• Tidak ada hasil yang ditemukan

[PDF] Top 20 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.

Has 10000 "WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225." found on our website. Below are the top 20 most common "WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.".

WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.

WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.

... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap

148

WINRIP DOC MPR CTC MPR No.8 2013 08 2013 08 09 00225.

WINRIP DOC MPR CTC MPR No.8 2013 08 2013 08 09 00225.

... All WINRIP packages are designed to have external parties involved in conducting an independent assessment of the project throughout ...the WINRIP website (under construction), project information booth ... Lihat dokumen lengkap

85

WINRIP DOC MPR CTC MPR No.9 2013 09 2013 09 09 00225.

WINRIP DOC MPR CTC MPR No.9 2013 09 2013 09 09 00225.

... All WINRIP packages are designed to have external parties involved in conducting an independent assessment of the project throughout ...the WINRIP website (under construction), project information booth ... Lihat dokumen lengkap

90

WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.

WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.

... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap

134

WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.

WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.

... Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap

112

WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269

WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269

... The problem of slow and delayed progress have been going-on ever since the work commenced some seventeen (17) months ago. As only 22% or 138 calendar days of the contract time are left to complete the remaining ... Lihat dokumen lengkap

140

WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.

WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.

... The activity on the Community Representative Observers (CROs) during July 2014 was carried out the selection of CRO for Package 17: Simpang Gunung Kemala Pugung Tampak, Lampung Province on July 17, ... Lihat dokumen lengkap

131

WINRIP DOC MPR CTC MPR No.53 2017 05 20170531 00492

WINRIP DOC MPR CTC MPR No.53 2017 05 20170531 00492

... a) Environmental Safeguards. The environmental licenses for all work packages were obtained. Similarly, the quarry permits for the ongoing works are up to date. The licenses for the stone crushers and asphalt mixing ... Lihat dokumen lengkap

173

WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.

WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.

... the CTC mobilization, the DSC has not been established ...The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and ...the ... Lihat dokumen lengkap

82

WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.

WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.

... WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the construction supervision of all the works programs will be performed by the same DSC team. In parallel with the instruction to speed up ... Lihat dokumen lengkap

136

WINRIP DOC MPR CTC MPR No.18 2014 06 2014 06 11 00225.

WINRIP DOC MPR CTC MPR No.18 2014 06 2014 06 11 00225.

... [r] ... Lihat dokumen lengkap

1

WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.

WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.

... The component provides for consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap

107

WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.

WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.

... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap

124

WINRIP DOC MPR CTC MPR No.5 2013 05 2013 05 10 00225.

WINRIP DOC MPR CTC MPR No.5 2013 05 2013 05 10 00225.

... All WINRIP packages are designed to have external parties involved in conducting an independent assessment of the project throughout ...the WINRIP website (under construction), project information booth ... Lihat dokumen lengkap

88

WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.

WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.

... is WINRIP AWP-3 in Bengkulu province has carried out by the CTC technical review team(senior highway engineer, senior road safety auditor, highway engineer) ) in order to assess and finalize the technical ... Lihat dokumen lengkap

117

WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.

WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.

... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non- status roads which are in process of being reclassified as ... Lihat dokumen lengkap

133

WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.

WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.

... October 2014 are listed in Table ...Amendment No. 1 and temporarily demobilized on March 2014, however, he will be remobilized for two (2) months period under Amendment ...11-28, 2014 to ... Lihat dokumen lengkap

172

WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.

WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.

... Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap

127

WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281

WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281

... when CTC informed PMU about the detailed delivery program and schedule of this training while preparing invitation letter for prospective participants, PMU considered for the time being to postpone this training ... Lihat dokumen lengkap

149

WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278

WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278

... The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and ...of No Objection Letter ... Lihat dokumen lengkap

149

Show all 10000 documents...