• Tidak ada hasil yang ditemukan

: Gunung Aru Palm Oil Mill, PT Bersama Sejahtera Sakti subsidiary of Sime Darby Plantation Sdn Bhd

N/A
N/A
Protected

Academic year: 2024

Membagikan ": Gunung Aru Palm Oil Mill, PT Bersama Sejahtera Sakti subsidiary of Sime Darby Plantation Sdn Bhd"

Copied!
76
0
0

Teks penuh

Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 5 Disiapkan oleh Mutuagung Lestari untuk AMDAL PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation): Analisa Dampak Sosial dan Lingkungan.

Time Bound Plan

SPO – 4006a.7 Pagina 11 Opgesteld door Mutuagung Lestari voor Gunung Aru POM – PT Bersama Sejahtera Sakti (plantage Sime Darby). SPO – 4006a.7 Pagina 12 Opgesteld door Mutuagung Lestari voor Gunung Aru POM – PT Bersama Sejahtera Sakti (plantage Sime Darby).

Table  2009  Certified
Table 2009 Certified

Assessment Team

Assessment Methodology, Assessment Process and Locations of Assessment .1 Figure of person days to implement assessment

Locations of Assessment

In conducting the assessment, the audit team used the 0.8√y formula to determine the sampling of management units to focus on and also considered issues raised by stakeholders. Based on this formula, the auditor team determined that the sampling sites are one (1) palm oil mill (Gunung Aru Factory) and two (2) estates (Gunung Aru Estate and Gunung Kemasan Estate).

Security Post. Tracing the origin of the fruit and its recording system

Security Gate and Weight Bridges. Observation and interview with security officer and weightbridge operator regarding to FFB receiving and RSPO supply chain prosedure

Chemical Storage. According to the field observation, there were MSDS and hazardous materials symbols as well

  • Stakeholder Consultation and Stakeholders Contacted .1 Summary of stakeholder consultation process
  • Determining Next Assessment
  • ASSESSMENT FINDINGS
  • Summary of Assessment Report of the RSPO Certification
    • Major
    • Minor and 2.2.4 Major
    • and 4.2.2

The company has conducted an analysis of the long-term economic viability for years 2017 to 2022. The company has a semi-detailed land survey and land suitability document for oil palm plantation that includes the land slope map for Gunung Aru Estate and Gunung Kemasan Estate. Based on field visit at Gunung Aru Estate Division III, it is known that the company does manual road maintenance.

The company has a pest and disease control registration for Gunung Aru Estate and Gunung Kemasan Estate. The company has demonstrated pesticide use monitoring at Gunung Aru Estate and Gunung Kemasan Estate. Based on document review and management interview, it is known that the company uses Class IB pesticides such as Racumin (Kumateralil) for rat pest control.

Based on a visit to Gunung Kemasan Estate, it is known that the company provided facilities such as BBS House (Block Spraying System House). Based on interviews with management, it is known that the company does not apply pesticides by air. Based on the field visit at Gunung Aru Estate Section 1 Block A007 on the replanting area, it is known that the company carries out replanting activities without burning.

The company has been registering all activities of pollution or emissions of greenhouse gases.

Major

Bersama Sejahtera Sakti shows the social and environmental impact assessment document in the form of: (1) the main EIA report (1996) which identifies social impacts such as social disturbance, increased local community income and increased community access and (2) the social impact assessment report on wealth management.

Major

Major

Minor

Minor

Major

Minor

Minor

Major and 6.3.2 Major

Based on interviews with harvester in block of A005 GAE known that workers understand the working hours set by the company. Based on document review known, the company paid overtime in accordance with that specified in the "peraturan perusahaan". Based on document review of employee data, the company implemented the policy and no minor workers (workers under 18 years of age) were found.

The company had a social policy approved by the Main Plantation Upstream Indonesia in December 2011. Based on interviews with employees in the field, workers are known to understand the company's equal opportunity employment policy regardless of race, religion, or gender. CH has a commitment to be the company that protects their female workers from sexual harassment actions.

Based on the "peraturan perusahaan" policy document regarding the rights of working women to leave for the menstrual period (H1) and childbirth (H2). The company has ensured the protection of women's rights, for example menstrual rights.

There is no harassment or abuse in the workplace and reproductive rights are protected. The gender policy was legalized by the Head of the Upstream Plantation in Indonesia in April 2011, written in the language understood by the workers (41ahasa). The company has had the form of gender commission structure in each unit (GAE, GKE and GAF).

Based on interview with sprayer operator and fertilizer operator of GKE and GAE, known that the workers had sufficient understanding about sexual harassment policy and gender committee. In the point of 5.2 mentioned that children, pregnant women and breastfeeding are forbidden to work on the works related to chemical. Based on interviews with fertilizer workers and spray workers known that workers are known to the gender committee.

