A STUDY OF DRIVING FACTORS IN A MODEL TRAINING FOR THE ELECTRICITY GENERATION AUTHORITY OF THAILAND (EGAT) IN ACHIEVING THE GLOBAL TOP QUARTILE OF UTILITY: A CASE STUDY OF THE NORTH BANGKOK COMBINED CYCLE POWER PLANT 1. KEY WORDS: Operating System Model Concept/Plant Model/Driving Factors/ Global Enterprise in the top quarter/ Electricity Generating Authority of Thailand 111 pages.
INTRODUCTION
- Research Background and Problem Statement
- Research Objectives
- Research Problem
- Research Contribution
- The New Academic Contribution
- Managerial Implication
- Research Scope
- Research Methodology
- Duration of research interview project
The topic is a study of driving factors in model plant for Electricity Generation Authority of Thailand (EGAT) in achieving Global Top Quartile Utility: A case study of North Bangkok power plant combined cycle unit 1. EGATIF uses IPO sales to invest in the availability income from the operation of the North Bangkok Power Plant combined cycle unit 1.
LITERATURE REVIEW
The Six Box Model of Organization Diagnosis
To organize or plan the responsibility for the employees' tasks and manage the work system in order to be successful in the direction of the goal. Having the best and appropriate technologies to go on the mission of the target.
Learning Organization
Shared vision: Define a common vision of the organization to drive the organization towards the same goal. Team learning: A mutual learning process of the team to successfully create and function from a shared vision of the organization.
Organizational Intelligence Model
The operation requires that all employees get involved in the work and drive their strategic goals of the organization. The organization will be able to perform the tasks efficiently and effectively as possible objectives.
Venn Diagram Before Interview (7 Hypothesis Factors)
The useful mechanisms factor of The Six Box Model of Organization Diagnosis theory has a new factor name set with "Engineering Excellent". The reward factor of The Six Box Model of Organization Diagnosis theory has set a new factor name with "International Recognition".
Venn Diagram After Interview (10 Hypothesis Factors)
Leadership and Reward from the Six-Box Model of Organizational Diagnostic Theory and Leadership from the Organizational Intelligence Theory Model labeled the cofactor with "Leadership (Motivating and Appreciating)". Structure from the Six-Box Model of Organizational Diagnostic Theory and Structure and Decision rights from the Organizational Intelligence Theory Model, naming the cofactor "Financial Structure Model".
Hypothesis Factors Before and After Interview
Customer service Factor is Not Included in Hypothesis of Venn Diagram
It also owns and operates the National Transmission Network, which includes transmission lines and substations of different high voltage levels, covering all parts of the country. The MEA is responsible for the distribution, sales and supply of electric energy services in the provinces of Bangkok Metropolis, Nonthaburi and SamutPrakran, while the PEA serves the rest of the country.
Conceptual Framework
- Leader (Motivating and Assessment) literatures summary grid
- Strategy communication with the same goal literatures summary grid
- Individual positive thinking and willingness mindset literatures summary grid
- Coaching Team & Team working literatures summary grid
- HRD & HRM literatures summary grid
- Engineering Excellent & Continuous Process Improvement Literatures Summary Grid
- IT& KM Database summary grid
- Culture literatures summary grid
- CSR in Process & After Process literatures summary grid
- Financial Structure Model literatures summary grid
- International Recognition literature summary grid
The results of the correlation testing of the identified leadership styles showed: a) significant, positive correlation between transactional leadership and financial performance; The vision must be communicated in such a way that people will want to embrace it. A leader can follow a 4-step process of testing and sharing: 1. Present the vision to the members of the organization. These results will be useful for everyone involved in the design improvements of existing and future power plants.
Improving company performance is closely linked to the application of knowledge management tools that facilitate access to the company's know-how, greater awareness and knowledge of corporate culture and the acquisition of a competitive advantage. The plant will also be equipped with state-of-the-art emissions control systems. combined cycle power plant, fueled by clean natural gas.
Push Factor
Although they have been extensively studied in the marketing and reputation literature, it is still not clear how exactly they work or complement each other. Successful organizations will be those that not only communicate how they look, feel and behave, but also express their values.
