• Tidak ada hasil yang ditemukan

PDF Roundtable on Sustainable Palm Oil Certification R S P O

N/A
N/A
Protected

Academic year: 2024

Membagikan "PDF Roundtable on Sustainable Palm Oil Certification R S P O"

Copied!
95
0
0

Teks penuh

RSPO Independent Smallholder Standard for the Production of Sustainable Palm Oil 2019, Endorsed by the RSPO Board of Governors and adopted at the 16th Annual General Meeting by RSPO members on 6 November 2019.

Description of Area Statement .1 Tenure

Description of Supply Base

Tonnage of Product

Assessment Team

Assessment Methodology, Assessment Process and Locations of Assessment .1 Figure of person days to implement assessment

RSPO Independent Smallholder Standard for the Production of Sustainable Palm Oil 2019, Endorsed by the RSPO Board of Governors and adopted at 16th Annual General Assembly by RSPO Members on 6

RSPO Certification Systems for Principles & Criteria and RSPO Independent Smallholder Standard, Endorsed by the RSPO Board of Governors on 12 November 2020

  • Locations of Assessment
  • Stakeholder Consultation and Stakeholders Contacted .1 Summary of stakeholder consultation process
  • Determining Next Assessment
  • Summary of Assessment Report of the RSPO Certification
    • The system requirements for Group Formation and Management (including the Internal Control System) that are only applicable to the group manager

The closing meeting was held in the Meeting Hall of KUD Karya Mandiri, where the chairman of the association, farmer members and other relevant personnel participated. KM-MM 4 /01, Field observation and interview regarding best practices, legality, environment and certification implementation. Public consultation with NGOs (by email) such as WALHI, WWF, AMAN and Sawit Watch on 25 August 2021 Data numbers from stakeholders were clarified by KUD Karya Mandiri and made part of this report. 2.3.2 Stakeholders were contacted.

MUTUAGUNG LESTARI conducted an assessment of the performance of KUD Karya Mandiri, which consists of 275 smallholders and 313 land parcels / lots. MUTUAGUNG LESTARI found that KUD Karya Mandiri meets the requirements of RSPO Independent Smallholder Standard, November 6, 2019 and RSPO Certification Systems for Principles & Criteria and RSPO Independent Smallholder Standard, which were approved by the RSPO Board of Governors on November 12, 2020.

The Group demonstrates that they are legally formed .1

SOP No 2/SOP/ICS/KUD-KM/XI/2020 dated 05 November 2020 regarding the admission of RSPO members, the procedure explains the assessment process, before any potential member joins the RSPO Certification. Based on the review of documents and interviews with KUD leaders, it was known that not all members of KUD Karya Mandiri have joined the RSPO Certification Programs, this is because currently this program is voluntary and there are some members who they don't want to join for some reason. Together in advance with the RSPO certification process, the Internal Audit, Registration and Complaints Division has verified the completeness of supporting documents such as ID Card, Photo, legal land documents, commitment and willingness documents for joint RSPO programs, etc.

KUD Karya Mandiri can show the verification process to prospective members before joint RSPO certification programs. Based on interviews with the small farmers and field observation on their land parcel, they understood the membership requirement and consequences in RSPO certification, such as aware of membership requirements, such as requirement to be a member, internal audit process, sanction for SOP violation as well as as benefit and benefit joint RSPO Certification.

The Group Manager is responsible for managing the Group for certification .1

KUD Karya Mandiri has established an Internal Control System (ICS) organization for both operational management and job responsibility. The group manager, as well as the official of KUD Karya Mandiri, received the RSPO training from SNV on October 30, 2020 and November 24, 2020. KUD Karya Mandiri can show the 2021 training plan document included in the KUD Karya Mandiri ICS 2020/ 2021 capacity building work plan.

FPIC training for ICS KUD Karya Mandiri team on November 25, 2020 attended by 17 participants. Based on the results of the document review and field visits, it is known that KUD Karya Mandiri has a training plan and training implementation covering PKM, HCV, Waste Management, Occupational Safety, Fire Prevention and other supporting training.

The group Internal Control System contains documented policies and procedures for operational management

The Internal Audit Mechanism established in the Internal Audit Procedure (No. 12/SOP/ICS/KUD-KM/XI/2020 dated 05 November 2020) the purpose of this procedure is to ensure that all members of the certification program RSPO and KUD Karya Mandiri has been ready and met all the RSPO indicator for Small Independent Owners. The internal audit is carried out in several stages until all members are 100% audited and coordinated by the Internal Audit Divisions. However, in the Internal Audit Procedure (PSO No: 12/SOP/ICS/KUD-KM/XI/2020 regarding the Implementation of Internal Audit) it is stated that the internal audit period must be adjusted and within 5 years all members who join the RSPO certification process have passed the internal audit at least 1 time process.

