• Tidak ada hasil yang ditemukan

FAKULTAS TEKNIK LABOLATORIUM TEKNIK SIPIL TINJAUAN KUAT DUKUNG, POTENSI KEMBANG SUSUT, DAN PENURUNAN KONSOLIDASI TANAH LEMPUNG KALIOSO KARANGANYAR.

N/A
N/A
Protected

Academic year: 2017

Membagikan "FAKULTAS TEKNIK LABOLATORIUM TEKNIK SIPIL TINJAUAN KUAT DUKUNG, POTENSI KEMBANG SUSUT, DAN PENURUNAN KONSOLIDASI TANAH LEMPUNG KALIOSO KARANGANYAR."

Copied!
109
0
0

Teks penuh

(1)

Tabel 1.1 Pemeriksaan Berat Jenis

(A) Nomor Piknometer 1 2

(B) Berat Piknometer + Tanah (gr) 80 74

(C) Berat Piknometer (gr) 55 53

(D) Berat tanah (B-C) 25 21

(E) Suhu (0C) 28 28

(F) Piknometer + Air + Tanah (gr) 176 170 (G) Piknometer + Air pada 0C (gr) 157 156

(H) (D+G) 182 177

(I) Isi tanah (H-F) 6 7

(J) Berat Jenis (D/I) ( (gr/cm3) 4.167 3

(K) Faktor Koreksi (K) 0.998 0.998

(L) Berat Jenis Tanah, 20 c (KxJ) 4.158 2.994

Rata-rata 3.576

Tabel 1.2 Pemeriksaan Kadar Air

Nomor tin box 2 3

Berat tin box (gr) 7 7

Berat tin box + tanah basah (gr) 37 30 Berat tin box + tanah kering (gr) 36 29

Berat air (C-D) (gr) 1 1

Berat contoh kering (D-B) (gr) 29 22 Kadar air (E\F)X 100% (%) 3.448 4.545

rata rata (%) 3.996

Tabel 1.3 Pemeriksaan Batas Plastis

A No cawan 1 2 3

B Berat cawan 7 7 7.4

C B cawan + tnh basah (gr) 11 10.4 11.1 D B cawan + tnh kering (gr) 10.2 9.8 10.2

E B air (c-d) 0.8 0.6 0.9

F Berat contoh kering (d-b) (gr) 3.2 2.8 2.8 G Kadar air (e\f)x100% (%) 25 21.429 32.143

(2)

Tabel 1.4 Pemeriksaan Batas Susut

No cawan 1 2

Berat cawan 44.5 43.7 B cawan + tnh Basah 59.4 59.1 B cawan + tnh kering 52.8 52.8

Berat air 6.6 6.3

Berat contoh kering 8.3 9.1 Kadar air 79.518 69.231 Isi contoh basah 11 11 Isi contoh kering 8 8 Rata rata 43.373 36.264

39.818

Sampel I

Tabel 1.5 Pemeriksaan Batas Cair

Banyaknya pukulan 6 12 22 37 39

A No cawan 1 2 3 4 5

B Berat cawan 7.5 7.5 7.4 7.2 7.5

C B cawan + tnh basah (gr) 10.7 13 13.4 12.5 12 D B cawan + tnh kering (gr) 9.3 10.9 9.5 11.4 11.2

E B air (c-d) 1.4 2.1 0.6 1.1 0.8

F Berat contoh kering (d-b) (gr) 1.8 3.4 2.1 4.2 3.7 G Kadar air (e\f)x100% (%) 77.778 61.765 28.571 26.190 21.622

Rata-rata 43.185

0 20 40 60 80 100

1 10 100

Jumlah Pukulan

Kadar air (

%

)

(3)

Sampel II

Tabel 1.6 Pemeriksaan Batas Cair

Banyaknya pukulan 11 12 23 28 40

A No cawan 1 2 3 4 5

B Berat cawan 7.4 7.5 7.1 7.3 7.3

C B cawan + tnh basah (gr) 14 12 15.8 15 14.1 D B cawan + tnh kering (gr) 8.6 10.3 12.4 11.9 11.3

E B air (c-d) 5.4 1.7 3.4 3.1 2.8

F Berat contoh kering (d-b) (gr) 1.2 2.8 5.3 4.6 4 G Kadar air (e\f)x100% (%) 450 60.714 64.151 67.391 70

Rata-rata 54.744

0 10 20 30 40 50 60 70

1 10 100

Jumlah Pukulan

Kadar air (

%

)

Gambar 1.2 Grafik hubungan kadar air dengan jumlah pukulan

Sampel III

Tabel 1.7 Pemeriksaan Batas Cair

Banyaknya pukulan 8 22 25 33 38

A No cawan 1 2 3 4 5

B Berat cawan 5.4 20.8 5.3 4.9 7.5

C B cawan + tnh basah (gr) 12.7 29.6 11.6 11.5 14.2 D B cawan + tnh kering (gr) 9.5 26.1 9.9 9.6 11.5

E B air (c-d) 3.2 3.5 1.7 1.9 2.7

F Berat contoh kering (d-b) (gr) 4.1 5.3 4.6 4.7 4 G Kadar air (e\f)x100% (%) 78.049 66.038 36.957 40.426 67.500

(4)

0 20 40 60 80 100

1 10 100

Jumlah Pukulan

Kadar air (

%

)

Gambar 1.3 Grafik hubungan kadar air dengan jumlah pukulan

Rata-rata Batas Cair (Liquid Limit) :

(

)

51.908

3

57.794

54.744

43.185

=

+

(5)

Analisa saringan

Tabel A.8 Percobaan I analisa saringan

Berat tertahan (gram)

% komulatif

UKURAN

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 3 3 6.818 37.182 62.818

NO 50 0 3 0.000 37.182 62.818

NO 60 0 3 0.000 37.182 62.818

NO 100 1 4 2.273 34.909 65.091

NO 200 2 6 4.545 30.364 69.636

PAN 1 7 2.273 28.091 71.909

Tabel A.9 Percobaan II analisa saringan

Berat tertahan (gram)

% komulatif

UKURAN

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 2 2 4.545 39.455 60.545

NO 50 0 2 0.000 39.455 60.545

NO 60 0 2 0.000 39.455 60.545

NO 100 1 3 2.273 37.182 62.818

NO 200 3 6 6.818 30.364 69.636

PAN 0 6 0.000 30.364 69.636

Tabel A.13 Percobaan III analisa saringan

Berat tertahan (gram)

% komulatif

UKURAN

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 4 4 9.091 34.909 65.091

NO 50 0 4 0.000 34.909 65.091

NO 60 0 4 0.000 34.909 65.091

NO 100 1 5 2.273 32.636 67.364

NO 200 2 7 4.545 28.091 71.909

(6)

(D) Berat tanah (B-C) 25 21

(E) Suhu (0C) 28 28

(F) Piknometer + Air + Tanah (gr) 176 170 (G) Piknometer + Air pada 0C (gr) 157 156

(H) (D+G) 182 177

(I) Isi tanah (H-F) 6 7

(J) Berat Jenis (D/I) ( (gr/cm3) 4.167 3

(K) Faktor Koreksi (K) 0.998 0.998

(L) Berat Jenis Tanah, 20 c (KxJ) 4.158 2.994

Rata-rata 3.576

Tabel 1.2 Pemeriksaan Kadar Air

Nomor tin box 2 3

Berat tin box (gr) 7 7

Berat tin box + tanah basah (gr) 37 30 Berat tin box + tanah kering (gr) 36 29

Berat air (C-D) (gr) 1 1

Berat contoh kering (D-B) (gr) 29 22 Kadar air (E\F)X 100% (%) 3.448 4.545

rata rata (%) 3.996

Tabel 1.3 Pemeriksaan Batas Plastis

A No cawan 1 2 3

B Berat cawan 7 7 7.4

C B cawan + tnh basah (gr) 11 10.4 11.1 D B cawan + tnh kering (gr) 10.2 9.8 10.2

E B air (c-d) 0.8 0.6 0.9

F Berat contoh kering (d-b) (gr) 3.2 2.8 2.8 G Kadar air (e\f)x100% (%) 25 21.429 32.143

(7)

B cawan + tnh kering 52.8 52.8

Berat air 6.6 6.3

Berat contoh kering 8.3 9.1 Kadar air 79.518 69.231 Isi contoh basah 11 11 Isi contoh kering 8 8 Rata rata 43.373 36.264

39.818

Sampel I

Tabel 1.5 Pemeriksaan Batas Cair

Banyaknya pukulan 6 12 22 37 39

A No cawan 1 2 3 4 5

B Berat cawan 7.5 7.5 7.4 7.2 7.5

C B cawan + tnh basah (gr) 10.7 13 13.4 12.5 12 D B cawan + tnh kering (gr) 9.3 10.9 9.5 11.4 11.2

E B air (c-d) 1.4 2.1 0.6 1.1 0.8

F Berat contoh kering (d-b) (gr) 1.8 3.4 2.1 4.2 3.7 G Kadar air (e\f)x100% (%) 77.778 61.765 28.571 26.190 21.622

Rata-rata 43.185

0 20 40 60 80 100

1 10 100

Jumlah Pukulan

Kadar air (

%

)

(8)

