iii PENGGANTIAN KOMPONEN KRITIS PADA MESIN TIP SANDER

TOOL BERDASARKAN KEANDALAN SPAREPART (Studi Kasus pada PT. Fajar Abadi Saluyu Cikarang)

Oleh:

Linda Sri Rahayu A10110267

Pembimbing:

Dr. Anton Mulyono Azis, SE., MT

ABSTRAK

Permasalahan pemeliharaan mesin Tip Sander Tool pada PT. Fajar Abadi Saluyu Cikarang yaitu pemeliharaan mesin yang tidak terjadwal yang berdampak pada sering terjadinya kerusakan mesin. Sehingga mengakibatkan downtime yang tinggi, biaya pemeliharaan yang tinggi dan ketidaksesuaian anggaran biaya.

Penelitian ini bertujuan untuk menentukan waktu interval penggantian komponen kritis pada mesin tip sander tool berdasarkan keandalan sparepart serta melakukan penghematan biaya pemeliharaan untuk mesin.

Komponen kritis ditentukan dengan tiga peringkat biaya terbesar dari komponen-komponen penyusun mesin. Interval penggantian komponen dihitung menggunakan metode keandalan. Melakukan uji Anderson-Darling (AD) dan menghitung time to failure menggunakan bantuan software minitab.

Dari hasil penelitian ini yaitu didapatkan jadwal pemeliharaan mesin Tip Sander Tool berdasarkan keandalan sparepart. Adapun jadwal penggantian komponen cylinder dilakukan setiap 19 hari operasi, komponen rotor setiap 20 hari operasi dan penggantian komponen support setiap 18 hari operasi. Dengan diberlakukannya pemeliharaan secara terjadwal akan memberikan biaya pemeliharaan sebesar Rp. 22.151.173, pemeliharaan ini lebih kecil dibandingkan pemeliharaan secara korektif yaitu sebesar Rp. 26.773.180. Selain itu sebaiknya perusahaan melakukan pemeliharaan secara preventif guna meminimalkan biaya pemeliharaan.

Kata Kunci: Keandalan, Maintenance, Minimalisasi Biaya.

(2)

iv TIP SANDER TOOL CRITICAL COMPONENT REPLACEMENT

BASED ON SPAREPART RELIABILITY (Case Study at PT. Fajar Abadi Saluyu Cikarang)

Writen by:

Linda Sri Rahayu A10110267

Supervized by:

Dr. Anton Mulyono Azis, SE., MT

ABSTRACT

Tip Sander Tool problems in PT. Fajar Abadi Saluyu Cikarang the unscheduled engine maintenance is one of impaction the frequent occurrence of damage to the machine. Thus resulting a high downtime, high maintenance costs and budget incompabillity. This study aims to determine the time interval of replacement parts on the machine tip sander tool based on the reliability of sparepart and perform maintenance cost savings for the machine.

Critical component is determined by tree ranking the biggest cost of the components of the engine. Component replacement intervals were calculated using the realibillity method. This method used Anderson-Darling (AD) and calculating time to failure to use the Minitab software.

This results of this study obtained maintenance schedule engine based on the reliability of Tip Sander Tool spareparts. The schedule component replacement cylinder operation is conducted every 19 days, every 20 days rotor component operation and replacement of components support every 18 days of operation. The scheduled maintenance would provide maintenance cost Rp.

22.151,173, maintenance is less than corrective maintenance is Rp. 26.773,18 million. In addition the company should perform preventive maintenance in order to minimize the maintenance costs.

Keywords: Reliability, Maintenance, Cost minimization

Referensi

Dokumen terkait

Tugas Akhir dengan judul Optimalisasi Interval Penggantian Pencegahan Komponen Kritis Untuk Minimasi Downtime Pada Mesin Sizing HS20-II (Studi kasus: PT. PRIMATEXCO

Interval waktu perawatan yang tepat pada komponen kritis Mesin Mitsubishi 1F-15000 menggunakan P-F Interval dari MTTF/MTBF masing-masing komponen sesuai dengan jenis

Data yang diperlukan dalam penelitian adalah komponen mesin yang rusak, jenis kerusakan yang dialami mesin, interval waktu antar kerusakan dan waktu penggantian komponen

Selanjutnya hasil dari perhitungan dan analisa interval waktu pemeliharaan berdasarkan penerapan preventive maintenance untuk komponen mesin belt conveyor kritis yaitu pada

Hasil penelitian diperoleh bahwa dari 10 sub mesin pada Mesin Insulation Moulding didapatkan 8 komponen kritis dan komponen kritis yang memiliki kegagalan potensial diantaranya;

Tujuan penelitian ini ialah untuk mengetahui komponen kritis pada mesin SPM 1800, menentukan pola distribusi yang sesuai untuk masing-masing komponen kritis mesin SPM

Untuk menjaga kelancaran kebijakan preventif dihitung pula interval penggantian mata gerinda untuk setiap mesin dengan rata-rata penggantian mata gerinda untuk

Hasil analisis nilai TTF & TTR telah menghasilkan usulan interval waktu pemeriksaan komponen kritis dari mesin distilasi yaitu interval 32 jam untuk boiler dan interval 64 jam untuk