Minimisasi Waktu Produksi Dengan Mengeliminasi Kegiatan Non-Value Added Menggunakan Metode Gert (Graphical Evaluation And Review Technique) Dan Vsm (Value Stream Mapping) Pada Pt Morawa Electric Transbuana

N/A
N/A
Protected

Academic year: 2016

Membagikan "Minimisasi Waktu Produksi Dengan Mengeliminasi Kegiatan Non-Value Added Menggunakan Metode Gert (Graphical Evaluation And Review Technique) Dan Vsm (Value Stream Mapping) Pada Pt Morawa Electric Transbuana"

Copied!
234
0
0

Teks penuh

Loading

Gambar

Gambar 2.2. Flowchart Proses Produksi Transformator
Tabel 2.5. Daftar Mesin Produksi PT Morawa Electric Transbuana
Tabel 3.1. Tipe Kesalahan dalam Pengujian Hipotesis
Gambar 3.2. Kurva Normal
+7

Referensi

Dokumen terkait

Value Stream Mapping (VSM) tool will lead researcher to define the current state and to develop the future state of the process flow, and finally develop standard work that

This study was aimed to fi nd kind of improvements of sugar distribution system using value stream mapping (VSM) when some inef fi ciencies in physical and service activities

Dari proses metode Value Stream Mapping (VSM), dan Fishbone Diagram diketahui bahwa proses yang memiliki tingkat lead time yang tinggi yakni proses inspeksi komponen pengepakan,

PENERAPAN LEAN DENGAN METODE VALUE STREAM MAPPING (VSM) DAN LEAN ASSESMENT PADA PRODUKSI GALVALUME.. (STUDI KASUS PT. INTI PRIMA KENCANA SEMARANG) THE APPLICATION OF LEAN BY VALUE

Kesimpulan penelitian ini adalah metode value stream mapping dapat diaplikasikan alat ukur dan dapat menggambarkan aliran proses produksi di galangan kapal sehingga dapat menjelaskan