Banyaknya pukulan 11 12 23 28 40

A No cawan 1 2 3 4 5

B Berat cawan 7.4 7.5 7.1 7.3 7.3

C B cawan + tnh basah (gr) 14 12 15.8 15 14.1 D B cawan + tnh kering (gr) 8.6 10.3 12.4 11.9 11.3

E B air (c-d) 5.4 1.7 3.4 3.1 2.8

F Berat contoh kering (d-b) (gr) 1.2 2.8 5.3 4.6 4 G Kadar air (e\f)x100% (%) 450 60.714 64.151 67.391 70

Rata-rata 54.744

0 10 20 30 40 50 60 70

1 10 100

Jumlah Pukulan

Kadar air (

%

)

Gambar 1.2 Grafik hubungan kadar air dengan jumlah pukulan

Sampel III

Tabel 1.7 Pemeriksaan Batas Cair

Banyaknya pukulan 8 22 25 33 38

A No cawan 1 2 3 4 5

B Berat cawan 5.4 20.8 5.3 4.9 7.5

C B cawan + tnh basah (gr) 12.7 29.6 11.6 11.5 14.2 D B cawan + tnh kering (gr) 9.5 26.1 9.9 9.6 11.5

E B air (c-d) 3.2 3.5 1.7 1.9 2.7

F Berat contoh kering (d-b) (gr) 4.1 5.3 4.6 4.7 4 G Kadar air (e\f)x100% (%) 78.049 66.038 36.957 40.426 67.500

(9)

0 20 40

1 10 100

Jumlah Pukulan

Kadar air (

Gambar 1.3 Grafik hubungan kadar air dengan jumlah pukulan

Rata-rata Batas Cair (Liquid Limit) :

(

)

51.908

3

57.794

54.744

43.185

=

+

(10)

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 3 3 6.818 37.182 62.818

NO 50 0 3 0.000 37.182 62.818

NO 60 0 3 0.000 37.182 62.818

NO 100 1 4 2.273 34.909 65.091

NO 200 2 6 4.545 30.364 69.636

PAN 1 7 2.273 28.091 71.909

Tabel A.9 Percobaan II analisa saringan

Berat tertahan (gram)

% komulatif

UKURAN

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 2 2 4.545 39.455 60.545

NO 50 0 2 0.000 39.455 60.545

NO 60 0 2 0.000 39.455 60.545

NO 100 1 3 2.273 37.182 62.818

NO 200 3 6 6.818 30.364 69.636

PAN 0 6 0.000 30.364 69.636

Tabel A.13 Percobaan III analisa saringan

Berat tertahan (gram)

% komulatif

UKURAN

SARINGAN Masing-masing komulatif Masing-masing Tertahan Lolos

NO 4 0 0 0 44 100

NO 30 4 4 9.091 34.909 65.091

NO 50 0 4 0.000 34.909 65.091

NO 60 0 4 0.000 34.909 65.091

NO 100 1 5 2.273 32.636 67.364

NO 200 2 7 4.545 28.091 71.909

(11)

Gambar 1.4. Grafik AASHTO

Gambar 1.5. Grafik ASTM

0 10 20 30 40 50 60 70 80 90 100

0.001 0.01 0.1 1 10 100

Ukuran Butir (mm)

P

er

sen

L

o

lo

s

Lanau (silt) Pasir (sand) Kerikil (gravel)

15 %

16 %

58 % Clay

11 %

0 10 20 30 40 50 60 70 80

0.001 0.01 0.1 1 10 100

Ukuran Butir (mm)

P

e

rsen

L

o

lo

s

Pasir = 16 %

Lanau = 11 %

(12)

Hidrometer no : 151 H

Pemeriksaan hidrometer

Tabel 1.8 Pemeriksaan hidrometer Sampel I

Waktu (menit)

2

5

15

30

60

250

1440

Diameter butir (d) mm

0.04 0.028 0.015 0.01 0.0074 0.0036 0.0015

Rh

1.0215 1.0215 1.021 1.02 1.019 1.0185 1.017

Koreksi

bacaan

Hidrometer

KL

0.82 0.82 0.825 0.83 0.84 0.85 0.86

Gs

3.576 3.576 3.576 3.576 3.576 3.576 3.576

Koreksi

berat jenis

tanah

KG

0.9 0.9 0.9 0.9 0.9 0.9 0.9

t

0

F

84.2 84.2 84.2 84.2 84.2 84.2 84.2

Koreksi

temperatur

larutan

KN

0.91 0.91 0.91 0.91 0.91 0.91 0.91

Diameter butir terkoreksi

D = d x KL x KG x KL (mm)

0.027 0.019 0.010 0.007 0.005 0.003 0.001

dR

0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006

Bacaan

Hidrometer

setelah

terkoreksi

R=Rh+dR

1.0221 1.0221 1.0216 1.0206 1.0196 1.0191 1.0176

Konstanta BJ tanah (a)

0.94 0.94 0.94 0.94 0.94 0.94 0.94

Persen lebih kecil (P)

72.528 72.528 70.887 67.606 64.324 62.683 57.760

(P) setelah dikoreksi

10.359 10.359 10.125 9.656 9.187 8.953 8.250

Untuk Hidrometer 151 H

100

)

1

(

1606

×

×

×

=

W

a

R

P

w1 = berat contoh tanah kering udara

= 50 gram

(A)

Berat contoh tanah kering udara

= 50 gram

(B)

Berat contoh tanah kering oven

= 46 gram

(C)

Persen higroskopis =

×

100

B

B

A

= 8.696 %

696

.

8

100

100

50

100

100

1

+

×

=

+

×

=

C

w

(13)

Hidrometer no : 151 H

Pemeriksaan hidrometer

Tabel 1.9 Pemeriksaan hidrometer Sampel II

Waktu (menit)

2

5

15

30

60

250

1440

Diameter butir (d) mm

0.04 0.028 0.015 0.01 0.0074 0.0036 0.0015

Rh

1.023 1.022 1.0215 1.02 1.0195 1.019 1.0113

Koreksi

bacaan

Hidrometer

KL

0.815 0.825 0.82 0.83 0.835 0.84 0.87

Gs

3.576 3.576 3.576 3.576 3.576 3.576 3.576

Koreksi

berat jenis

tanah

KG

0.9 0.9 0.9 0.9 0.9 0.9 0.9

t

0

F

84.2 84.2 84.2 84.2 84.2 84.2 84.2

Koreksi

temperatur

larutan

KN

0.91 0.91 0.91 0.91 0.91 0.91 0.91

Diameter butir terkoreksi

D = d x KL x KG x KL (mm)

0.027 0.019 0.010 0.007 0.005 0.002 0.001

dR

0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006

Bacaan

Hidrometer

setelah

terkoreksi

R=Rh+dR

1.0236 1.0226 1.0221 1.0206 1.0201 1.0196 1.0119

Konstanta BJ tanah (a)

0.94 0.94 0.94 0.94 0.94 0.94 0.94

Persen lebih kecil (P)

79.172 75.817 74.140 69.108 67.431 65.753 39.922

(P) setelah dikoreksi

11.311 10.831 10.592 9.873 9.633 9.394 5.703

Untuk Hidrometer 151 H

100

)

1

(

1606

×

×

×

=

W

a

R

P

w1 = berat contoh tanah kering udara

= 50 gram

(D)

Berat contoh tanah kering udara

= 50 gram

(E)

Berat contoh tanah kering oven

= 45 gram

(F)

Persen higroskopis =

×

100

B

B

A

= 11.111 %

696

.

8

100

100

50

100

100

1

+

×

=

+

×

=

C

w

(14)

Hidrometer no : 151 H

Pemeriksaan hidrometer

Tabel 1.10 Pemeriksaan hidrometer Sampel III

Waktu (menit)

2

5

15

30

60

250

1440

Diameter butir (d) mm

0.04 0.028 0.015 0.01 0.0074 0.0036 0.0015

Rh

1.026 1.026 1.025 1.024 1.0225 1.021 1.021

Koreksi

bacaan

Hidrometer

KL

0.77 0.77 0.78 0.79 0.828 0.82 0.82

Gs

3.576 3.576 3.576 3.576 3.576 3.576 3.576

Koreksi

berat jenis

tanah

KG

0.9 0.9 0.9 0.9 0.9 0.9 0.9

t

0

F

84.2 84.2 84.2 84.2 84.2 84.2 84.2

Koreksi

temperatur

larutan

KN

0.91 0.91 0.91 0.91 0.91 0.91 0.91

Diameter butir terkoreksi

D = d x KL x KG x KL (mm)

0.025 0.018 0.010 0.006 0.005 0.002 0.001

dR

0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006

Bacaan

Hidrometer

setelah

terkoreksi

R=Rh+dR

1.0266 1.0266 1.0256 1.0246 1.0231 1.0216 1.0216

Konstanta BJ tanah (a)

0.94 0.94 0.94 0.94 0.94 0.94 0.94

Persen lebih kecil (P)

87.452 87.452 84.165 80.877 75.946 71.014 71.014

(P) setelah dikoreksi

10.932 10.932 10.521 10.110 9.493 8.877 8.877

Untuk Hidrometer 151 H

100

)

1

(

1606

×

×

×

=

W

a

R

P

w1 = berat contoh tanah kering udara

= 49 gram

(G)

Berat contoh tanah kering udara

= 49 gram

(H)

Berat contoh tanah kering oven

= 45 gram

(I)

Persen higroskopis =

×

100

B

B

A

= 8.889 %

696

.

