SCOPE OF THE CERTIFICATION ASSESSMENT
Organization Information
Type of Assessment .1
Locations of Mill, Plantations and Area Statement .1 Location of Mill
Description of Area Statement .1 Tenure
The planting year age profile consists of FELDA core estate, FELDA managed smallholders and self-managed smallholders.
Description of Supply Base .1 Description of Mill
SPO – 4006a.5 Page 15 Prepared by Mutuagung Lestari for TERSANG POM – Felda Global Ventures Plantations (FELDA). small hodlers RSPO Non Certified Dealer Independent Small hodlers. Expected FFBs consist of FELFA core estates and smallholders managed by FELDA/FTP (including own managing smallholders).
Other Certifications
Time Bound Plan
The aim is for all farmers supplying the TERSANG palm oil mill to meet the RSPO certifiable standard within three years of the mill being certified.
Assessment Team
YAP CHIN HUNG
MOHD HAIRIMI MOHD ALI
MOHD NIZAM ABU BAKAR
Assessment Methodology, Assessment Process and Locations of Assessment .1 Figure of person days to implement assessment
- Locations of Assessment
ST-2 Number of units in this certification activity are eight estates which supply the raw material (FFB) to a palm oil mill. In conducting the assessment, the team of auditors used the 0.8√y formula to determine which management units to focus on and also considered the issues raised by stakeholders. Based on this formula, the team of auditors determined that the sampling sites are one palm oil mill (Tersang POM) and three estates (FELDA Tersang-4 Estate, FELDASungai Koyan-2 Estate and FELDA Sungai Koyan-3 Estate).
Estate
Stakeholder Consultation and List of Stakeholders Contacted .1 Summary of stakeholder consultation process
Interview with representatives of local settlers of Tersang 1, Tersang 2, Tersang 3, Tersang 4 Sungai Koyan 1, Sungai Koyan 2, and Sungai Koyan 3 on 13 May 2015. The minutes from those public consultations have been clarified by Felda Global Ventures – FELDA and are included in this ST-2 initial report.
Determining Next Visiting
ASSESSMENT RESULT
Summary of Assessment Report of the RSPO Certification
He had responded well, as shown by the printout of the e-kilang application (Penyata Bulanan Kilang Buah – MPOB (EL) MF 4 of Kilang Kelapa Sawit Tersang) submitted on 5 May 2015 through the online e-kilang system (www. Documents of management documents are publicly available, except when prevented by commercial confidentiality or when disclosure of the information would result in negative environmental or social outcomes Relevant management documents are publicly available, except when prevented by commercial confidentiality or when disclosure of the information would result in negative environmental or social outcomes.
Records of all these management documents are available and well maintained at the office of each estate. Three-monthly report on effluent quality to the relevant government institution - Accident report to the local labor office.
Growers and millers commit to ethical conduct in all business operations and transactions
Based on the scene assessment, interviews and inspection of evidence at the property, there was evidence of compliance with laws, regulations, local and international laws related to palm oil operations. To ensure compliance with the regulation, there is also a list of currently active operators with their certification status. The legal boundaries for the Tersang Complex area are well defined as seen in the field survey at Tersang 4, Koyan 3 and Koyan 2.
There is a documented procedure ML-1A/L2-PR 12 (0) dated March 2012 for handling and answering legal questions and customary rights and for calculating and distributing compensation. Referring to public consultation and management interviews, there is no evidence that the palm oil operations have instigated violence to maintain peace and order in their current and planned operations. The lands at Tersang 4, Sungai Koyan 2 & 3 are legally leased by Felda / FGVPM from the Pahang State Government as evidenced by signed agreement with the right to develop it for oil palm plantations or agricultural use.
Therefore, the Tersang and Sungai Koyan estates do not diminish the legal, customary or user rights of other users without their free, prior and informed consent. There is an implemented management plan aimed at achieving long-term economic and financial viability. According to the hectare state and planting year map, the second cycle of plantation (replanting) was completed in the year 2014 for Tersang 04, in the year 1997 for Sungai Koyan 02 and in the year 2002 for Sungai Koyan 03.
There is no replanting program within the next 10 years in the estate of Tersang and Sungai Koyan.
Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield
There was an occupational health and safety policy covering all activities in factories and estates. SPO – 4006a.5 Page 30 Prepared by Mutuagung Lestari for TERSANG POM – Felda Global Ventures Plantations (FELDA) . area). Complaints, non-conformance, incident investigation and corrective action procedure followed describing emergency handling for factories and estates.
Accident records for mills and estates assessed and found detailed investigations in place along with corrective actions. Fire drill training conducted at mills and estates to improve staff and worker awareness. It is recommended to improve the performance of fire fighting equipment and the availability of first aid equipment at mills and estates.
At Tersang 04, the training program for the year 2015 was followed with 5 planned training courses, such as: SOP training, safety &. A training program for the year 2015 is being followed at Sungai Koyan 02 estate with sufficient training planned, such as: RSPO training, first aid training, IPM training, PPE training, practical training for occupational safety, training of fire crews, harvesting, fertilization and syringe training. At Sungai Koyan 03, a training program for the year 2015 was followed with sufficient training planned such as: PPE training, practical training for occupational safety, training for fire crews, training for harvesting, fertilizing and spraying, training for handling pesticides, responsible trainer assigned with defined target date.
Summary of significant impact observed with used pesticide and chemical container defined as significant aspect.