Pull Factor
The different things between Push Factor, Pull Factor, Top down and Bottom up
RESEARCH METHODOLOGY
- Use Snowball Sampling method for this research
- Personal Interview Process
- Group of Interviewees
- Validation of Qualitative Interview Design Scoring
- Improve the questionnaire based on specialists’ recommendation
- Question for Interview
- Table of Qualitative Interview design with group of interviewees
- Matching Questions and Conceptual framework
- The processes of analysis
- Link the relationship between Open-Coding, Axial-Coding and The goal of result
- Link the key point and related Information to the theme group of Open-Coding concept, Axial-Coding concept and the goal of result
- Read the note and analyze the key point and related Information
- The Relationship of Open-Coding, Axial-Coding and The Goal of Result from Conceptual Framework
- Table of matching the key point of notes to open coding
- Table of matching the key point of notes to axial coding
- Table of Matching The Key Point of Notes to The Goal of Global Top Quartile
- Theory Triangulation Validation
How do you think about the value of the corporation used to run Unit 1 of the North Bangkok Combined Cycle Power Plant in achieving Global Top Quartile Utility. What are the new maintenance and operation methods that support North Bangkok Combined Cycle Power Plant Unit 1 in achieving Global Top Quartilor Service. What about the mode or structure of the platform used in combined cycle unit 1 of Bangkok North Power Plant.
In your opinion, do you have more suggestions for continuous improvement of the combined cycle unit 1 model plant of North Bangkok Power Plant to achieve the Global Top Quartile Utility? In your opinion, do you have more suggestions for continuous improvement of the combined cycle unit 1 model plant of North Bangkok Power Plant to achieve the Global Top Quartile Utility?
RESULTS
Descriptive Writing of Open-Coding, Axial-Coding and The Goal of Result
EGAT has chosen the North Bangkok Power Plant Combined Cycle as a model power plant because the North Bangkok Power Plant has a high efficiency. The combined cycle unit 1 of the combined cycle unit availability factor of the global top quartile North Bangkok must be equal to or greater than 92.9%. In the line function, everyone in the North Bangkok power plant understands their responsibility and carries it out successfully.
Investors will receive the investment units and gradually pay dividends on the income generated by Unit 1 of the North Bangkok combined cycle power plant. Unit 1 of the North Bangkok combined cycle power plant must have an availability factor for this fund.
The Result: The Working System Model Concept of Model Plant From The Conclusion of Interview
The upper quartile global combined cycle target is for an availability factor (GWEAF) of greater than or equal to 92.9%. The main factors of human and company management are the culture between the employees and the coaching team. The manager encourages the employees and the coaching team to understand and work towards the same goal of the strategy.
The Coaching Team is the key person and is involved in supporting the employee function. Individual positive thinking and willingness mentality and HRD&HRM are involved in the selection process of employee and coaching team to work in model factory.
Descriptive writing of Recommendation
The success model factory concept of North Bangkok Combined Cycle Unit 1 knowledge management process, which can narrow the gap between POF, UOF and UDF, is stored in IT&. The IT& KM database is used to apply for other EGAT power plants that cannot supply electricity to reach the Global Top Quartile Utility. EGATIF Invest in the Availability Factor Yield (GWEAF) of North Bangkok Power Plants Combined Cycle Unit 1, of which EGAT holds 25% of the total investment units sold.
The community is drawn into the process with CSR in process & After process, Next CSR in process &. CSR in process and after process of North Bangkok Power Plant draws the community to share and monitor the information process.
