Tabel 6.1: Komposisi air limbah di Kota Bogor

2010 2015 2020 2020

Domestic piped water usage lcd 166 166 166 166

Ratio drinking water/waste water % 70% 70% 70% 70%

Daily wastewater production

lcd

116

116

116

116

Ratio volume black/grey water % 25% 25% 25% 25%

Strength black water

mg BOD/l

450

450

450

450 Strength grey water

mg BOD/l

170

170

170

170 BOD contribution black water gBOD/cap/da

y

13

13

13

13 BOD contribution grey water gBOD/cap/da

y

15

15

15

15

Ratio black/grey BOD % 88% 88% 88% 88%

Domestic waste production per capita (pe) gBOD/cap/da y

28

28

28

28 Daily BOD load domestic wastewater kg BOD/day 27,609 31,792 42,669 49,641 Daily BOD load wastewater commercial enterprises kg BOD/day 2,513 2,793 3,910 4,468 Daily BOD load domestic wastewater and ww

commercial enterprises kg BOD/day 30,122 34,585 46,578 54,109

Strength domestic wastewater

mg BOD/l

240

240

240

240

277184BA01 MMI MMI 12 A

(2)

2010 2015 2020 2020

Strength wastewater commercial enterprises

mg BOD/l

400

400

400

400 Sumber: PDAM Bogor, investigasi dan kajian MMI

1.1.1.1

STP Tegal Gundil maximum capacity

Sebagaimana didetailkan di Bab 6.2.1, proses WSP eksisting di IPAL Tegal Gundil memadai untuk

mengolah limbah 2400 rumah tangga. Waktu retensi minimum yang direkomendasikan untuk sistem WSP

adalah 4 hari, untuk 2400 sambungan, waktu retensi di IPAL Tegal Gundil adalah 4 jam, sehingga

kapasitas pengolahan memadai untuk melayani rencana peningkatan zona pelayanan air limbah. Lihat

Tabel 6.5 untuk detail kalkulasi proses.

Table 6.2: Kalkulasi proses IPAL Tegal Gundil

Assessment Tegal Gundil 30/Mar/11 BOGOR

Description Unit 8

Households served [nrs] 2,400

Household size [cap/hh] 5

Persons served [cap] 12,000

BOD per person per day [gBOD] 28

Average water produced [lcd] 116.2

Inflow, leakage, stormwater % 20%

Daily Capacity [m3/day] 1,673

Avg. sewage strength [mgBOD/l] 200

Bacteriological Quality [E-coli/l] 1E+08

Breakdown rate BOD 22degr. [1/day] 0.42

Breakdown rate E-coli 22degr. [1/day] 3.68

ANAEROBIC PONDS

Number of ponds 3

Desludging interval [years] 1

Per person sludge production [liters/year] 30

Sludge [m3] 360

Extra depth [m'] 0.48

Depth [m'] 2.5

Effective depth [m'] 2.02

Surface area [m2] 250

Surface area [m2] 750

Volume [m3] 1,515

Organic loading gBOD/m3/d 220.90

Retention time [days] 0.9

BOD removal lower layers [%] 30%

Remaining BOD [mgBOD/l] 140

BOD effluent [mgBOD/l] 102

(3)

Assessment Tegal Gundil 30/Mar/11 BOGOR

Efficiency BOD removal [%] 49%

Efficiency E-coli removal [%] 77%

FACULTATIVE PONDS

Effective depth [m'] 1.50

Surface area pond 1 [m2] 1,025

Surface area pond 2 [m2] 435

Surface area [m2] 1,460

Volume [m3] 2,190

Retention time [days] 1

BOD removal lower layers [%] 0%

Remaining BOD [mgBOD/l] 102

BOD effluent [mg/l] 66

BQ effluent [E-coli/l] 4E+06

Efficiency BOD removal [%] 35%

Efficiency E-coli removal [%] 83%

AEROBIC PONDS

Effective depth [m'] 1.50

Surface area pond 1 [m2] 640

Surface area pond 2 [m2] 485

Surface area [m2] 1,125

Volume [m3] 1,688

Retention time [days] 1

1.1.1.2

UASB reaktor IPAL Paledang

Kriteria desain dan desain reaktor UASB untuk tahun 2015 disajikan pada Tabel 6.6. Akan dibutuhkan 3

unit reaktor, berukuran panjang 21 meter, lebar 8 meter dan tinggi 5 meter. Sebagai alternatif, 2nam

reaktor fiberglas bertulang dapat juga digunakan. Masing-masing reaktor berukuran tinggi 5m dan diameter

10m. Unit ini dapat digunakan kembali untuk tujuan lain ketika IPAL Paledang tidak digunakan lagi saat

wilayah embrio sudah tersambung dengan pipa induk zona Pusat dan pengolahan air limbah dipusatkan di

IPAL Kayumanis.

Tabel 6.3: Desain reaktor UASB untuk 2015 - Embrio

Treatment Options 29/Mar/11 Embryo

Embryo 2015

Description Unit

Daily Capacity [m3/day] 3,876

(4)

Treatment Options 29/Mar/11 Embryo

Peak flow [m3/hour] 646

Avg. sewage strength [mgBOD/l] 230

Bacteriological Quality [E-coli/l] 1E+08

Breakdown rate BOD 22degr. [1/day] 0.42

Breakdown rate E-coli 22degr. [1/day] 3.68

UASB

Hydraulic retention time peak flow [hours] 4

Volume [m3] 2,584

Avg.Hydraulic retention time [hours] 16

BOD-load [kgBOD/m3/day] 0.34

Height [m'] 5

Surface Area [m2] 520

number [units] 3

length/width [1/1] 2.50

Width [m'] 8

Length [m'] 21

Surface load [m'/hour] 1.24

BOD removal [%] 80%

BQ removal [%] 50%

BOD effluent [mg/l] 46

BQ effluent [E-coli/l] 5E+07

1.1.1.3

Desain sistem FAP untuk IPAL Tegal Gundil, Ciluar dan Kayumanis

Proses WSP di tegal gundil dapat dialihkan menjadi FAP dengan penambahan aerator di kolam stabilisasi.

