WINRIP DOC MPR CTC MPR No.6 2013 06 2013 06 12 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti- Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
100
WINRIP DOC MPR CTC MPR No.10 2013 10 2013 10 11 00225.
... Until now, only result of bidding for Package 04: Ipuh – Bantal had received approval from Ministry of Public Work for contract award. The three other of the bidding results still in-depth discussion with BAPEKON. The ... Lihat dokumen lengkap
99
WINRIP DOC MPR CTC MPR No.9 2013 09 2013 09 09 00225.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
90
WINRIP DOC MPR CTC MPR No.11 2013 11 2013 11 11 00225.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.8 2013 08 2013 08 09 00225.
... The CTC technical review team(senior highway engineer, senior road safety auditor, highway engineer) visited 1 project sites in North Sumatra in order to finalize about identify major issues in aspect of highway ... Lihat dokumen lengkap
85
WINRIP DOC MPR CTC MPR No.54 2017 06 20170630 00493
... Sta. 12+525 - ...that no oil, diesel and asphalt spills found at base camp, rain drainage & fuel storage available at base camp & the peoples surrounding base camp not disturbed by base camp ... Lihat dokumen lengkap
167
WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.
... and 12) which are WINRIP AWP-2 in West Sumatera province has been carried out by the CTC technical review team (senior highway engineer, senior road safety auditor, highway engineer) ) in order to ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
117
WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
148
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... All three (3) Procurement Teams or Pokja evaluated all qualification documents submitted by those Applicants. Submission of the Application Evaluation Report (AER) to the Bank was on 9 May 2012 for two packages (Package ... Lihat dokumen lengkap
73
WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
... May 2013 and demobilized on April 1st 2014, technical design and road safety engineering review and road safety audit which is AWP-2 and AWP-3 sub-projects has been ...Engineering CTC team (road safety ... Lihat dokumen lengkap
123
WINRIP DOC MPR CTC MPR No.42 2016 6 20160630 00402
... on CTC survey on 12 May 2016 was found that the shoulder widening complete until 25 Km, the remaining 26 Km in ...by CTC c) The HIV-AIDS campaign, complete on 14 Jan ... Lihat dokumen lengkap
152
WINRIP DOC MPR CTC MPR No.2 2013 02 2013 02 11 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro-active in resolving issues when such a matter ... Lihat dokumen lengkap
79
WINRIP DOC MPR CTC MPR No.12 2013 12 2013 12 10 00225.
... All WINRIP packages are designed to have external parties involved in conducting an independent assessment of the project throughout ...the WINRIP website (under construction), project information booth ... Lihat dokumen lengkap
114
WINRIP DOC MPR CTC MPR No.7 2013 07 2013 07 12 00225.
... March 2013 for board of director and board of commissioner information of the Government’s Entity participated in the ...Ref. No. WINRIP/122 dated May 1 st , ... Lihat dokumen lengkap
54
WINRIP DOC MPR CTC MPR No.5 2013 05 2013 05 10 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
88
WINRIP DOC MPR CTC MPR No.3 2013 03 2013 03 08 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
81