95
Lampiran 12. Hasil Analisis QM for WINDOWS Skenario II Module / submodule: Linear Programming – [Solution List]
Problem title: Optimalisasi Usaha Agroindustri Tahu di Kota Pekanbaru Objective: Maximize
Results
X1 X2 RHS
Maximize 229,84 151,96
Constrains 1 0,02488 0.02015 <= 9.187,5
Constrains 2 0,02045 0,01641 <= 13.500
Constrains 3 0,03949 0,03222 <= 22.570,875
Constrains 4 0,00005 0,00003 <= 300
Constrains 5 135,21 110,31 <= 77.270.209,31
Ranging
Variable Value Redust Cost Original
Value BoundLower BoundUpper
X1 369.272,5 0 229,84 187,631 Infinity
X2 0 34,1845 151,96 -Infinity 186,1445
Constraint Dual Value Slack Original Value
Lower Bound
Upper Bound
Constraint 1 9.237,942 0 9.187,5 0 14.218,49
Constraint 2 0 5.948,377 13.500 7.551,623 Infinity
Constraint 3 0 7.988,309 22.570,88 14.582,57 Infinity
Constraint 4 0 281,5364 300 18,4636 Infinity
Constraint 5 0 27.340.870 77.270.210 49.929.340 Infinity
Solution List
Variable Status Value
X1 Basic 369.272,5
X2 Basic 0
Slack 1 Non Basic 0
Slack 2 Basic 5.948,377
Slack 3 Basic 7.988,309
Slack 4 Basic 281,5364
Slack 5 Basic 27.340.870
96
Iterasi…
215,47 140,24 0 0 0 0 0
X1 X2 Slack 1 Slack 2 Slack 3 Slack 4 Slack 5 Iterations 1
slack 1 0,0249 0,0202 1 0 0 0 0
slack 2 0,0204 0,0164 0 1 0 0 0
slack 3 0,0395 0,0322 0 0 1 0 0
slack 4 0,0 0,0 0 0 0 1 0
slack 5 135,21 110,31 0 0 0 0 1
zj 0 0 0 0 0 0 0
cj – zj 229,84 151,96 0 0 0 0 0
Quantity Iteration 1
slack 1 9.187,5
slack 2 13.500
slack 3 22.570,88
slack 4 300
slack 5 77.270.210 zj
cj – zj
Iterasi Lanjutan…
229,84 151,96 0 0 0 0 0
X1 X2 Slack 1 Slack 2 Slack 3 Slack 4 Slack 5 Iterations 2
X1 1 0,8099 40,1929 0 0 0 0
slack 2 0 -0,0002 -0,8219 1 0 0 0
slack 3 0 0,0002 -1,5872 0 1 0 0
slack 4 0 0,0 -0,002 0 0 1 0
slack 5 0 0,8051 -5.434,486 0 0 0 1
zj 229,84 186,1445 9.237,942 0 0 0 0
cj – zj 0 -34,1845 -9.237,942 0 0 0 0
Quantity Iteration 2
X1 369.272,5
slack 2 5.948,377
slack 3 7.988,309
slack 4 281,5364
slack 5 27.340.870 zj