WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
130
WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
... WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the construction supervision of all the works programs will be performed by the same DSC team. In parallel with the instruction to speed up ... Lihat dokumen lengkap
136
WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non- status roads which are in process of being reclassified as ... Lihat dokumen lengkap
127
WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
134
WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
... Dec 2015). b) Based on CTC survey on 12 May 2016 was found that the shoulder widening complete until 25 Km, the remaining 26 Km in ...Dec 2015) was submit to PMU on firs of Feb 2016, period ... Lihat dokumen lengkap
152
WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
... Dec 2015). b) Based on CTC survey on August 2016 was found that the shoulder widening complete until 25 Km, the embankment on side river in Start project under construction, the remaining 26 Km in ... Lihat dokumen lengkap
169
WINRIP DOC MPR CTC MPR No.42 2016 6 20160630 00402
... Dec 2015). b) Based on CTC survey on 12 May 2016 was found that the shoulder widening complete until 25 Km, the remaining 26 Km in ...Dec 2015) was submit to PMU on firs of Feb 2016, period ... Lihat dokumen lengkap
152
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... CTC professional staffs involved in the project as of end of October 2014 are listed in Table 3.1. Senior Highway Engineer (International) have completed his allocated man-month in the original contract and ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269
... May 11, 2015 ...Package 11 (Bantal - Mukomuko) Bengkulu Province, conveying information from local newspaper clippings (Koran Rakyat Bengkulu) containing news that a ...Package 11 (Bantal - ... Lihat dokumen lengkap
140
WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278
... The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and ...of No Objection Letter ... Lihat dokumen lengkap
149
WINRIP DOC MPR CTC MPR No.47 2016 11 20161130 00438
... The overall progress towards achieving the PDO of increasing the effective use of selected sections of national roads along the Western Sumatra Corridor by reducing road user costs is considered moderately satisfactory. ... Lihat dokumen lengkap
170
WINRIP DOC MPR CTC MPR No.2 2013 02 2013 02 11 00225.
... 6.6.3. LARAP Study Report for Package No.03 : Manggopoh – Padang Sawah The report was concurred by the World Bank on 4 January 2013. The draft Monitoring LARAP Report was being prepared the CTC. As ... Lihat dokumen lengkap
79
WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
150
WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
... Procure e t shall e co ducted u der the Ba k’s Procure e t Procedures as e tio ed i the Loa Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
123
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
73
WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
... report of Road Safety which is to identify the road safety weaknesses in design during the design and actual construction and make recommendations for realistic improvements, has been made in response to recommendation ... Lihat dokumen lengkap
133
WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
... Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.11 2013 11 2013 11 11 00225.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.10 2013 10 2013 10 11 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
99