IPAL Ciluar dan Kayumanis akan dikembangkan dengan sistem FAP. Kriteria desain dan desain untuk

sistem DAP pada ketiga lokasi di tahun 2020 dan 2030 disajikan pada Tabel 6.7.

Tabel 6.4: Kriteria desain dan desain FAP

Treatment Options 29/Mar/11 BOGOR

STP 1: Tegal Gundil

STP 2: Kayu Manis

STP 2: Kayu Manis

STP 3: Ciluar

2030 2020 2030 2030

Description Unit

Households served [nrs] 3,000 12,300 30,000 11,000

Household size [cap/hh] 5 5 5 5

Persons served [cap] 15,000 61,500 150,000 55,000

BOD per person per day [gBOD] 28 28 28 28

Average water produced [lcd] 116.2 116.2 116.2 116.2

(5)

Treatment Options 29/Mar/11 BOGOR

STP 1: Tegal Gundil

STP 2: Kayu Manis

STP 2: Kayu Manis

STP 3: Ciluar

2030 2020 2030 2030

Description Unit

Inflow stormwater, leakage etc. [%] 20% 20% 20% 20%

Daily Capacity [m3/day] 2,092 10,933 26,564 9,740

Peak factor [ ] 2 2 2 2

Peak flow [m3/hour] 174 911 2,214 812

Avg. sewage strength [mgBOD/l] 240 240 240 240

Bacteriological Quality [E-coli/l] 1E+08 1E+08 1E+08 1E+08

Breakdown rate BOD 22degr. [1/day] 0.42 0.42 0.42 0.42

Breakdown rate E-coli 22degr. [1/day] 3.68 3.68 3.68 3.68

BOD removal aer.pond 22degr. [1/day] 1.07 1.07 1.07 1.07

FACULTATIVE AERATED PONDS

Retention time [days] 3 5 4 5

Volume [m3] 6,275 54,664 106,256 48,701

Depth [m'] 2.5 2.5 2.5 2.5

Surface area [m2] 2,510 21,866 42,502 19,480

Surface area [ha] 0.3 2.2 4.3 1.9

Desludging interval [years] 2 2 2 2

Per person sludge production [liters/year] 30 30 30 30

Sludge [m3] 900 3,690 9,000 3,300

Extra depth [m'] 0.36 0.17 0.21 0.17

Total depth [m'] 2.9 2.7 2.7 2.7

BOD removal lower layers [%] 30% 30% 30% 30%

Remaining BOD [mgBOD/l] 168 168 168 168

BOD effluent [mg/l] 40 26 32 26

Efficiency aeration BOD removal [%] 76% 84% 81% 84%

Oxygen requirement [kgO2/hour] 16 94 220 84

Oxygenation Capacity [kg O2/kWh] 1.6 1.6 1.6 1.6

Power requirement [kW] 10 59 138 52

Power input [W/m3] 1.4 1.0 1.2 1.0

No nitrification

BQ effluent [E-coli/l] 8E+06 5E+06 6E+06 5E+06

Efficiency BOD removal [%] 83% 89% 87% 89%

Efficiency E-coli removal [%] 92% 95% 94% 95%

suspended solids [mg/liter] 105 105 105 105

Sludge drying [ha] 0.18 0.738 1.8 0.66

SUMMARY ALTERNATIVE 2:

Nett Land requirement [ha] 0.43 2.92 6.05 2.61

(6)

Treatment Options 29/Mar/11 BOGOR

STP 1: Tegal Gundil

STP 2: Kayu Manis

STP 2: Kayu Manis

STP 3: Ciluar

2030 2020 2030 2030

Description Unit

Gross Land requirement [ha] 0.54 3.66 7.56 3.26

Power [kW] 32 89 182 81

Total energy [kWh/day] 356 893 1,783 822

Energy/year [kWh/year] 130,600 326,600 651,600 299,600

Gambar

Tabel 6.1:Komposisi air limbah di Kota Bogor
Table 6.2:Kalkulasi proses IPAL Tegal Gundil
Tabel 6.3:Desain reaktor UASB untuk 2015 - Embrio
Tabel 6.4:Kriteria desain dan desain FAP

Referensi

Dokumen terkait

By using the participatory rural appraisal, university can plan things such as; Developing collaboration groups of fisher community, Constructing learning action for

Kunci untuk merealisasikan angka penjualan agar terus mangalami peningkatan dalam bisnis ritel adalah menjual atau menyediakan barang dengan mutu atau kualitas yang baik

Penelitian ini bertujuan untuk mengetahui pengaruh biaya corporate social responsibility terhadap kinerja keuangan pada perusahaan yang terdaftar di bursa efek indonesia

Koleksi perancangan busana Enchanté de Femme Fatale merupakan koleksi evening gown yang cocok dikenakan untuk acara-acara besar, seperti acara. pernikahan,

Corporate social responsibility cost proxied through employee welfare costs (costs of post work) and costs for Community (contributions or donations).. Sampling

Tujuan penelitian ini untuk mengetahui apakah investasi dalam bentuk ekspansi Toko Aneka Jaya layak untuk dijalankan.. Alasan toko aneka jaya melakukan ekspansi usaha

[r]

[r]