8

100

100

50

100

100

1

+

×

=

+

×

=

C

w

(15)

Tabel 1.11. Tabel analisa saringan sampel 1.

Berat tertahan (gram)

% komulatif

UKURAN SARINGAN

Masing-masing Komulatif Masing-masing Lolos

NO 4 0 0 0 100

NO 30 4 4 57.143 42.857

NO 50 0 4 57.143 42.857

NO 60 0 4 57.143 42.857

NO 100 1 5 71.429 28.571

NO 200 2 6 85.714 14.286

PAN 1 7 100 0

Tabel 1.12. Tabel analisa saringan sampel 2.

Berat tertahan (gram)

% komulatif

UKURAN SARINGAN

Masing-masing Komulatif Tertahan Lolos

NO 4 0 0 0 100

NO 30 2 2 28.571 71.429

NO 50 0 2 28.571 71.429

NO 60 0 2 28.571 71.429

NO 100 1 3 42.857 57.143

NO 200 3 6 85.714 14.286

PAN 1 7 100 0

Tabel 1.13. Tabel analisa saringan sampel 3.

Berat tertahan (gram)

% komulatif

UKURAN SARINGAN

Masing-masing komulatif Tertahan Lolos

NO 4 0 0 0 100

NO 30 4 4 50 50

NO 50 0 4 50 50

NO 60 0 4 50 50

NO 100 1 5 62.5 37.5

NO 200 2 7 87.5 12.5

(16)

Tabel 1.14 Pembagian butir menurut USCS

Klasifikasi Sampel

1 Sampel 2

Sampel 3

Kerikil (

gravel

)

0 0 0

Pasir (

sand

)

100-13.5 = 86.5 100-14 = 86 100-14 = 86

Lanau (

silt

)

13.5-5 = 8.5 14-9.2 = 4.8 14-9.5 = 4.5

Lempung (

clay

)

6-1 = 1 9.2-5.1 = 4.1 9.5-9 = 0.5

Tabel 1.15 Pembagian butir menurut AASHTO

Klasifikasi Sampel

1 Sampel 2

Sampel 3

Kerikil (

gravel

)

100-75 = 25 100-89 = 11 100-78 = 22

Pasir kasar

75-42 = 33 89-72 = 17 78-53 = 25

Pasir sedang

42-37 = 5 72-67 = 5 53-46 = 7

Pasir halus

37-13 = 24 67-13.5 = 53.5 46-11 = 35

Lanau (

silt

)

13-6 = 7 13.5-8 = 5.5 11-9.5 = 1.5

Lempung (

clay

)

7-6.2 = 0.8 5-2 = 3 9.5-9 = 0.5

Tabel 1.16 Koefisien keseragaman

Koefisien Sampel

1

Sampel 2

Sampel 3

D

10

0.01 mm

0.01 mm

0.006 mm

D

30

0.160 mm

0.089 mm

0.130 mm

D

60

0.980 mm

0.180 mm

1 mm

10 60

D

D

CU

=

98

18

166.667

)

(

)

(

60 10

2 30

D

D

D

CC

×

=

2.612

4.401

2.817

CU rata-rata

94.222
(17)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Lampiran 2

Tabel 2.1 Perhitungan kadar air dari pemadatan proktor

Penambahan Air 200 300 400 500 600

Sampel 1 2 1 2 1 2 1 2 1 2

Berat Cawan (gr) 7.3 7 7.5 7 7.3 7 7.1 7 7.6 7

Berat cawan + Tanah Basah (gr) 18.9 20 26.8 25 22.6 34 28.9 42 35.9 31

Berat cawan + Tanah Kering (gr) 17 19 22 23.5 19 29 22 34 27 25

Berat Air (gr) 1.9 1 4.8 1.5 3.6 5 6.9 8 8.9 6

Berat Tanah Kering (gr) 9.7 12 14.5 16.5 11.7 22 14.9 27 19.4 18

Kadar Air (%) 19.588 8.333 33.103 9.091 30.769 22.727 46.309 29.630 45.876 33.333

Rata-rata Kadar Air (%) 13.960 21.097 26.748 37.969 39.605

Tabel 2.2 Perhitungan berat volume kering dari hasil pemadatan proktor

Sampel 1 2 1 2 1 2 1 2 1 2

berat cetakan 3062 3508 3438 3055 2059 3051 3501 3442 2967 3506

b. tanah basah+cetakan 4501 4998 5120 4645 3656 4704 5068 4992 4553 5012

b. tanah basah 1439 1490 1682 1590 1597 1653 1567 1550 1586 1506

isi cetakan 943 943 943 943 943 943 943 943 943 943

berat isi basah 1.526 1.580 1.784 1.686 1.694 1.753 1.662 1.644 1.682 1.597

berat isi kering 1.276 1.459 1.340 1.546 1.295 1.428 1.136 1.268 1.153 1.198

(18)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Lampiran B

Gambar 2.1Grafik hubungan berat isi kering dan kadar air

13.960, 1.367

21.097, 1.443

26.748, 1.362

37.969, 1.202 39.605, 1.175

1.100 1.150 1.200 1.250 1.300 1.350 1.400 1.450 1.500

0.000 10.000 20.000 30.000 40.000 50.000

Kadar air (%)

B

e

ra

t Is

i K

e

rin

g

(

g

r/c

m

(19)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Tabel B.2 Perhitungan berat volume kering dari hasil pemadatan proktor

Penambahan Air 200 300 400 500 600

Sampel 1 2 1 2 1 2 1 2 1 2

Berat Cawan (gr) 7.3 7 7.5 7 7.3 7 7.1 7 7.6 7

Berat cawan + Tanah Basah (gr) 18.9 20 26.8 25 22.6 34 28.9 42 35.9 31

Berat cawan + Tanah Kering

(gr) 17.8 19 22 23 19 29 22 34 27 25

Berat Air (gr) 1.1 1 4.8 2 3.6 5 6.9 8 8.9 6

Berat Tanah Kering (gr) 10.5 12 14.5 16 11.7 22 14.9 27 19.4 18

Kadar Air (%) 10.476 8.333 33.103 12.500 30.769 22.727 46.309 29.630 45.876 33.333

Rata-rata Kadar Air (%) 9.405 22.802 26.748 37.969 39.605

Tabel B.1 Perhitungan kadar air dari pemadatan proktor

Sampel 1 2 1 2 1 2 1 2 1 2

berat cetakan 3195 3700 3438 3055 2059 3051 3501 3442 2967 3506

b. tanah basah+cetakan 4468 4977 5120 4645 3656 4704 5068 4992 4553 5012

b. tanah basah 1273 1277 1682 1590 1597 1653 1567 1550 1586 1506

isi cetakan 943 943 943 943 943 943 943 943 943 943

berat isi basah 1.350 1.354 1.784 1.686 1.694 1.753 1.662 1.644 1.682 1.597

berat isi kering 1.222 1.250 1.340 1.499 1.295 1.428 1.136 1.268 1.153 1.198

(20)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

1.000

1.050

1.100

1.150

1.200

1.250

1.300

1.350

1.400

1.450

0.000

10.000 20.000 30.000

40.000 50.000

Kadar Air (%)

Berat Isi K

e

ring (kg/c

m2)

(21)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Perhitungan berat volume kering dari hasil pemadatan proktor

Penambahan Air 200 300 400 500 600

Sampel 7.5 7 7.2 7 7.4 7 7.9 7 7.3 7

Berat Cawan (gr) 16.4 27 20 30 39.5 51 37.1 37 25.9 26

Berat cawan + Tanah Basah (gr) 15.7 26 18.3 26 32 42 30 30 20.5 21

Berat cawan + Tanah Kering (gr) 0.7 1 1.7 4 7.5 9 7.1 7 5.4 5

Berat Air (gr) 8.2 19 11.1 19 24.6 35 22.1 23 13.2 14

Berat Tanah Kering (gr) 8.537 5.263 15.315 21.053 30.488 25.714 32.127 30.435 40.909 35.714

Kadar Air (%) 7.5 7 7.2 7 7.4 7 7.9 7 7.3 7

Rata-rata Kadar Air (%) 6.900 18.184 28.101 31.281 38.312

Perhitungan kadar air dari pemadatan proktor

Sampel 1 2 1 2 1 2 1 2 1 2

berat cetakan 3500 3525 2907 3055 3603 3506 3975 3442 3054 3051

b. tanah basah+cetakan 4968 5127 4555 4720 5216 5135 5576 5040 4622 4618

b. tanah basah 1468 1602 1648 1665 1613 1629 1601 1598 1568 1567

isi cetakan 943 943 943 943 943 943 943 943 943 943

berat isi basah 1.557 1.699 1.748 1.766 1.710 1.727 1.698 1.695 1.663 1.662

berat isi kering 1.434 1.614 1.516 1.459 1.311 1.374 1.285 1.299 1.180 1.224

(22)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8

0 10 20 30 40 50

Kadar air (% )

B

era

t i

si

k

eri

n

g

(

k

g

/cm

2

)

(23)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Lampiran 2.

