• Tidak ada hasil yang ditemukan

BEBERAPA KASUS DI NAD

N/A
N/A
Protected

Academic year: 2019

Membagikan "BEBERAPA KASUS DI NAD"

Copied!
59
0
0

Teks penuh

(1)

APLIKASI WETLAND

(2)

PREFERRED COMMUNITY-BASED

SANITATION OPTIONS

Simplified Community

Sewerage

Shared Septic Tank

(3)
(4)

KONSTRUKSI WETLAND

Reaktor terbagi 3

kompartemen:

zona inlet,

(5)

MODIFIKASI MEDIA

Pengolahan Limbah Cair Domestik (Grey Water):

PUSDA Kota Surabaya

Æ

di lapangan

Media Arang

(daya sorpsi)

&

(6)

Pengolahan Limbah Cair Domestik (Grey

Water): PUSDA Kota Surabaya

Æ

di lapangan

0

Cattail (atas)

&

(7)

MODIFIKASI ALIRAN DENGAN PENAMBAHAN SEKAT

(8)
(9)

Panduan Desain Constructed Wetland

Tipe sistem

Paramater desain

Unit

FWS SFS

Waktu ditensi hidraulis

Kedalaman basin

Laju beban BOD

5

Laju beban hidarulis

Spesifik Area

(10)

CONTOH KASUS KONDISI LINGKUNGAN

• RAWA

(11)

DESIGN APROACH

• Sistem kedap air

• Relatif lebih murah

– Kamar mandi dan toilet:

Rp. 9.750.000

– Sistem Septik :

Rp. 2.700.000

• Mudah diinstal

(12)
(13)

KONDISI DI LAPANGAN

• Material berkualitas rendah (cincin, kerikil,pasir, dll)

• Pekerja yang kurang terlatih

Æ

pengawasan semakin sulit

(14)

KONDISI DI LAPANGAN (2)

•Muka air tanah tinggi

(15)

PEMBELAJARAN YANG TIMBUL

• Diperlukan kualitas material yang baik dan metoda

konstruksi yang baik pula untuk membangun sistem

sanitasi ini.

• Perlu waktu untuk melatih warga tentang arti

pentingnya sistem ini. (Community Mobilizer dan

Hygine promotion)

(16)

1. Waste Water Treatment Garden (Wetland)

2. Drinking water supply SALSABIL

Primary pipe Ø 6" Secondary pipe Ø 4" - 3"

Septic tank

133 Rumah yang belum

terkoneksi

Pagar BRC Pagar kawat bronjong

KETERANGAN :

Peta Daerah yang Dilayani

(17)

PILOT SANITATION

Konstruksi Wetland : Beton Bertulang

Jumlah Rumah yang Dilayani : 18 Rumah

Pipa Pengumpul : PVC AW.A

Ø

4

; Panjang

±

500 M

Bak Kontrol 9 unit

Media Wetland : Limestone, Kerikil, dan Pasir Ikat

Tanaman : Akar Wangi dan bunga

bunga

(18)

Aspek Teknis pada Konstruksi:

• Slope / kemiringan permukaan tanah

• Pemasangan pipa

Operation and Maintenance (O&M):

o

Pengurasan lumpur

(19)

LESSONS LEARNT

• Need good quality of material, combined with

good construction method

• Take time to train people, about system,

function. (Community mobiliser involved)

(20)
(21)
(22)

ANNEX 3

(23)

SARANA SANITASI UMUM (MCK)

(24)

Latar Belakang

• Desa Mun Bungo – Lamkruet, adalah desa yang terkena tsunami, rumah untuk warga disediakan oleh Atlas logistic, lengkap dengan system sanitasi individu . tangki septic + 2nd treatment dengan kontruksi wetland

• Masyarakat (terutama ibu ibu) masih menggunakan MCK umum untuk mandi, cuci dan kakus pada pagi dan sore !!.

Mengapa ?

Dari beberapa FGD tentang hal itu, didapat kesimpulan :

Ibu ibu biasa bertemu dan berkomunikasi pada saat Mandi dan Cuci bersama

KM + WC pribadi dianggap kurang luas untuk mandi dan cuci, karena mereka biasa mandi dan mencuci di ruang terbuka

Mereka biasa buang hajat (ke WC) dalam kurun waktu mencuci dan mandi tersebut

Apa yang harus dilakukan ?

• Sosialisasi , promosi, penyadaran/kampanye sehingga mereka terbiasa dan mau menggunakan WC pribadi ( butuh waktu !!) • Mengalihkan sarana komunikasi mereka dari tempat Mandi Cuci

ke alternative lain (butuh waktu !!)

• Menyediakan MCK(rehab) sebagai sarana antara / transisi, dan membangun unit pengolahan limbahnya (IPAL)

(25)
(26)

SARANA SANITASI UMUM (MCK) DI MUNBUNGO-LAMKRUET

ACEH BESAR

Primary Treatment

4 Unit tangki dari cincin

dengan dinding dan dasar

kedap air

Secondary Treatment

2 Unit Up Flow Filter dari

cincin dengan dinding dan

dasar kedap air

Wetland dengan dinding

pasangan bata dan dasar

dari plastic (

memanfaatkan tanah

kosong)

Bahan Utama = Cincin

(27)

Material Utama : CINCIN ?

• Biasa digunakan oleh masyarakat untuk

tangki septic ?

• Kontruksi lebih murah (?) dan lebih cepat dibandingkan dengan pasangan fiber, plastik, bata atau beton

• Memungkinkan dipasang pada daerah dengan muka air tanah tinggi, karena dasar cincin + dinding bisa dibuat sebelumnya

• Cukup berat, sehingga tidak terangkat oleh tekanan air tanah

2nd Treatment : Up-Flow Filter ?