The status of rare, threatened or endangered species and other High Conservation Value habitats, if any, that exist in the plantation or that could be affected by plantation or mill management, shall be identified and
There is a communication and consultation document (ML-1A/L2-PR3 (0)) for Tersang POM, Felda Tersang 04, Felda Sg. Based on the audit, a complaint was made to Tersang POM on 05/02/2015 Khairul Salleh regarding facility issues. There is a clear contract between Felda and workers regarding labor laws, union agreements in Bahasa Malaysia for workers and understanding towards workers.
Terdapat kontrak yang jelas antara Felda dan pekerja mengenai undang-undang ketenagakerjaan, perjanjian serikat pekerja dalam Bahasa Malaysia untuk pekerja Felda dan pemahaman tentang pekerja. Ada Equal Opportunity Police yang ditandatangani oleh Mohammed Emir Mavani Abdullah CEO FGV di POM Tersang, dan Felda Tersang 04, Felda Sg. Terdapat kebijakan untuk mencegah pelecehan dan kekerasan seksual (Kebijakan pelecehan dan kekerasan seksual dan hak atas kebebasan reproduksi ditandatangani oleh Mohamed Emir Mavani Abdullah di Tersang POM dan di Felda Tersang 04, Felda Sg.
Based on the audit, there is a contractual document between the contractual document between Tersang POM and Kasim bin Tan Contractual document between Felda Tersang 04 with Ibnu Trading Felda Sg. Based on interviews with foreign workers, there is no forced labor used in POM and the estate all workers have work permits. Based on interviews with foreign workers, there is no forced labor used at Felda Kemahang Empat, all workers have a permit.
There is a clear policy regarding the no contract replacement for FGV in ("Polisi Pengama Pekerja Asing") signed by FGV CEO on 0/06/2014.
Extensive planting on steep terrain, and/or on marginal and fragile soils, is avoided
Expansion of the river buffer zone to 5 meters in 2016 - Separation of organic and non-organic waste in 2016 - Reduction of the use of paraquats.
Summary of Assessment Report of Supply Chain
There is a procedure for SCCS implementation in the Tersang document: FGVPM – RSPO SCCS dated December 1, 2012 regarding SOP Perkilangan unutk Pematuhan Sistem Persijilan RSPO SCCS. The site must have documented procedures for receiving and processing certified and non-certified FFBs. The site has encoded a procedure for SCCS implementation in a document: FGVPM – RSPO SCCS dated December 1, 2012 regarding SOP Perkilangan for Pematuhan System Persijilan RSPO SCCS.
The site must verify and document the quantities of certified and non-certified FFBs received. The Tersang mill had a process of verifying the quantities of certified and non-certified FFBs received in the following document: FGVPM – RSPO SCCS dated 1 December 2012 in relation to the SOP “Perkilangan untuk Pematuhan Sistem Persijilan RSPO SCCS”. The location shall immediately notify the CB if there is an anticipated overproduction of the certified tonnage.
The actual amount of certified CPO still needs to be verified in the initial phase and will be verified during an interim audit. The site will record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO and PK on a quarterly basis. The site has encoded a procedure for SCCS implementation in a document: FGVPM – RSPO SCCS dated December 1, 2012 regarding SOP Perkilangan for Pematuhan System Persijilan RSPO SCCS.
The SOP including recording and balancing all receipts of certified FFB and deliveries of CSPO in CPK.
Conformity Checklist of Certificate and Logo Use
Evidence of permission or approval certificate and logo from Certification Body which
Implementation of certificate and logo used by Client comply with size and type (shape)
- Summary of RSPO Partial Certification
- There is compliance with all applicable local, national and ratified international laws and
- The right to use the land can be demonstrated, and is not legitimately contested by local
- There is a mutually agreed and documented system for dealing with complaints and
- Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous peoples, local communities and
- New plantings since November 2005, have not replaced primary forest or any area required to
- No new plantings are established on local peoples’ land without their free, prior and informed consent, dealt with through a documented system that enables indigenous peoples, local
- Local people are compensated for any agreed land acquisitions and relinquishment of rights,
- Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components
- Identification of Findings, Corrective Actions and Observations at ST2 Assessment CAR
- Opportunity for Improvement
- Noteworthy Positive Components
- Summary of Arising Issues from Public, Management and Auditor Response Public Issues
- CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY
As of early 2014, Felda Global Ventures Plantations (FGVP), owns and manages 72 palm oil mills in Malaysia. There is also "Perjanjian Bersama Kesatuan Perkerja-perkerja Felda Plantations" and "Surat Perjanjian Kontrak Perkerjaan Perkerja Asing", which are used to educate and inform employees about their rights and responsibilities. For example: PSQM monitors HR related issues with the help of the internal audit team and reviewed by the PSQM Head of Department.
Lack of awareness among workers and enforcement of compliance with relevant rules for immediate corrections. Issue a warning letter to the involved workers who did not observe the use of personal protective equipment. The collection of information for the GHG assessment is done according to the parameters required in the mill and the property.
Provide data to assess the effects of calculating greenhouse gas emissions per mill and property. The collection of information for the assessment of greenhouse gases is carried out according to the necessary parameters. 6 Minor 4.2.4 It is recommended that the EFB application is properly recorded in the Tersang 4 file and topographic map.
8 Minor 5.3.3 It is recommended to improve the pesticide container flushing setting and household waste dump control for Tersang 04 and Sungai Koyan 03. Felda management thanks them with the compliment and will maintain their relationship with the settlers while maintaining a good response with them. SPO – 4006a.5 Page 57 Prepared by Mutuagung Lestari for TERSANG POM – Felda Global Ventures Plantations (FELDA). Institution/NGO/Community) Management Responses Auditor Responses.
List of Stakeholder Contacted in the RSPO Certification Process
Assessment Program