Tabel 2.1 Perhitungan berat volume kering dari hasil pemadatan proctor

Penambahan Air 100 200 300 400 500 600

Sampel 1 2 1 2 1 2 1 2 1 2 1 2

Berat Cawan (gr) 7.3 7 7.3 7 7 7 7 7 7.1 7 7.6 7

Berat cawan + Tanah Basah (gr) 20.2 20 18.9 20 25.8 26.4 22.5 33 27 43 36.5 30.5

Berat cawan + Tanah Kering (gr) 18.7 19 17 19 23.5 24 19.2 28.5 22 33 28.5 24

Berat Air (gr) 1.5 1 1.9 1 2.3 2.4 3.3 4.5 5 10 8 6.5

Berat Tanah Kering (gr) 11.4 12 9.7 12 16.5 17 12.2 21.5 14.9 26 20.9 17

Kadar Air (%) 13.158 8.333 19.588 8.333 13.939 14.118 27.049 20.930 33.557 38.462 38.278 38.235

Rata-rata Kadar Air (%) 10.746 13.960 14.029 23.990 36.009 38.256

Tabel 2.2 Perhitungan kadar air dari pemadatan proctor

Sampel 1 2 1 2 1 2 1 2 1 2 1 2

berat cetakan 3438 3523 3069 3525 3438 3055 2059 3051 3523 3438 2907 3437

b. tanah basah+cetakan 4622 4618 4468 4977 5120 4645 3656 4704 5068 4980 4453 5112

b. tanah basah 1184 1095 1399 1452 1682 1590 1597 1653 1545 1542 1546 1675

isi cetakan 943 943 943 943 943 943 943 943 943 943 943 943

berat isi basah 1.256 1.161 1.484 1.540 1.784 1.686 1.694 1.753 1.638 1.635 1.639 1.776

berat isi kering 1.110 1.072 1.241 1.421 1.565 1.478 1.333 1.450 1.227 1.181 1.186 1.285

(24)

LABORATORIUM TEKNIK SIPIL

A. Yani Tromol Pos I – Pabelan, Kartasura Telp. (0271) 717417,719484. Fax : 715448 Surakarta 57162

Lampiran 2.

1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70

0 10 20 30 40 50 60

Moisture Content, %

D

ry

D

e

ns

ity

, g/

c

m

3

Saturation Line

Gambar 2.1Grafik hubungan berat isi kering dan kadar air

(25)

Sampel 1

Tabel 3. 1 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{90 %

γ

dry maksimum

(kadar air 34.5 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0

0.25 0.0125 0.1 2.7332

0.5 0.025 0.3 8.1996

1 0.05 0.9 24.5988

1.5 0.075 1 27.332

2 0.1 1.2 32.7984

3 0.15 1.9 51.9308

4 0.2 2.1 57.3972

5 0.25 2.5 68.33

6 0.3 3 81.996

8 0.4 3.2 87.4624

10 0.5 3.7 101.1284

0

20

40

60

80

100

120

0

0.1

0.2

0.3

0.4

0.5

0.6

Penurunan (inchi)

Beban (lbs)

(26)

Sampel 2

Tabel 3. 2 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{90%

γ

dry maksimum

(kadar air 34.5 %) }.

PENURUNAN PEMB WAKTU(MNT)

ACAAN

BERAT(LBS)

(INCHI) DIAL(DIV)

0 0 0 0

0.25 0.0125 1 27.332

0.5 0.025 1 27.332 1 0.05 2 54.664 1.5 0.075 2.5 68.33

2 0.1 3 81.996

3 0.15 4.5 122.994

4 0.2 5.5 150.326

6 0.3 7 191.324

8 0.4 8 218.656

10 0.5 9 245.988

Gambar 3. 2 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0 50 100

150 200 250

300

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(27)

Pemeriksaan

California Bearing Ratio(Unsoaked)

Pemeriksaan CBR tanah asli

{90 %

γ

dry maksimum

(kadar air 34.5 %)}

Tabel 3. 3 Hitungan nilai CBR

unsoaked

Sampel 2

Penurunan

Sampel 1

0.1”(inchi)

36 / ( 3 x 1000 ) x 100%= 1.2 %

85 / ( 3 x 1000 ) x 100%= 2.83 %

0.2 “(inchi)

6

0 / ( 3 x 1500 ) x 100%= 1.34 %

150 / ( 3 x 1500 ) x 100%= 3.33 %

Tabel 3. 4 Pemeriksaan berat isi kering

Sampel I Sampel II

BERAT ISI

A BERAT CETAKAN 7573 7555

B B. TANAH + CETAKAN 11315 11472

C B. TANAH BASAH(B-A) 3742 3917

D VOLUME CETAKAN 2330.078 2330.078

R BERAT ISI TANAH 1.606 1.681

F BERAT ISI KERING 1.204 1.236

Tabel 3. 5 Pemeriksaan kadar air

Sampel I Sampel II

KADAR AIR

G NOMOR TIN BOX 3 10

H BERAT TIN BOX 5 5

I B. TIN BOX+TANAH BASAH 25 39

J B.TIN BOX+TANAH KERING 20 30

K BERAT TANAH KERING 15 25

L BERAT AIR (I-J) 5 9

(28)

Sampel 1

Tabel 3. 6 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{95%

γ

dry maksimum

(kadar air 31 %)}

WAKTU

(MNT) PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0 0.25 0.0125 0.7 19.1324

0.5 0.025 1.2 32.7984

1 0.05 3 81.996

1.5 0.075 4.5 122.994

2 0.1 6.6 180.3912

3 0.15 11 300.652

4 0.2 16 437.312

5 0.25 21.2 579.4384

6 0.3 27 737.964

8 0.4 37 1011.284

10 0.5 43 1175.276

0 200 400 600 800 1000 1200 1400

0

0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(29)

Sampel 2

Tabel 3. 7 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{95%

γ

dry maksimum

(kadar air 31 %) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN

DIAL(DIV) BERAT(LBS) 0 0 0 0 0.25 0.0125 2 54.664

0.5 0.025 4 109.328

1 0.05 7.5 204.99

1.5 0.075 14 382.648

2 0.1 20 546.64

3 0.15 30.5 833.626

4 0.2 40 1093.28

6 0.3 56 1530.592

8 0.4 68.5 1872.242

10 0.5 79 2159.228

0 500 1000 1500 2000 2500

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(30)

Pemeriksaan

California Bearing Ratio(Unsoaked)

[image:30.595.108.552.205.287.2]

Pemeriksaan CBR tanah asli

{95%

γ

dry maksimum

(kadar air 31 %)}

Tabel 3. 8 Hitungan nilai CBR

unsoaked

Penurunan

Sampel 1

Sampel 2

0.1”(inchi)

210 / ( 3 x 1000 ) x 100%= 7 %

580 / ( 3 x 1000 ) x 100%= 19.33 %

[image:30.595.112.540.349.467.2]

0.2 “(inchi) 443 / ( 3 x 1500 ) x 100%= 9.84 %

1090 / ( 3 x 1500 ) x 100%= 24.22

%

Tabel 3. 9 Pemeriksaan berat isi kering

BERAT ISI Sampel I Sampel II

A BERAT CETAKAN 7140 7470

B B. TANAH + CETAKAN 10966 11575

C B. TANAH BASAH(B-A) 3826 4105

D VOLUME CETAKAN 2330.078 2330.078

R BERAT ISI TANAH 1.642 1.762

F BERAT ISI KERING 1.256 1.391

Tabel 3. 10 Pemeriksaan kadar air

KADAR AIR Sampel I Sampel II

G NOMOR TIN BOX 7 13

H BERAT TIN BOX 5 4

I B. TIN BOX+TANAH BASAH 22 42

J B.TIN BOX+TANAH KERING 18 34

K BERAT TANAH KERING 13 30

L BERAT AIR (I-J) 4 8

[image:30.595.113.541.525.647.2]
(31)
[image:31.595.126.489.161.710.2]

Sampel 1

Tabel 3. 11 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{

γ

dry maksimum

(kadar air 24 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0

0.25 0.0125 0.9 24.5988

0.5 0.025 2 54.664

1 0.05 4.7 128.4604

1.5 0.075 7.3 199.5236

2 0.1 10.5 286.986

3 0.15 16.7 456.4444

4 0.2 21 573.972

5 0.25 23 628.636

6 0.3 24 655.968

8 0.4 26.1 713.3652

10 0.5 29 792.628

0 100 200 300 400 500 600 700 800 900

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(32)
[image:32.595.161.464.181.707.2]

Sampel 2

Tabel 3. 12 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{

γ

dry maksimum

(kadar air 24 %) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN

DIAL(DIV) BERAT(LBS)

0 0 0 0 0.25 0.0125 3.5 95.662

0.5 0.025 4.5 122.994

1 0.05 9 245.988

1.5 0.075 13 355.316

2 0.1 17 464.644

3 0.15 21 573.972

4 0.2 24.5 669.634

6 0.3 28 765.296

8 0.4 30.5 833.626

10 0.5 32.5 888.29

0

100 200 300 400 500 600 700 800 900 1000

0 0.1 0.2 0.3 0.4 0.5 0.6

PENURUNAN (inchi)

(33)

Pemeriksaan

California Bearing Ratio(Unsoaked)

Pemeriksaan CBR tanah asli

{

γ

dry maksimum

(kadar air 24 %)}

Tabel 3. 13 Hitungan nilai CBR

unsoaked

Penurunan

Sampel 1

Sampel 2

0.1”(inchi)

