... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.10 2013 10 2013 10 11 00225.
... The CTC technical review team(senior highway engineer, senior road safety auditor, highway engineer) visited 4 project sites (including New 2 Packages) in Bengkulu Province and have a discussion with Balai P2JN, ... Lihat dokumen lengkap
99
WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
... Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
127
WINRIP DOC MPR CTC MPR No.2 2013 02 2013 02 11 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
79
WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
... report of Road Safety which is to identify the road safety weaknesses in design during the design and actual construction and make recommendations for realistic improvements, has been made in response to recommendation ... Lihat dokumen lengkap
133
WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
134
WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
136
WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
... #16) and road safety engineering review and road safety and management monitoring report for AWP-1 (4 packages) has been implemented. After completing of technical design review, the report of Road Safety which is ... Lihat dokumen lengkap
138
WINRIP DOC MPR CTC MPR No.6 2013 06 2013 06 12 00225.
... packages No.6 (Lais – Bintunan, 11.6 km), No.11 (Bantal – Mukomuko, .... CTC checked the following current situation for: (i) road existing condition, (ii) status of land to be acquired, (iii) ... Lihat dokumen lengkap
100
WINRIP DOC MPR CTC MPR No.7 2013 07 2013 07 12 00225.
... In order to identify the recommendation and comments of the technical and road saftety review for Drawings and Cost Estimation for Re-design, There is held 3 rd presentation for the Technical review Package No.5 ... Lihat dokumen lengkap
54
WINRIP DOC MPR CTC MPR No.47 2016 11 20161130 00438
... Clarification of information of work implementation on package 04: Ipuh - Bantal was unfavorable, by TPM member (Mr. Hardiansyah, ST, MT). The information obtained from the local mass media. The problem is that ... Lihat dokumen lengkap
170
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... October 2014 are listed in Table ...Amendment No. 1 and temporarily demobilized on March 2014, however, he will be remobilized for two (2) months period under Amendment ...October 11-28, ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.
... Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP), Project Management manual (PMM) on their website, and in the ... Lihat dokumen lengkap
82
WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro-active in resolving issues when such a matter ... Lihat dokumen lengkap
117
WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as ... Lihat dokumen lengkap
148
WINRIP DOC MPR CTC MPR No.11 2013 11 2013 11 11 00225.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) will apply to the packages with the construction estimated cost more ... Lihat dokumen lengkap