• Tidak ada hasil yang ditemukan

[PDF] Top 20 WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.

Has 10000 "WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224." found on our website. Below are the top 20 most common "WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.".

WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.

WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.

... There is information submitted by a member of the Third Party Monitoring (TPM) package 04: Ipuh Bantal (Bapak Hardiansyah ST, MT) on March 23, 2015, at 09:00:49 clock through complaint handling system (CHS) in ... Lihat dokumen lengkap

150

WINRIP DOC MPR CTC MPR No.47 2016 11 20161130 00438

WINRIP DOC MPR CTC MPR No.47 2016 11 20161130 00438

... on CTC survey on August 2016 was found as follows : a)Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, ... Lihat dokumen lengkap

170

WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445

WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445

... on CTC survey on August 2016 was found as follows : a)Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, ... Lihat dokumen lengkap

161

WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329

WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329

... to 31 December 2015, all the 22 environmental studies for the twenty one (21) sub-projects including a separate study (UKL/UPL) for Air Gadang Bridge on Package ...granted No Objection Letter (NOL) ... Lihat dokumen lengkap

157

WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480

WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480

... Environmental: a) Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, shoulder widening and mortal, c) The Contractor ... Lihat dokumen lengkap

178

WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.

WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.

... All three (3) Procurement Teams or Pokja evaluated all qualification documents submitted by those Applicants. Submission of the Application Evaluation Report (AER) to the Bank was on 9 May 2012 for two packages (Package ... Lihat dokumen lengkap

73

WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435

WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435

... on CTC survey on August 2016 was found as follows : a)Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, ... Lihat dokumen lengkap

169

WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432

WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432

... on CTC survey on 9 May 2016 was found as follows : a)Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, ... Lihat dokumen lengkap

152

WINRIP DOC MPR CTC MPR No.42 2016 6 20160630 00402

WINRIP DOC MPR CTC MPR No.42 2016 6 20160630 00402

... at 27 April 2016. Based on CTC Survey on 27 April 2016m was found as follows: ...on 27 Jan 2015 . d) CTC not yet receive of license for quarry,AMP & Stone ... Lihat dokumen lengkap

152

WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.

WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.

... since no new bidding processes can be started after March 31, 2015 (otherwise works implementation will go beyond the closing ...March 31, ... Lihat dokumen lengkap

172

WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.

WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.

... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap

130

WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278

WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278

... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap

149

WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.

WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.

... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap

123

WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359

WINRIP DOC MPR CTC MPR No.39 2016 3 20160331 00359

... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap

142

WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383

WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383

... The overall progress towards achieving the PDO of increasing the effective use of selected sections of national roads along the Western Sumatra Corridor by reducing road user costs is considered moderately satisfactory. ... Lihat dokumen lengkap

145

WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290

WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290

... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap

143

WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347

WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347

...  Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP), Project Management Manual (PMM) on their website, and in the ... Lihat dokumen lengkap

150

WINRIP DOC MPR CTC MPR No.54 2017 06 20170630 00493

WINRIP DOC MPR CTC MPR No.54 2017 06 20170630 00493

... PP No.27 year 2012 the contractor can't work at link of ...that no oil, diesel and asphalt spills found at base camp, rain drainage & fuel storage available at base camp & the peoples ... Lihat dokumen lengkap

167

WINRIP DOC MPR CTC MPR No.53 2017 05 20170531 00492

WINRIP DOC MPR CTC MPR No.53 2017 05 20170531 00492

... a) The project under construction. b) The permits for Quarry complete from Governor & AMP/Stone crusher under process in BLH Kab.Pariaman. c) Utilities issues on commercial & residents areas, d) occur puddle on ... Lihat dokumen lengkap

173

WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281

WINRIP DOC MPR CTC MPR No.32 2015 08 20150831 00281

... when CTC informed PMU about the detailed delivery program and schedule of this training while preparing invitation letter for prospective participants, PMU considered for the time being to postpone this training ... Lihat dokumen lengkap

149

Show all 10000 documents...