298 / ( 3 x 1000 ) x 100%= 9.933 % 398 / ( 3 x 1000 ) x 100%= 13.267 %

0.2 “(inchi) 525 / ( 3 x 1500 ) x 100%= 11.67 %

670 / ( 3 x 1500 ) x 100%= 14.89 %

Tabel 3. 14 Pemeriksaan berat isi kering

BERAT ISI Sampel I Sampel II

A BERAT CETAKAN 7555 7140

B B. TANAH + CETAKAN 12540 10975

C B. TANAH BASAH(B-A) 4985 3835

D VOLUME CETAKAN 2238.917 2238.917

R BERAT ISI TANAH 2.226 1.713

[image:33.595.112.541.503.628.2]

F BERAT ISI KERING 1.669 1.240

Tabel 3.15 Pemeriksaan kadar air

KADAR AIR Sampel I Sampel II

G NOMOR TIN BOX 7 7

H BERAT TIN BOX 5 4

I B. TIN BOX+TANAH BASAH 17 33

J B.TIN BOX+TANAH KERING 14 25

K BERAT TANAH KERING 9 21

L BERAT AIR (I-J) 3 8

(34)
[image:34.595.143.505.156.722.2]

Sampel 1

Tabel 3. 16 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{95 %

γ

dry maksimum

(kadar air 16.5 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0

0.25 0.0125 1 27.332

0.5 0.025 2 54.664

1 0.05 3.9 106.5948

1.5 0.075 5.8 158.5256

2 0.1 7.1 194.0572

3 0.15 9.5 259.654

4 0.2 11 300.652

5 0.25 11.3 308.8516

6 0.3 13.2 360.7824

8 0.4 14.9 407.2468

10 0.5 15.7 429.1124

0

50 100

150

200 250 300 350 400 450 500

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(35)
[image:35.595.154.462.161.710.2]

Sampel 2

Tabel 3. 17 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{95%

γ

dry maksimum

(kadar air 16.5 %) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN

DIAL(DIV) BERAT(LBS) 0 0 0 0 0.25 0.0125 2.5 68.33

0.5 0.025 4.5 122.994

1 0.05 7 191.324

1.5 0.075 10 273.32

2 0.1 12.5 341.65

3 0.15 15.5 423.646

4 0.2 17 464.644

6 0.3 20 546.64

8 0.4 22 601.304

10 0.5 23.5 642.302

0 100 200

300

400 500 600 700

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(36)

Pemeriksaan

California Bearing Ratio(Unsoaked)

Pemeriksaan CBR tanah asli

{95 %

γ

dry maksimum

(kadar air 16.5 %)}

Tabel 3. 18 Hitungan nilai CBR

unsoaked

Penurunan

Sampel 1

Sampel 2

[image:36.595.114.538.307.418.2]

0.1”(inchi)

172 / ( 3 x 1000 ) x 100%= 5.73 %

280 / ( 3 x 1000 ) x 100%= 9.33 %

0.2 “(inchi) 298 / ( 3 x 1500 ) x 100%= 6.62 %

485 / ( 3 x 1500 ) x 100%= 10.78 %

Tabel 3. 19 Pemeriksaan berat isi kering

BERAT ISI Sampel I Sampel II

A BERAT CETAKAN 7367 7016

B B. TANAH + CETAKAN 10793 10590

C B. TANAH BASAH(B-A) 3426 3574

D VOLUME CETAKAN 2238.917 2238.917

R BERAT ISI TANAH 1.530 1.596

[image:36.595.114.541.466.586.2]

F BERAT ISI KERING 1.331 1.297

Tabel 3. 20 Pemeriksaan kadar air

KADAR AIR Sampel I Sampel II

G NOMOR TIN BOX 8 2

H BERAT TIN BOX 4.9 5

I B. TIN BOX+TANAH BASAH 28 37

J B.TIN BOX+TANAH KERING 25 31

K BERAT TANAH KERING 20.1 26

L BERAT AIR (I-J) 3 6

(37)
[image:37.595.137.502.165.707.2]

Sampel 1

Tabel 3. 21 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{90%

γ

dry maksimum

(kadar air 13.5 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0

0.25 0.0125 1 27.332

0.5 0.025 2.1 57.3972

1 0.05 5.2 142.1264

1.5 0.075 9 245.988

2 0.1 13.1 358.0492

3 0.15 21.8 595.8376

4 0.2 29 792.628

5 0.25 34.2 934.7544

6 0.3 39 1065.948

8 0.4 46.8 1279.1376

10 0.5 53 1448.596

0 200 400 600 800 1000 1200 1400

1600

0

0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

(38)
[image:38.595.130.459.154.712.2]

Sampel 2

Tabel 3. 22 Pembacaan dial pengujian CBR

unsoaked

(tanpa rendaman)

{90%

γ

dry maksimum

(kadar air 13.5 %) }.

AKTU(MNT) PENURUNAN PE

W MBACAAN BERAT(LBS)

(INCHI) DIAL(DIV)

0 0 0 0

0.25 0.0125 2 54.664

0.5 0.025 4 109.328

1 0.05 7 191.324

1.5 0.075 11 300.652

2 0.1 16 437.312

3 0.15 25 683.3

4 0.2 35 956.62

6 0.3 56 1530.592

8 0.4 74 2022.568

10 0.5 89 2432.548

chi)

Gambar 3. 10 Grafik hubungan beban (lbs) dengan penurunan (in

0 500 1000 1500 2000 2500 3000

0

0.1 0.2 0.3 0.4 0.5 0.6

(39)

Pemeriksaan

California Bearing Ratio(Unsoaked)

Pemeriksaan CBR tanah asli

{90%

γ

dry maksimum

(kadar air 13.5 %)}

Tabel 3. 23 Hitungan nilai CBR

unsoaked

Sampel 2

Penurunan

Sampel 1

0.1”(inchi)

400 / ( 3 x 1000 ) x 100%= 13.34 % 490 / ( 3 x 1000 ) x 100%= 16.33 %

0.2 “(inchi) 675 / ( 3 x 1500 ) x 100%= 15 %

990 / ( 3 x 1500 ) x 100%= 22 %

Tabel 3. 24 Pemeriksaan berat isi kering

Sampel I Sampel II

BERAT ISI

A BERAT CETAKAN 6815 7536

B B. TANAH + CETAKAN 9886 11030

C B. TANAH BASAH(B-A) 3071 3494

D VOLUME CETAKAN 2147.756 2147.756

R BERAT ISI TANAH 1.430 1.627

[image:39.595.114.540.490.611.2]

F BERAT ISI KERING 1.317 1.376

Tabel 3. 25 Pemeriksaan kadar air

Sampel I Sampel II

KADAR AIR

G NOMOR TIN BOX 9 4

H BERAT TIN BOX 5 5

I B. TIN BOX+TANAH BASAH 43 31

J B.TIN BOX+TANAH KERING 40 27

K BERAT TANAH KERING 35 22

L BERAT AIR (I-J) 3 4

(40)
[image:40.595.111.499.161.728.2]

Sampel 1

Tabel 3. 26 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{90 %

γ

dry maksimum

(kadar air 13.5 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0 0.25 0.0125 0.1 2.7332

0.5 0.025 0.3 8.1996

1 0.05 0.5 13.666

1.5 0.075 0.8 21.8656

2 0.1 1 27.332

3 0.15 1.1 30.0652

4 0.2 1.2 32.7984

5 0.25 1.25 34.165

6 0.3 1.9 51.9308

8 0.4 2 54.664

10 0.5 2.7 73.7964

0 10 20 30 40 50 60 70 80

0

0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

lbs)

(41)
[image:41.595.131.454.157.648.2]

Sampel 2

Tabel 3. 27 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{90%

γ

dry maksimum

(kadar air 13.5 %) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN

DIAL(DIV) BERAT(LBS)

0 0 0 0.00

0.25 0.0125 0.1 2.73 0.5 0.025 0.1 2.73

1 0.05 0.3 8.20

1.5 0.075 0.3 8.20

2 0.1 0.5 13.67

3 0.15 0.6 16.40

4 0.2 0.9 24.60

6 0.3 1 27.33

8 0.4 1.2 32.80

10 0.5 1.5 41.00

0 5 10 15 20 25 30 35 40 45

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

lbs)

(42)

Pemeriksaan

California Bearing Ratio(soaked)

Pemeriksaan CBR tanah asli

{90 %

γ

dry maksimum

(kadar air 13.5 %)}

Tabel 3. 28 Hitungan nilai CBR

soaked

Penurunan

Sampel 1

Sampel 2

[image:42.595.112.496.293.415.2]

0.1”(inchi)

19 / ( 3 x 1000 ) x 100%= 0.63 %

12 / ( 3 x 1000 ) x 100%= 0.4 %

0.2 “(inchi)

5.9 / ( 3 x 1500 ) x 100%= 0.131 %

21.5 / ( 3 x 1500 ) x 100%= 0.478 %

Tabel 3. 29 Pemeriksaan berat isi kering

Sampel 1 Sampel 2

BERAT ISI Sebelum Sesudah Sebelum Sesudah

A BERAT CETAKAN 6665 6665 7596 7596

B B. TANAH + CETAKAN 10547 10828 11344 11985

C B. TANAH BASAH(B-A) 3882 4163 3748 4389

D VOLUME CETAKAN 2279.03 2290.06 2279.028 2284.935

R BERAT ISI TANAH 1.70 1.82 1.645 1.921

[image:42.595.114.514.466.601.2]

