Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol66.Issue1.Jun2000:
Teks penuh
Gambar
Dokumen terkait
Two papers, by Orphanides, Porter, Reifschneider, Tetlow, and Finan and by Drew and Hunt take up the interaction between monetary policy rules such as the Taylor rule and
Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time..
Given the nature of the customer demand and requirements and hence the tasks that might be required then an appropriate structure will have to be chosen for the service system..
In contrast, the same unit in period 2 ( B 2 ) is e $ cient since it produces the maximum output attainable, given the existing technology. labour) and one output (i.e. GDP)
Buchanan, Estimating the cost for doing a cost estimate, The Telecommunications and Data Ac- quisition Progress Report 42125, Long-Range Planning Program, January } March,
The production planning problem for the milling machine indeed is a lot-sizing and scheduling prob- lem with sequence-dependent setups.. Setting the milling machine up actually means
" nish when the " nished goods batch is due to start and for the time to manufacture each subsequent process batch to be the same as the time for the previous process batch
The logic of the SDT methodology is to use these models to introduce the generic, self-directed form of team- working, and then subsequently to articulate the relationship