• Mudah dalam perawatan (jika terjadi penyumbatan / clogging)

• BOD removal (teoritis) sekitar 80%

• Kontruksi bisa dibuat dari bahan setempat • Banyak pilihan bahan untuk media filter

(batu, bola plastic, dll)

(28)

Penempatan IPAL dan MCK

Lokasi yang rendah Topografinya dibanding dengan rumah penduduk

Bagaimana Jika MCK sudah tidak digunakan ?

IPAL digunakan untuk menampung air limbah dari rumah rumah dengan system

perpipaan ( small sewerage system)

(29)

Kota yang sudah mengadopsi pemakaian Up-Flow Filter

(legal / peraturan) ?

DKI Jakarta (soft copy file peraturan ada)

(30)

CARE Sanitation Model

Septic

Tank

Control

Box

Wetland

Banana Circle

Black

Water

(31)

CARE Wetland System

Wetland

Banana Circle

Secondary

Treatment

(32)

Fiberglass Wetland

• Fiber Tanks are being used where there is

a problem of high water table

• Two sizes are used depending on the

available land- 2.0 meters, 3.0 meters

(33)

Fiberglass Wetland 3000 L &

2000 L

Pre-fabricated

Its water tight

Locally Made (Aceh)

Cost of Tank: Rp 2.5 m

& Rp. 1.75 m.

Installation Cost:

Rp.450,000

Large Tank, Less

durable

(34)

Common Advantages

Ready and Easy to install

• Fastest installation time- it just takes 6

hours (If the pit is ready!!)

• Waterproof almost guaranteed

• Can be made according to required

specifications

(35)

Common Problems

• Can be damaged in transport

(36)

How to Install

• Digging of appropriate size pit

• A minimum of 15 cm of sand bedding

• The pit should be free of rocks/ stones

• Place the tank in the pit, allowing 2% slope from

black water outlet

• Fill the tank with water, backfill the pit and

Compacted

• Area around the tank to be backfilled and edge

around the tank need covered by bricks to

(37)

Factors influencing the selection

of the Location for Septic Tank

Installation

• Availability of land

• Shape of the available land

• Availability of drainage

• Location of shallow water well

• House owners preferences

(38)
(39)
(40)

Vegetated

Leachfields for

Secondary

(41)
(42)
(43)
(44)
(45)
(46)

Split distribution

pipe, long

leachfield

(47)

Split distribution pipe

(48)

Blang Krueng

septic tanks

(49)

Do’s

and

Don’ts

for Leachfields

don’t

use palm fiber (ijuk)

don’t

put soil in leachfields

leachfields

don’t

need slope

do

take care with perforated pipe

do

provide an overflow in case of flooding

do

protect leachfields from overland flows

(50)
(51)
(52)

P Trap

grey water

stops

smells

coming into

house and

traps some

(53)

Menyerapan dengan tanaman tanaman

Untuk dimana air tanah sangat tinggi

10m x 60-100cm x 75cm dalam

(54)

Generic Treatment System

Sewage and Wastewater

2 chamber concrete septic tank + vegetated leachfield on boundary

2 plastic septic tanks + vegetated leachfield

Ideally, a reconstruction house with a 2 chamber

septic tank, or 2 plastic septic tanks, will have a vegetated leachfield of 10sq/m*

(55)

PLANTS FOR LEACHFIELDS

In the tropics it is the plants that store and cycle nutrients. The

only way to strip nutrients from wastewater in this environment, is

to use fast growing plants. It is relevant that plants have the ability

to strip nitrogen from wastewater – because they bring oxygen

down to their roots.

Un

vegetated leachfields will not function in this warm, moist

environment. Without plants to keep the pores open, unvegetated

leachfields will clog.

The question of which plants to use is not just about the species

which best process wastes. It is about what is acceptable to

beneficiaries. Locals see wetland plants - reeds, rushes and

cattails - as invasive weeds, and will not allow them into their

(56)

PLANTS

(57)

AIR

Banana Vetiver Grass Papaya

FAQs VEGETATED LEACHFIELDS

(58)

Leachfields in small spaces

(59)

Need for Workplace Training

Installing leachfields is the

best way to gain experience

Contractors require training

Referensi

Dokumen terkait

“Sekarang Sistem Manajemen Kinerja kita, beralih menjadi berdasarkan kinerja (hasil kerja) individu sesuai sasaran kerja individu yang selaras dengan sasaran kerja

Menurut pasal 2 ayat (1) Undang-undang Kepailitan dan PKPU di atas, supaya pasal 1131 dan 1132 KUHP berlaku sebagai jaminan pelunasan utang Kreditur, maka pernyataan pailit

1) Mengujikan soal pilihan ganda berdasarkan hasil uji coba yang telah diperbaiki kesalahan-kesalahan yang terdapat di dalamnya kepada siswa kelas VII C untuk

Jika kuitansi sudah langsung diserahkan sekalian dengan invoice dan faktur pajak, maka dari bagian keuangan mengeluarkan tanda terima atas penye rahan kwitansi dan

Eksperimen mengenai kekuatan pelet maupun briket bijih besi berbinder organik dan inorganik telah banyak dilakukan, namun pengaruh binder terhadap sifat metalurgis

Radon adalah unsur Gas Mulia yang paling stabil karena jari-jari atomnya paling besar.. Argon adalah unsur Gas Mulia yang paling mudah bereaksi dengan

pengaruh secara simultan antara variabel persepsi nilai yang terdiri dari keterlibatan, loyalitas merek, persepsi harga, persepsi kualitas, pengenalan dan persepsi

Jadi simpulannya adalah dari ketujuh puisi yang terdapat pada buku paket “Inilah Bahasa Indonesiaku” semuanya terdapat nilai pendidikan dan hal ini sangat aik