F BERAT ISI KERING 1.48 1.14 1.410 1.281

Tabel 3. 30 Pemeriksaan kadar air

Sampel 1 Sampel 2

KADAR AIR Sebelum Sesudah Sebelum Sesudah

G NOMOR TIN BOX 1 1 12 12

H BERAT TIN BOX 7 4 7 7

I B. TIN BOX+TANAH BASAH 60 31 42 37

J B.TIN BOX+TANAH KERING 53 21 37 27

K BERAT TANAH KERING 46 17 30 20

L BERAT AIR (I-J) 7 10 5 10

(43)
[image:43.595.116.499.159.725.2]

Sampel 1

Tabel 3. 31 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{95%

γ

dry maksimum

(kadar air 31 %)}

WAKTU (MNT)

PENURUNAN (INCHI)

PEMBACAAN DIAL (DIV)

BERAT (LBS)

0 0 0 0 0.25 0.0125 0.1 2.7332

0.5 0.025 0.2 5.4664

1 0.05 0.25 6.833

1.5 0.075 0.3 8.1996

2 0.1 0.5 13.666

3 0.15 0.6 16.3992

4 0.2 0.9 24.5988

5 0.25 1 27.332

6 0.3 1.1 30.0652

8 0.4 1.2 32.7984

10 0.5 1.3 35.5316

0 5 10 15 20 25 30 35 40

0

0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

lbs)

(44)
[image:44.595.131.453.159.647.2]

Sampel 2

Tabel 3. 32 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{95%

γ

dry maksimum

(kadar air 31 %) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN

DIAL(DIV) BERAT(LBS) 0 0 0 0 0.25 0.0125 0.1 2.7332

0.5 0.025 0.3 8.1996

1 0.05 0.5 13.666

1.5 0.075 0.8 21.8656

2 0.1 1 27.332

3 0.15 1.1 30.0652

4 0.2 1.2 32.7984

6 0.3 1.9 51.9308

8 0.4 2 54.664

10 0.5 2.7 73.7964

0 10 20 30 40 50 60 70 80

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

lbs)

(45)

Pemeriksaan

California Bearing Ratio(soaked)

Pemeriksaan CBR tanah asli

{95%

γ

dry maksimum

(kadar air 31 %)}

el 1

Sampel 2

Tabel 3. 33 Hitungan nilai CBR

soaked

Penurunan

Samp

0.1”(inchi)

12.5/ (

3 x 1000 ) x 100%= 0.416 %

21

/ ( 3 x 1

000 ) x 100

%= 0.7 %

0.2 “(inchi) 23.2 / ( 3 x 1500 ) x 100%= 0.515%

38 / ( 3 x 1500 ) x 100%= 0.84 %

abel 3. 34 Pemeriksaan berat isi kering

Sampel 1

Sampel 2

T

BERAT ISI Sebelum Sesudah Sebelum Sesudah

A BERAT CETAKAN 7000 7000 7000 7000

B B. TANAH + CETAKAN 10230 11191 0637 1 10738

C B. TANAH BASAH(B-A) 3230 4191 3972 4073

D VOLUME CETAKAN 2279.03 2289.68 2279.028 2291.881

R BERAT ISI TANAH 1.42 1.83 1.743 1.777

[image:45.595.114.519.490.615.2]

F BERAT ISI KERING 1.12 1.09 1.606 1.230

Tabel 3. 35 Pemeriksaan kadar air

Sampel 1

Sampel 2

KADAR AIR Sebelum Sesudah Sebelum Sesudah

G NOMOR TIN BOX 6 6 6 6

H BERAT TIN BOX 7 7 7 4

I B. TIN BOX+TANAH BASAH 45 39 58 30

J B.TIN BOX+TANAH KERING 37 26 54 22

K BERAT TANAH KERING 30 19 47 18

L BERAT AIR (I-J) 8 13 4 8

(46)
[image:46.595.112.534.169.704.2]

Sampel 1

Tabel 3. 36 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{

γ

dry maksimum

(kadar air 24 %)}

WAKTU PENURUN

(MNT)

AN PEMBACAAN DIAL BERAT

(INCHI) (DIV) (LBS)

0 0 0 0 0.25 0.0125 0.9 24.5988

0.5 0.025 2 54.664

1 0.05 4 .7 128.4604

1.5 0.075 7.3 199.5236

2 0.1 10.5 286.986

3 0.15 16.7 456.4444

4 0.2 21 573.972

5 0.25 23 628.636

6 0.3 24 655.968

8 0.4 26.1 713.3652

10 0.5 29 792.628

Gambar 3. 15 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0 100 200 300 400 500 600 700 800 900

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

(47)
[image:47.595.129.452.162.647.2]

Sampel 2

Tabel 3. 37 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{

γ

dry maksimum

(kadar air 24 %) }.

PENURUNAN WAKTU(MNT)

PEMBACAAN

BERAT(LBS)

(INCHI) DIAL(DIV)

0 0 0 0.00

0.25 0.0125 0.1 2.73 0.5 0.025 0.4 10.93

1 0.05 0.8 21.87

1.5 0.075 1 27.33

2 0.1 1.1 30.07

3 0.15 1.2 32.80

4 0.2 1.5 41.00

6 0.3 2 54.66

8 0.4 2.2 60.13

10 0.5 3 82.00

Gambar 3. 16 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0

10 20 30 40 50 60 70 80 90

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

(48)

Pemeriksaan

California Bearing Ratio(soaked)

Pemeriksaan CBR tanah asli

{

γ

dry maksimum

(kadar air 24 %)}

el 1

Sampel 2

Tabel 3. 38 Hitungan nilai CBR

soaked

Penurunan

Samp

0.1”(inchi)

23.9 /

( 3 x 1000 ) x 100%= 0.796%

24

/ ( 3 x 1

000 ) x 100

%= 0.8 %

0.2 “(inchi)

47 / ( 3 x 1500 ) x 100%= 1.044%

43 / ( 3 x 1500 ) x 100%= 0.956 %

Tabel 3. 39 Pemeriksaan berat isi kering

Sampel 1

Sampel 2

BERAT ISI Sebelum Sesudah Sebelum Sesudah

A BERAT CETAKAN 7536 7536 6665 6665

B B. TANAH + CETAKAN 11325 11485 11492 11747

C B. TANAH BASAH(B-A) 3789 3949 4213 4468

D VOLUME CETAKAN 2279.03 2284.26 2279.028 2287.141

R BERAT ISI TANAH 1.66 1.73 1.849 1.954

[image:48.595.114.534.468.598.2]

F BERAT ISI KERING 1.19 1.11 1.527 1.267

Tabel 3. 40 Pemeriksaan kadar air

Sampel 1

Sampel 2

KADAR AIR Sebelum Sesudah Sebelum Sesudah

G NOMOR TIN BOX 4 4 1 1

H BERAT TIN BOX 7 5 7 4

I B. TIN BOX+TANAH BASAH 39 33 30 41

J B.TIN BOX+TANAH KERING 30 23 26 28

K BERAT TANAH KERING 23 18 19 24

L BERAT AIR (I-J) 9 10 4 13

(49)
[image:49.595.111.493.163.733.2]

Sampel 1

Tabel 3. 41 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{95 %

γ

dry maksimum

(kadar air 16.5 %)}

WAKTU PENURUNAN PE

(MNT) (INCHI)

MBACAAN DIAL BERAT

(DIV) (LBS)

0 0 0 0 0.25 0.0125 0.1 2.7332

0.5 0.025 0.4 10.9328

1 0.05 0.8 21.8656

1.5 0.075 1 27.332

2 0.1 1.1 30.0652

3 0.15 1.2 32.7984

4 0.2 1.5 40.998

5 0.25 1.8 49.1976

6 0.3 2 54.664

8 0.4 2.2 60.1304

10 0.5 3 81.996

Gambar 3. 17 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0

10 20 30 40 50 60 70 80 90

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

(50)
[image:50.595.132.451.157.650.2]

Sampel 2

Tabel 3. 42 Pembacaan dial pengujian CBR

soaked

(dengan rendaman)

{95%

γ

dry maksimum

(kadar air 16.5 %) }.