The achievement of internal audit is described in Milestone A summary in which internal audit has been carried out on all members during the period December 2020 – February 2021. In this regard, KUD Karya Mandiri is encouraged to re-evaluate the procedures related to internal audit, whereby all groups of members (including newly joined members) have undergone an internal audit (OFI) at least once a year.

The group has a group Business Plan prepared with the participation and contributions of group members

The ICS of the group is integrated with the Group’s Management Plan

Group managers can show internal audit documents that have been conducted to ensure that all members follow and implement existing standards. Internal audits are carried out in several stages until all members are 100% audited and coordinated by the Internal Audit Divisions. A preliminary internal audit carried out, the internal audit divisions will create an audit checklist, moreover the internal audit divisions will ensure that the internal auditors do not audit their works (farmer groups).

During the internal audit, there are several non-compliances regarding the RSPO standards for independent smallholder farmers, such as several members not knowing the legal documents of KUD Karya Mandiri, farmers not properly recording harvesting activities, and so on. An interview with the group manager got information when the internal audit split into different phases become more effective and optimize the available resources.

The group has a procedure and system in place for the tracking of FFB

KUD Karya Mandiri can show evidence of periodic monitoring of the plans that have been implemented in management and monitoring reports, from recording production data, training, sales and other implementation according to the plans that have been made. The prepared plans have been reviewed periodically in the management review (conducted after an internal audit) or in the annual KUD Karya Mandiri membership, which was most recently conducted on March 20, 2021.

The group documents and implements a system for the tracking of FFB

The group has a procedure and system for premium distribution

OPTIMISE PRODUCTIVITY, EFFICIENCY, POSITIVE IMPACTS AND RESILIENCE 1.1

Smallholders have capacity to effectively manage their farm

KUD Karya Mandiri can show documentation of training on plantation management, monitoring and planning, which includes training on. KUD Karya Mandiri can demonstrate effective plantation management and good management of production data records, this is evident from the production data for the last 2 years which have increased production, the production data was manually recapitulated and collected every 10 days and monthly. This data is visible on the production board, which is kept in the office of the cooperative, and in addition, the monthly production data is duly recapitulated in the form of digital records (soft file).

Based on the assessment of the KUD Karya Mandiri document, each member can present the GAP Implementation Commitment Document included in the RSPO Certification Commitment KUD Karya Mandiri Declaration Letter signed by each member. KUD Karya Mandiri completed the GAP training for all farmer members and facilitated it by AHI.

ENSURE LEGALITY, RESPECT FOR LAND RIGHTS AND COMMUNITY WELLBEING 2.1

Smallholders have not acquired lands from indigenous peoples, local communities or other users without their free, prior and informed consent, based on a simplified FPIC approach

The small farmers have a declaration of land ownership which also informs about a map of the land. Based on interviews with farmers, the Group Manager, Village Head and Plantation Agency obtained information whether KUD Karya Mandiri land originated from Transmigrasi Swakarsa Mandiri / Self-Directed Transmigration which started on 18 August 1994 with the participants from Province Jawa Tengah, Jawa Timur , Lampung, Jambi (Local Transmigration). In 2009, there is blossoming (pemekaran) of Village of Petaling Jaya, and this area became the Village of Trimulya Jaya, it is due to the blossoming of the village, KUD Karya Mandiri ar established in Village of Trimulya Jaya with the members of KUD are former KUD Margajaya members domiciled in Trimulya Jaya Village.

Each legal transfer takes place, the original owners must report to the head of the agricultural group and completely with a photocopy of the evidence of the legal transfer documents. SK.130/MenLHK/Setjen/PKL.0/2/2017) KUD Karya Mandiri Located outside the forest area (nature reserve area/nature protection area, protected forest, limited production forest, permanent production forest or convertible production forest) and located in other use areas.

For new plantings, smallholders do not clear or acquire any land without obtaining the free, prior and informed consent (FPIC), of local communities and indigenous people, based on a simplified FPIC approach

In addition, KUD Karya Mandiri has a list of workers employed by each member, the salary amount and an employment contract between the landowner and the staff. The implementation of the training provided can be demonstrated by the existence of a landowner contract with harvest workers. KUD Karya Mandiri may present a document certifying the commitment to pay employees in accordance with the minimum requirements in applicable law or mandatory industry standards of each member, as contained in the KUD Karya Mandiri RSPO Certification Commitment Declaration Letter issued by each member signed.

In addition, the anonymity of the individual making the complaint is explained. In addition, the complaints SOP and several other SOPs are included in the KUD Karya Mandiri palm oil manual.

