian ini bertujuan untuk mengetahui bagaimana pelaksanaan Peraturan Daerah Kabupaten Klaten nomor 13 Tahun 2011 tentang Penataan dan Pengendalian Pembangunan Menara

5 Asisten Apotiker KECAMATAN MEKARSARI TAHUN 2014 JENIS IZIN AMIR MAHMUD NIP.. 1 2

Dari Gambar 8.5 grafik analisis sensitivitas terhadap perubahan harga jual di atas, dapat dilihat bahwa nilai NPV, IRR, dan ROI cenderung meningkat di setiap meningkatnya harga

Demikian Pengumuman Perusahaan Pemenang Pelelangan Umum ini dibuat, untuk dapat dipergunakan sebagaimana mestinya. Jambi, 05

Kerangka penelitian ini meliputi pembuatan gen penyandi pMMO domain cupredoxin ( spmoB ), subklon gen spmoB pada vektor pGEM-T Easy, konstruksi vektor ekspresi,

Penelitian ini bertujuan untuk meningkatkan kemampuan berpikir kritis dan prestasi belajar siswa kelas XI MIA 1 dengan penerapan model pembelajaran Learning Cycle 5E pada

dengan teknik Think Pair Share dapat meningkatkan hasil belajar. siswa terhadap mata pelajaran bahasa Indonesia khususnya

Tapi jika firman Tuhan bertahan selama-lamanya, apa yang harus kita lakukan pada ayat-ayat yang bertentangan, karena tidak mungkin bagi manusia berumur 40 tahun yang mempunyai anak

Berbagai macam penyimpangan dalam biaya produksi dapat menimbulkan selisih biaya, maka perusahaan perlu melakukan analisis terhadap selisih biaya yang terjadi untuk

Hasil dari penelitian ini dianalisa terhadap daya dukung model pondasi tiang dan kuat geser undrained dari tanah sebelum dan sesudah proses elektrokinetik untuk mengetahui

Efektifitas Dance Movement Therapy terhadap penurunan tingkat stres pada mahasiswa matrikulasi PMB FK USU 2012 yang dianalisis menggunakan paired T-test (uji dua

Observasi ini dilakukan untuk melihat pelaksanaan semua rencana yang telah dibuat dengan baik, tidak ada penyimpangan-penyimpangan yang dapat memberikan hasil

(4) Disiplin anggaran sebagaimana dimaksud pada ayat (1) bahwa dalam pengelolaan keuangan Desa yang direncanakan merupakan perkiraan yang terukur secara rasional

Berdasarkan hasil penelitian di atas dapat disimpulkan bahwa penggemukan Sapi Bali jantan fase finishing dengan hijauan menghasilkan rata-rata kadar glukosa darah