• Tidak ada hasil yang ditemukan

OGC® Sensor Observation Service Interface Standard

N/A
N/A
Protected

Academic year: 2017

Membagikan "OGC® Sensor Observation Service Interface Standard"

Copied!
163
0
0

Teks penuh

Gambar

Figure 6: Sequence diagram of result retrieval
Figure 7: Data types of the GetCapabilities operation
Table 14: Additional section names for SOS Capabilities
Table 15: Properties in the Capabilities data type
+7

Referensi

Dokumen terkait

This includes the definition of a lightweight OGC SOS profile (OGC 11- 169r1), an analysis of and contribution to the specification of the Sensor Observation Service (SOS) 2.0

• CONFORMANCE LEVEL 3: A server shall implement a “strict” behaviour and implement exception handling as in the OGC standard EO Products Extension Package for ebRIM (ISO/TS

An EO SPS implementation passing the “Notifications” conformance test class shall first pass the “Channel Based PubSub” conformance test class defined in the Sensor Planning

Test Purpose: The range values of the response to a successful GetCoverage request containing an outputCrs parameter shall be determined according to the following

The response to a successful GetCoverage request containing no RSub::RangeSubset parameter shall consist of a coverage whose range type contains exactly the original cover-

The Scal::TargetAxisExtent parameter in a GetCoverage request, if present, shall contain an axis element which is identical to the identifier of some domain axis in the Grid

The OGC Web Coverage Service (WCS)– Processing Extension defines an extension to the WCS Core [OGC 09-110], the ProcessCoverages request type, which allows clients to initi-