Eligibility

RSPO – 4006a Page 72 Until the audit was conducted, no complaints were filed by employees with the KUD. The use of PPE by every worker (helmets, shoes) by workers or farmers doing their own work. Security facilities for spraying operations are facilitated by the KUD, where the KUD has access to a bobbin case, apron, cap, mask and others.

There is no discrimination, harassment, or abuse on the farm

The Management Unit conducted an HCV assessment in the KUD Karya Mandiri area, which has been ongoing since February. Some of the HCV management activities carried out by KUD Karya Mandiri include table setting, socialization and planting of woody plants in border areas. Based on the overlay results with the 2021 peat/PIPPIB distribution map and the forest area of ​​Jambi Province in 2014, it is known that the Karya Mandiri KUD area is not located in the peat area.

RSPO – 4006a Page 79 KUD Karya Mandiri may present a document of commitment not to use fire during land preparation, pest control or waste management from any member as contained in the KUD Karya Mandiri RSPO Certification Commitment Declaration Letter. Meanwhile, based on the results of interviews with the Plantation & Forestry Service, the Muaro Jambi Regency Environmental Service and village representatives, it is known that there has never been a fire in the KUD Karya Mandiri area so far.

Riparian buffer zones are identified and managed to ensure they are maintained and/or enhanced

KUD Karya Mandiri has completed the river buffer zone management training included in the HCV zone training which was held on January 25, 2021. Based on the results of the field visit to the Trimulya Farmers Group 1, it is known that the planting activities HCV tables have been carried out and installed. KUD Karya Mandiri already has a commitment statement for the use of the Spraying Unit Team and the reduction of banned Herbicides on September 15, 2020, which has been agreed by all the Farmers' Group Leaders.

The implementation of the use of the Injection Unit Team has been carried out since February 2021. KUD Karya Mandiri has maximized the use of the IPM approach to minimize the use of pesticides and herbicides in its plantations.

Evidence of permission or approval certificate and trademark from Certification Body which submitted by Client

Implementation of certificate and trademark used by Client comply with size and type (shape) against Guideline of trademark Use

Controlling of Certificate and Trademark, including withdrawing inappropriate trademark

  • Identification of Findings, Corrective Actions and Observations at MS -B Assessment
  • Noteworthy Positive Components

IAS has been implemented and an internal audit has been carried out for at least half of the group members and all audit findings have been closed. In this regard, KUD Karya Mandiri is encouraged to re-evaluate the procedures related to internal audit where all group members (including newly joined ones) have performed internal audit at least once a year. Currently, KUD Karya Mandiri has not yet received the RSPO Certificate and will be verified in the next assessment.

Tanah KUD Karya Mandiri bermula dari Transmigrasi Swakarsa Mandiri / Transmigrasi Mandiri yang dimulai pada tanggal 18 Agustus 1994 dengan peserta dari Provinsi Jawa Tengah, Jawa Timur, Lampung, Jambi (Transmigrasi Lokal). Tanah KUD Karya Mandiri bermula dari Transmigrasi Swakarsa Mandiri / Transmigrasi Mandiri yang dimulai pada tanggal 18 Agustus 1994 dengan peserta dari Provinsi Jawa Tengah, Jawa Timur, Lampung, Jambi (Transmigrasi Lokal).

Referensi

Dokumen terkait

Based on the description above, it is known that the Group Manager carries out a phased approach to ensure that members have progressively attended training related to the RSPO

201/HK/V/2016, ladder; 16 May 2016, regarding the environmental permit for oil palm plantation activities of PT SOCFINDO Indonesia Kebun Lima Puluh, • Approval of environmental

Operational Map of PT Adei Plantation & Industry 3 Abbreviations Used 4 1.0 SCOPE of the CERTIFICATION ASSESSMENT 1.1 Assessment Standard Used 6 1.2 Organisation Information 6

RHS Opening meeting  Auditee Speech Introduction of PIC, Profile of Certified Management Unit  Auditor Team Speech Introduction, Audit Objective, Audit Scope, Audit Plan

- Photo documentation of demolition of oil palm plantations on the edge of the Bolon river block 18 N at Afdeling II - The minutes of the Socialization of Water, Flora and Fauna

RSPO – 4006a/1.0/26072018 Page 65 Prepared by Mutuagung Lestari for Pabatu POM – PT Perkebunan Nusantara IV DATE 1 – 5 August 2019 PLANNED TIME PROCESSES / CLAUSES TO BE AUDITED

MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT PSQM : Plantation Sustainability and Quality Management PUK : Pengurus Unit Kerja Work Unit Management RaCP : Remediation and Compensation

Evidence observed filled by auditor: The results of the document review show that the company has proposed a TJSL Social and Environmental Responsibility program, as follows: 