Content analysis from Open Coding frequency
Selection of coaches, Coaches must have a lot of experience, a broad perspective and good interpersonal relationships, Selection of a new generation coaching team that has an idea to develop the organization, Select talented people to lead success, Characteristics of good coaches, Good way of thinking, Work as a person in your family, Care and support, Employ trainers who are both leaders and companions, Development of people for trips and trainings, a forum for sharing knowledge in many fields with other power plants, support for research, development and invention in many competitions, using a successful process for application and expansion, continuous development of knowledge, learning to fulfill skills and knowledge from the data of each profile, qualifications or selecting, developing, maintaining, reviewing people with talent, increasing skill, adding knowledge. Evaluate GAP difference, select maintenance methodology, preventive maintenance, predictive maintenance, proactive maintenance, replaced new components, baseline maintenance (CBM), classification according to maintenance duration, operation generation, safety and environment and legal supervisor, Corrective Maintenance (CM), classification from Reliability Centered Maintenance (RCM), Priority, Planning, Execution, Recurrence Prevention, Root Cause Analysis (RCA), Failure Mode Effect Analysis (FMEA), Risk Base Maintenance (RBM), Use of Innovation Tool, Online Condition monitoring, software system one-Analyze Vibration, Engineering Management, reduction of duplication of work, o Choose the right maintenance method and reduce time, Networking and teamwork, o Use of Expert System and special tools, Quality and efficiency of material from owner manufacturer, , engineering skills, they constantly improve or develop knowledge and process. Knowledge should be used for process application and development, exchange ideas in the forum and form the same standard, share knowledge and experience and community of practice (CoP), EIS system, keep information easy to find, can search by mobile phone in real of time , Use online monitoring and expert system, Make BAR (Before Action Review) and AAR (After Action Review), Show and share knowledge and process, record knowledge on the organization's knowledge portal, create a network of practitioners to develop knowledge and share mutual experiences, access to knowledge and application for innovation and improvement of their responsibilities.
Content Analysis of Axial Coding Frequency
Content Analysis of The Goal of Global Top Quartile Frequency
Content analysis of Recommendation
The Benchmarking Model by Performance Reference Model: PRM)
The Benchmarking analysis with Hypothesis (Conceptual Framework)
Table of Benchmarking Analysis of Fact (The Working System Model Concept), Hypothesis (Conceptual Framework) and Other Model
Confirmation of the hypothesis from actual content analysis data shows that the culture factor influences the model plant. Confirmation of the hypothesis from actual data of the content analysis shows that the HRD and HRM factor influence the model factory. Confirming the hypothesis from actual content analysis data shows that the IT and KM database factor influences the model factory.
Confirmation of the hypothesis from content analysis real data shows that CSR in Process &. Confirmation of the hypothesis from content analysis real data shows that Financial Structure Model factor affects the model plant.
CONCLUSION AND RECOMMENDATION
- The New Academic Contribution of The Working System Model Concept of Model Plant by benchmarking analysis of PRM
- To fulfill the literature review by driving factors from The Working System Model Concept of Model Plant
- The New Academic Contribution to Fulfill of Literature Review of the Six Box Model of Organization Diagnosis Theory, The Organization
- The New Managerial Implication of Energy Sector and Power plant
- Recommendation
- Recommendation of Improvement process of model plant
- Recommendation of the working system model concept of model plant
- Recommendation of Strategies
The frequency of respondents, 26 of 26 people agree that Strategy communication with the same purpose factor impact of the model plant in achieving Global Top Quartile Utility. The frequency of respondents, 19 of 21 people agree that the culture factor impact of the plant model in achieving Global Top Quartile Utility. The content analysis real data shows that CSR in Process & Post Process factor affects the model plant.
The frequency of the respondents, 26 out of 26 people agree that CSR in Process & Post Process the influence of the model plant factor in achieving the. Weight adjustment from the next step of the model plant working system model concept.
APPENDICES
Appendix A: Questions for Interview
How do you think about the process of creating engineering excellence in this field for driving the Combined Cycle Unit 1 of North Bangkok Power Plant to achieve the Global Top Quartile Utility. What about the Combined Cycle Unit 1 of the North Bangkok Power Plant and the community around the power plant. What About the Green Process That Consists of Model Plant in Achieving the Global Top Quartile Utility?
What about the relativity between financial model and availability factor of North Bangkok Power Plant Combined Cycle Unit 1. What about the way of financial platform structure used in Model Plant of North Bangkok Power Plant Combined Cycle Unit 1.
Appendix B: Definition of Terms Used in This Thesis
Available http://www.egat.co.th (12 January 2017) Heat Rate Heat rate is a common measure of steam system efficiency. It is defined as "the energy input to the system, usually in BTU/kWh, divided by the electricity produced in kW. The unit power reduction factor is the fraction of the maximum output (MG) that could not be produced due to the reduction in unit power.