PENURUNAN PEMB WAKTU(MNT)

ACAAN

BERAT(LBS)

(INCHI) DIAL(DIV)

0 0 0 0.00

0.25 0.0125 0.2 5.47 0.5 0.025 0.5 13.67

1 0.05 0.8 21.87

1.5 0.075 0.9 24.60

2 0.1 1 27.33

3 0.15 1.2 32.80

4 0.2 1.7 46.46

6 0.3 2.2 60.13

8 0.4 3 82.00

10 0.5 3.8 103.86

Gambar 3. 18 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0

20 40. 60 80 100 120

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

(51)

Pemeriksaan

California Bearing Ratio(soaked)

Pemeriksaa

n CBR tanah asli

{95 %

γ

dry maksimum

(kadar air 16.5 %)}

Tabel

Penurunan

Samp 1

Sampel 2

3. 43 Hitungan nilai CBR

soaked

el

0.1”(inchi)

23/ ( 3 x 1000 ) x 100%= 0.766 %

23 / ( 3 x 1000 ) x 100%= 0.767 %

0.2 “(inchi)

43 / (

3 x 1500 ) x 100%= 0.955%

44 /

( 3 x 150

0 ) x 100%

= 0.978 %

Tabel 3. 44 Pemeriksaan berat isi kering

Sampel 1

Sampel 2

BERAT ISI Sebelum Sesudah Sebelum Sesudah

A BERAT CETAKAN 7279 7279 7279 7279

B B. TANAH + CETAKAN 11492 11747 11225 11850

C B. TANAH BASAH(B-A) 4213 4468 3689 4314

D VOLUME CETAKAN 2279.03 2286.59 2279.028 2284.443

R BERAT ISI TANAH 1.85 1.95 1.619 1.888

[image:51.595.114.538.468.595.2]

F BERAT ISI KERING 1.44 1.34 1.337 1.401

Tabel 3. 45 Pemeriksaan kadar air

Sampel 1

Sampel 2

KADAR AIR Sebelum Sesudah Sebelum Sesudah

G NOMOR TIN BOX 11 11 11 11

H BERAT TIN BOX 7 4 7 5

I B. TIN BOX+TANAH BASAH 34 39 30 36

J B.TIN BOX+TANAH KERING 28 28 26 28

K BERAT TANAH KERING 21 24 19 23

L BERAT AIR (I-J) 6 11 4 8

(52)

Sampel 1

embacaan dial pen

soaked

(dengan rendaman)

{90%

Tabel 3. 46 P

gujian CBR

γ

dry maksimum

(kadar air 34.5

(M (DIV) (LBS)

%)}

WAKTU

NT)

PENURUNAN (INCHI)

PEMBACAAN DIAL BERAT

0 0 0 0 0.25 0.0125 0.1 2.7332

0.5 0.025 0.1 2.7332

1 0.05 0.3 8.1996

1.5 0.075 0.3 8.1996

2 0.1 0.5 13.666

3 0.15 0.6 16.3992

4 0.2 0.9 24.5988

5 0.25 0.9 24.5988

6 0.3 1 27.332

8 0.4 1.2 32.7984

10 0.5 1.5 40.998

Gambar 3. 19 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0

5 10 15 20 25 30

35

40

0 0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

45

Beb

an (

(53)

embacaan dial pen

soaked

(dengan rendaman)

{90%

Sampel 2

Tabel 3. 47 P

gujian CBR

γ

dry maksimum

(kadar air 34.5

L(DIV) BERAT(LBS)

%) }.

WAKTU(MNT)

PENURUNAN (INCHI)

PEMBACAAN DIA

0 0 0 0.00

0.25 0.0125 0.1 2.73 0.5 0.025 0.2 5.47

1 0.05 0.25 6.83

1.5 0.075 0.3 8.20

2 0.1 0.5 13.67

3 0.15 0.6 16.40

4 0.2 0.9 24.60

6 0.3 1.1 30.07

8 0.4 1.2 32.80

10 0.5 1.3 35.53

Gambar 3. 20 Grafik hubungan beban (lbs) dengan penurunan (inchi)

0.

5. 10. 15. 20. 25. 30. 35. 40

0

0.1 0.2 0.3 0.4 0.5 0.6

Penurunan (inchi)

Beb

an (

(54)

Pemeriksaan

California Bearing Ratio(soaked)

Pemeriksa

an CBR tanah asli

{90%

γ

dry maksimum

(kadar air 34.5 %)}

Tabel

Penurunan

Samp 1

Sampel 2

3. 48 Hitungan nilai CBR

soaked

el

0.1”(inchi) 11.8/ ( 3 x 1000 ) x 100%= 0.393 % 13 / ( 3 x 1000 ) x 100%= 0.434 %

0.2 “(inchi) 22 / ( 3

x 1500 ) x 100%= 0.488%

22.8 /

( 3 x 15

00 ) x 100%

= 0.507 %

Tabel 3. 49 Pemeriksaan berat isi kering

Sampel 1

Sampel 2

BERAT ISI Sebelum Sesudah Sebelum Sesudah

A BERAT AKAN CET 7596 7596 7536 7536

B B. TANAH + CETAKAN 11374 12485 10226 11159

C B. TANAH BASAH(B-A) 3778 4889 3226 4159

D VOLUME CETAKAN 2279.03 2284.42 2279.028 2289.766

R BERAT ISI TANAH 1.66 2.14 1.416 1.816

F BERAT ISI KERING 1.40 1.43 1.011 1.071

Tabel 3. 50 Pemeriksaan kadar air

Sampel 1

Sampel 2

KADAR AIR Sebelum Sesudah Sebelum Sesudah

G NOMOR TIN BOX 12 12 4 4

H BERAT TIN BOX 7 7 7 7

I B. TIN BOX+TANAH BASAH 45 37 35 46

J B.TIN BOX+TANAH KERING 39 27 27 30

K BERAT TANAH KERING 32 20 20 23

L BERAT AIR (I-J) 6 10 8 16

(55)

I II

A Volume sebelum dioven (ml) 8.9 8.3

B Volume setelah dioven (ml) 7.3 6.8

C Tinggi mula-mula (Ho) (cm) 2 2

D Tinggi awal (cm) 1.640 1.639

E Tinggi awal rata-rata (cm) 1.640 1.640

F Penurunan perlu (cm) 0.360 0.360

Tabel 4. 2. Pembacaan dial dan perhitungan persentase mengembang (

swelling

)

Kode Menit

sampel I

sampel II

0.1 2 1

0.2 3 2

0.5 5 4

1 7 6

2 15 15

4 28 45

8 37 56

15 51 68

30 93 85

60 140 120

240 250 232

1440

329 370

G 2880 200 98

H seting dial 0 0

I perubahan tinggu 0.2 0.098

J pengembangan 12.199 5.977

(56)

luas 29.709 32.169

berat jenis 3.789 3.789

tinggi awal 1.640 1.640

pengembangan 0.2 0.098

Ht 0.711 0.689

e awal 1.307 1.379

Ho 1.840 1.738

Sampel 1

Tabel 4. 4. Pembacaan dial uji tekanan mengembang (

swelling pressure

)

Pembacaan Dial (10

-2

) mm

Waktu

1.5 3 6 12 24

0.1 850 634 443 339 212

0.2 830 616 433 324 199

0.5 811 598 424 309 189

1 788 579 414 297 177

2 764 564 407 286 166

4 741 550 400 274 156

8 718 535 393 262 145

15 695 517 386 252 134

30 674 498 378 243 122

60 651 480 370 231 112

1440 640 462 364 222 102

Setting Dial 850 640 462 364 222

Penurunan (

Δ

S)

210 178 98 142 120

Tabel 4. 5. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

Δ

e

0

0.466 0.108 0.152 1.588 1.436

0.933 0.12 0.169 1.588 1.420

1.865 0.14 0.197 1.588 1.391

3.730 0.17 0.239 1.588 1.349

(57)

0.1 327 279 231 185 138

0.2 323 275 228 180 135

0.5 319 271 224 178 131

1 314 269 221 174 127

2 310 266 218 171 123

4 307 262 214 167 119

8 303 260 210 163 115

15 300 257 206 160 111

30 297 252 203 156 107

60 293 248 200 152 104

1440 289 244 197 149 99

Setting Dial 330 289 244 197 149

Penurunan (

Δ

S)

41 45 47 48 50

Tabel 4. 7. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.086 0.126 1.521 1.395

0.933 0.097 0.142 1.521 1.379

1.865 0.108 0.159 1.521 1.363

3.730 0.14 0.206 1.521 1.316

7.461 0.18 0.264 1.521 1.257

90% kering

1.00 1.10 1.20 1.30 1.40 1.50

0.1 1.0 10.0

Tekanan (kg/cm2)

A

ngka

por

i

Sampel 1 Sampel 2

Sampel 1 = 6 Sampel 2 = 1.5

(58)

Keterangan Sampel I

Sampel II

A Volume sebelum dioven (ml) 7.2 8.2

B Volume setelah dioven (ml) 6.5 7.4

C Tinggi mula-mula (Ho) (cm) 2 2

D Tinggi awal (cm) 1.806 1.805

E Tinggi awal rata-rata (cm) 1.805 1.805

F Penurunan perlu (cm) 0.195 0.195

Tabel 4. 9. Pembacaan dial dan perhitungan persentase mengembang (

swelling

)

Kode Menit

sampel I

sampel II

0.1 0.4 1

0.2 0.9 1.3

0.5 1.3 2.4

1 4 5

2 8 10

4 12 15

8 20 35

15 31 46

30 49 57

60 78 89

240 135 169

1440

213 220

G 2880 142 140

H setting dial 0 0

I perubahan tinggi 0.142 0.14

J pengembangan 7.866 7.755

(59)

luas 31.142 31.169

berat jenis 3.789 3.789

tinggi awal 1.805 1.805

pengembangan 0.127 0.129

Ht 0.695 0.686

e awal 1.598 1.632

Ho 1.932 1.934

Sampel 1

Tabel 4. 11. Pembacaan dial uji tekanan mengembang (

swelling pressure

)

Pembacaan Dial (10

-2

) mm

Waktu

1.5 3 6 12 24

0.1 679 562 416 326 198

0.2 666 547 407 315 189

0.5 654 533 400 307 180

1 643 519 392 294 171

2 631 505 385 281 163

4 621 493 377 268 151

8 611 478 369 255 141

15 602 466 361 243 131

30 594 454 354 230 122

60 585 442 347 219 113

1440 576 429 340 208 104

Setting Dial 700 576 429 340 208

Penurunan (

Δ

S)

