Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol68.Issue1.Oct2000:
Teks penuh
Gambar
Dokumen terkait
The model developed is based upon the delay time concept where because of an absence of PM data, the process parameters and the delay time distribution were estimated from failure
Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time..
A problem of structure optimization of a series}parallel production system is considered where redundant producing elements (machines) and in-process bu!ers are included in order
The model we study is the simplest system that captures the key issues in pull type control in a multi stage production environment: we consider two single machines in tandem with
In the latter problem, an ideal solution (again not always feasible) is obtained by schedules which equalise the production load allocated to each parallel machine.. In fact, the
Given the nature of the customer demand and requirements and hence the tasks that might be required then an appropriate structure will have to be chosen for the service system..
erent from that of a new item, showed that the optimal strategy had the following simple form: Replace with a new item at any failure occurring up to a certain time measured from
Three main explanations for this were (1) large areas of bare fallow typical for the farming practice at the time; (2) enhanced mineralisation from newly cultivated land; and (3)