• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol67.Issue1.Aug2000:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol67.Issue1.Aug2000:"

Copied!
9
0
0

Teks penuh

Loading

Gambar

Fig. 3. Expected downtime for non-perfect inspection model and revising model.Fig. 2. Expected downtime for basic model and revised model.
Fig. 4. Expected downtime for non-Homogeneous case model and revised model. Table 1

Referensi

Dokumen terkait

Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time..

In doing so, the proposed framework relates cost, time and quality performances to three operational processes (physical transformation, product development and material #

In this paper we have analyzed a problem of setting reorder points (or safety stocks) of a popula- tion of items, subject to a restricted set of possible values (expressed as

Based on eleven competitive priorities, three distinct clusters of manufacturing strategy groups have also been for- med and compared in terms of the business context,

f autonomous agent architectures: 1 in the last years manufacturing research started to study possible applications of autonomous agent the- ory to production planning and

An important category of production control approaches for job shop production is based on workload control (WLC) principles. The WLC con- cepts bu ! er the shop # oor against

We hope these issues not only create knowledge, but also enhance individual creativity, so that the cognitive system } a " rm, a strategic business unit, a plant, a

Keywords: Preventive maintenance; Delayed alternating renewal process; Proportional-hazards model; Proportional-intensities model; Bayesian methods;