124 147 89 132 104

Tabel 4. 12. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

Δ

e

0

0.466 0.121 0.174 1.802 1.628

0.933 0.128 0.184 1.802 1.618

1.865 0.134 0.193 1.802 1.609

3.730 0.145 0.209 1.802 1.593

(60)

0.1 389 346 311 266 230

0.2 383 342 307 262 227

0.5 380 340 304 260 224

1 376 337 300 257 221

2 373 335 297 254 218

4 369 332 292 252 216

8 367 330 289 248 214

15 364 328 286 246 213

30 361 325 282 245 210

60 359 323 280 242 208

1440 576 429 340 208 104

Setting Dial 700 576 429 340 208

Penurunan (

Δ

S)

124 147 89 132 104

Tabel 4. 14. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.12 0.183 1.836 1.653

0.933 0.126 0.192 1.836 1.644

1.865 0.13 0.198 1.836 1.638

3.730 0.135 0.206 1.836 1.630

7.461 0.14 0.213 1.836 1.623

95 % kering

1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64 1.65 1.66

0.1 1.0 10.0

Tekanan (kg/cm2)

A

n

g

ka p

o

ri

Sampel 1 Sampel 2

Sampel 1 = 2.8 Sampel 2 = 2.8

(61)

I II

A Volume sebelum dioven (ml) 7.6 8

B Volume setelah dioven (ml) 6.4 7.3

C Tinggi mula-mula (Ho) (cm) 2 2

D Tinggi awal (cm) 1.684 1.825

E Tinggi awal rata-rata (cm) 1.755 1.755

F Penurunan perlu (cm) 0.245 0.245

Tabel 4. 16. Pembacaan dial dan perhitungan persentase mengembang (

swelling

)

Kode Menit

sampel I

sampel II

0.1 0.2 0.1

0.2 0.4 0.3

0.5 0.9 0.9

1 1 3

2 2.3 5

4 9 30

8 25 42

15 31 48

30 34 56

60 72 79

240 98 98

1440

107 111

G 2880 120 125

H seting dial 0

I perubahan tinggu 0.12 0.125

J pengembangan 6.839 7.124

(62)

berat jenis 3.789 3.789

tinggi awal 1.755 1.755

pengembangan 0.12 0.125

Ht 0.673 0.678

e awal 1.608 1.588

Ho 1.875 1.880

Sampel 1

Tabel 4. 18. Pembacaan dial uji tekanan mengembang (

swelling pressure

)

Pembacaan Dial (10

-2

) mm

Waktu

1.5 3 6 12 24

0.1 700 589 470 345 226

0.2 650 583 462 337 218

0.5 649 577 456 330 210

1 653 572 447 324 200

2 643 565 440 318 192

4 638 539 432 310 186

8 630 531 424 301 179

15 623 524 417 292 170

30 615 516 409 285 163

60 609 508 400 278 154

1440 602 495 375 270 145

Setting Dial 700 602 495 375 270

Penurunan (

Δ

S)

98 107 120 105 125

Tabel 4. 19. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.098 0.146 1.786 1.641

0.933 0.107 0.159 1.786 1.628

1.865 0.12 0.178 1.786 1.608

3.730 0.13 0.193 1.786 1.593

(63)

0.1 899 680 601 486 409

0.2 897 743 592 477 396

0.5 894 736 584 473 388

1 890 730 574 469 385

2 887 724 568 462 373

4 885 719 560 455 366

8 882 705 552 458 362

15 789 697 545 450 356

30 786 686 539 441 348

60 782 659 530 433 340

1440 778 649 515 425 326

Setting Dial 900 778 649 515 425

Penurunan (

Δ

S)

122 129 134 90 99

Tabel 4. 21. Perhitungan angka pori dari tekanan mengembang (

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.117 0.173 1.772 1.600

0.933 0.121 0.178 1.772 1.594

1.865 0.127 0.187 1.772 1.585

3.730 0.132 0.195 1.772 1.578

7.461 0.145 0.214 1.772 1.558

Optimum

1.54 1.56 1.58 1.60 1.62 1.64 1.66

0.1 1.0 10.0

Tekanan (kg/cm2)

A

n

g

ka p

o

ri

Sampel 1 Sampel 2

Sampel 1 = 1.9 Sampel 2 = 1.7

(64)

I II

A Volume sebelum dioven (ml) 8.3 8

B Volume setelah dioven (ml) 6.4 7.3

C Tinggi mula-mula (Ho) (cm) 2 2

D Tinggi awal (cm) 1.542 1.825

E Tinggi awal rata-rata (cm) 1.684 1.684

F Penurunan perlu (cm) 0.316 0.316

Tabel 4. 23. Pembacaan dial dan perhitungan persentase mengembang (

swelling

)

Kode Menit

sampel I

sampel II

0.1 0.4 0.5

0.2 0.9 0.9

0.5 1.1 1

1 2 1.25

2 3 3

4 8 7

8 18 20

15 37 36

30 62 60

60 85 80

240 134 120

1440

200 192

G 2880 115 110

H seting dial 0 0

I perubahan tinggu 0.115 0.11

J pengembangan 6.831 6.534

(65)

luas 32.169 32.169

berat jenis 3.789 3.789

tinggi awal 1.684 1.684

pengembangan 0.115 0.11

Ht 0.673 0.665

e awal 1.503 1.533

Ho 1.799 1.794

Sampel 1

Tabel 4. 25. Pembacaan dial uji tekanan mengembang (

swelling pressure

)

Pembacaan Dial (10

-2

) mm

Waktu

1.5 3 6 12 24

0.1 700 501 376 251 154

0.2 679 484 365 242 147

0.5 660 469 354 233 140

1 635 454 346 225 133

2 613 439 336 217 127

4 591 425 324 209 120

8 584 411 312 200 112

15 575 396 301 192 104

30 565 382 290 183 95

60 554 371 279 175 88

1440 540 389 266 167 80

Setting Dial 700 540 389 266 167

Penurunan (

Δ

S)

160 151 123 99 87

Tabel 4. 26. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.087 0.098 1.673 1.575

0.933 0.099 0.112 1.673 1.562

1.865 0.123 0.139 1.673 1.535

3.730 0.151 0.170 1.673 1.503

(66)

0.1 676 573 409 232 118

0.2 667 565 394 220 109

0.5 658 553 380 209 99

1 650 541 365 199 89

2 641 529 350 190 80

4 634 516 336 179 71

8 625 502 322 170 62

15 616 488 310 160 53

30 608 474 297 149 43

60 599 459 284 138 34

1440 590 436 270 128 25

Setting Dial 700 590 436 270 128

Penurunan (

Δ

S)

110 154 166 142 103

Tabel 4. 28. Perhitungan angka pori dari tekanan mengembang(

swelling pressure

)

Tekanan (kg/cm2)

Penurunan

(

Δ

S)

Ae =

Ht

S

Δ

Eo =

t t

H

H

H

0

e' =

e

0

Δ

e

0.466 0.103 0.107 1.699 1.592

0.933 0.11 0.114 1.699 1.585

1.865 0.142 0.147 1.699 1.552

3.730 0.154 0.160 1.699 1.539

7.461 0.166 0.172 1.699 1.527

95 % Basah

1.48 1.50 1.52 1.54 1.56 1.58 1.60

0.1 1.0 10.0

Tekanan (kg/cm2)

A

n

gka p

o

ri

Sampel 1 Sampel 2

Sampel 1 = 4 Sampel 2 = 6

(67)

Ke

Gambar

Gambar 1.4. Grafik AASHTO
Tabel 1.8 Pemeriksaan hidrometer Sampel I
Tabel 1.9 Pemeriksaan hidrometer Sampel II
Tabel 1.10 Pemeriksaan hidrometer Sampel III
+7

Referensi

Dokumen terkait

Menyatakan dengan sesungguhnya bahwa skripsi berjudul “ Analisis Determinan Pelaporan Keuangan di Internet oleh Pemerintah Daerah di Indonesia (Studi pada Pulau Jawa)” adalah

“ PENENTUAN KONFIGURASI SENSOR TANAH LONGSOR BERBASIS FIBER OPTIK KACA MODEL GABUNGAN BEBERAPA TITIK TARIK “ adalah hasil kerja saya dan sepengetahuan saya hingga

Perdana Perkasa Elastindo (PERSAELS) kota Bandung yang terdiri dari keinginan untuk memperlihatkan prestasi kerja yang baik, pengharapan atas penghargaan dari

Tujuan dari Proyek Akhir ini adalah membuat sistem hidrolik berupa Miniatur Lengan Eskavator pada bagian boom.. Pembuatan Miniatur Lengan Eskavator ini

· Menggeser plat persegi rangka atas pada jarak yang sesuai pada gambar desain, kemudian mengelas sepanjang bidang luar dari plat. · Mengelas mur 17 mm pada box tiang

adalah jenis penelitian yaitu deskriptif dengan pendekatan cross sectional,. dan subjek penelitian yang digunakan adalah ibu

Penelitian ini menunjukkan bahwa daerah di Provinsi Aceh yang mengalami kebakaran hutan terparah pada periode 2008-2013 dengan jumlah hotspot tertinggi terdeteksi pada Kabupaten

Metode yang dikembangkan dalam pembinaan karakter dapat disimpulkan bahwa Pondok Pesantren Darul Falah melakukan metodenya tersebut melaui beberapa tahapan yaitu