It describes the complaints of permanent workers and staff recorded in the register, the flow chart and diagram of the complaint is also presented. Based on gender committee interviews, fertilizer workers and sprayers knew that there is no sexual harassment and/or abuse in the workplace.

Based on interviews with the contractor, payment was made on time in accordance with the agreement. Based on a review of the employee list documents, the report of work (WLTK) and interviews with workers in the field, it is known that the type of work described in the employment contract is the same as the current position. The workers explained that they are aware that they are performing the work in accordance with what is stated in the contracts with the workers.

Based on documents review of employee list that discloses the regional origin and addresses of employees that there are no migrant workers at PT BSS. Based on the results of an interview with Labor Agency known that the company regularly reported the amount and status of employees through Labor mandatory report (WLTK) and that there are no migrant workers. The company has a policy on human rights issued by SOU Chairman 06 Gunung Aru PT Bersama Sejahtera Sakti Minamas.

Based on interviews with employees at Gunung Aru and Gunung Kemasan Estate, it is known that in addition to the official socialization, socialization related to human rights has also been submitted through the morning briefing. The company has an EIA document, which was legalized by the Ministry of Agriculture in 1996, regarding plantation in 14,000 ha and mill capacity 60 tFFB / hour.

SPO – 4006a.7 Page 43 Prepared by Mutuagung Lestari for Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Plantation). Plantation dated May 1, 2015, which contains the company's commitment to protect the human rights of all staff/employees, including the right to life, marriage and procreation, the right to self-liberty, the right to security, the right to prosperity, the right to participate in government , the rights of women and children. SPO – 4006a.7 Page 44 Prepared by Mutuagung Lestari for Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

While the company, based on the HCV identification made in November 2010, has information on liability and LUCA for planted area period 2007 to 2010 at Pantai Timur Estate. The company has reported all LUCA to the RSPO Secretariat on 28 August 2015 to appear for RSPO remediation and liability for land clearing without prior HCV assessment. The company has Land Survey Detail Report and Land Suitability for Oil Palm Plantation at PT Bersama Sejahtera Sakti, it is known that the company has carried out topographical mapping of the land.

Based on the site visit at Gunung Aru Estate, Division 1 Block A007, it is known that the company has implemented related plantings in the slope area such as terracing, planting of leguminous cover crops (LCC) and EFB application. SPO – 4006a.7 Page 45 Prepared by Mutuagung Lestari for Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

The use of fire in the preparation of new plantings is avoided except in specific situations, as identified in ASEAN guidelines or other regional best practices.

SPO – 4006a.7 Hal 46 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

Summary of Assessment Report of Supply Chain Requirement

The site will have written procedures and/or work instructions to ensure the implementation of all the elements specified in these requirements. Complete and up-to-date procedures covering the implementation of all the elements in these requirements;. The name of the person who has overall responsibility for and authority over the implementation of these requirements and compliance with all applicable requirements.

This person must demonstrate knowledge of site procedures for implementing this standard. The document refers to the RSPO Standard for Supply Chain Certification Final Document dated 21 November 2014. Plant Manager: The plant manager is responsible for the maintenance and storage of all documents, records and notes on the use of raw materials; checking the status of the product with the seller; have appropriate SCCS training.

Production employee: maintaining the administration of the certified FFB receipt and the non-certified one. The site must have documented procedures for receiving and processing certified and non-certified FFBs.

Purchasing and goods in .1

  • Evidence of permission or approval certificate and logo from Certification Body which
  • Implementation of certificate and logo used by Client comply with size and type (shape)
  • Implementation of Certificate and Logo is not used on product
    • Summary of RSPO Partial Certification
    • Un-Certified Units or Holdings
    • Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components
    • Summary of Arising Issues from Public, Management and Auditor Response Interview result with village representative of Tanjung Harapan,

SPO – 4006a.7 Hal 47 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 Hal 48 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 Hal 65 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

SPO – 4006a.7 Hal 66 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 Hal 67 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 Hal 68 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

SPO – 4006a.7 Stran 69 Pripravil Mutuagung Lestari za Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Nasad). SPO – 4006a.7 Stran 70 Pripravil Mutuagung Lestari za Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Nasad). SPO – 4006a.7 Stran 71 Pripravil Mutuagung Lestari za Gunung Aru POM – PT Bersama Sejahtera Sakti (Sime Darby Nasad).

SPO – 4006a.7 Hal 72 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

List of Stakeholder Contacted in the RSPO Certification Process

SPO – 4006a.7 Hal 74 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation). SPO – 4006a.7 Hal 75 Disiapkan oleh Mutuagung Lestari untuk PKS Gunung Aru – PT Bersama Sejahtera Sakti (Sime Darby Plantation).

Assessment Program

Referensi

Dokumen terkait