SCOPE OF THE CERTIFICATION ASSESSMENT
Assessment Standard Used
Organisation Information
Type of Assessment
Locations of Mill and Plantation
Description of Area Statement
Planting Year and Cycles
Description of Mill and Supply Base
Tonnage of Product
The rating of the certified FFB claim is still the same as the previous period because the certificate holder is still in the process of replanting.
Other Certifications
Time Bound Plan
ASSESSMENT PROCESS
Assessment Team
Assessment Methodology, Assessment Process and Locations of Assessment
Observation and interviews related to hazardous waste management, emergency facilities, OHS implementation, employment and complaints mechanism. Observation and interviews with the Sterilizer operator regarding the employment aspect, the working environment aspect and specified workflows. Observation and interviews with the operator press regarding the employment aspect, the working environment aspect and specified work processes.
Observation and conversations with the boiler operator regarding the employment aspect, the working environment aspect and specified work procedures. Observation and interviews related to OHS implementations (includes: . eyewash, emergency washing, hazardous waste symbol, safety data sheets, PPE, work instruction for mixing agricultural chemicals, fire extinguisher), hazardous waste management, employment and grievance mechanism. Observation spraying activities and interviews with workers spray related to duties and responsibilities (job description), work procedures, a dose of agrochemical application, safe work practices, use of PPE, periodic medical examinations, P3K foreman, pay system, occupational protection (Health Insurance and employment), training in the use of pesticides are limited and transport workers.
Observation of childcare activities and interviews regarding duties and responsibilities (job description), working procedures, safe working practices, use of PPE, periodic health checks, reward system, industrial accident insurance, provision of welfare facilities and infrastructure for employees.
Stakeholder Consultation and Stakeholders Contacted
Observation of the quality of the facilities provided by the company to its employee and interview with childcare worker regarding employment. Observation of harvesting and interviews with harvesters and foremen related to work such as the distribution of harvest plots, crop rotation, criteria and fines harvest, the tonnage of the wage system, health insurance and occupational protection, safe work practices and use of PPE. Observation of fertilizer activity and conversations related to tasks and responsibilities (job description), work procedures, dosage of fertilizer application, safe work practices, use of PPE, periodic health checks, remuneration system, Occupational accident insurance, provision of welfare facilities and infrastructure for workers.
Dagiti kabangibang a purok: Purok Sidorukun ken Purok Perkebunan Pangkatan, Purok Perkebunan Sennah ken Purok Perkebunan Pangkatan.
Determining Next Assessment
ASSESSMENT FINDINGS
Summary of Assessment Report of the RSPO Certification
Implementation of management and monitoring of static emission was described in the Implementation Report of UKL-UPL semester 1 year 2017 for each unit. The certification unit has the SOP of the sampled soil and leaf soil in the no. Based on the results of interview management, document verification of semi-detailed land survey report, known that there is no peatland in the area of PT Pangkatan Indonesia and PT Sembada Sennah Maju.
Observation results in the WWTP, there is no indication of wastewater pollution to the environment. For example, in May 2017, based on the results of the census in the SNE, found pest attacks of mice that exceeded the threshold in blocks A3, A4 and A6. The certificate holder has a complete list of pesticides belonging to the World Health Organization Class 1A or 1B, or those listed in the Stockholm or Rotterdam Conventions.
Based on the results of field observations, it is known that the use of paraquat is done at the first rotational spraying. Based on interviews with sprayers in the Pangkatan Estate and Sennah Estate, they are known to have a safe work practice. Based on the results of field observations in chemical warehouses and toxic mixing sites, there is an MSDS that is placed as a guideline in the handling of chemicals.
Based on interviews with spray workers, it is also known that the field foreman understands workplace accident procedures as well as the instructions in the MSDS that each product applied to the workers. The certificate holder has emergency and work accident procedures in place, including those stated in the document Emergency Management Procedures (document number SSM / SOP / General-10) and Work Accident Reporting and Handling Procedures (document number SNE / SOP / K3-14). The management and monitoring plan and its implementation are described in the UKL-UPL Implementation Report.
Based on the visit to the composting area, EFB is used as compost raw material. The implementation of immovable resource management and monitoring is described in the implementation report of UKL-UPL semester 1 year 2017 for each unit (PT Pangkatan and PT Sennah). The company also provides transportation for students who go to school in the village surrounding the company.
There is no harassment or abuse in the workplace and reproductive rights are protected.
Summary of Assessment Report of Supply Chain Requirements
The site must have written procedures and/or work instructions to ensure the implementation of all the elements specified in these requirements. This individual must be able to demonstrate knowledge of site procedures for implementing this standard. Pangkatan POM – PT Pangkatan Indonesia has some procedures related to implementation of supply chain system – Supply Chain:.
4.1.2) Mill provides a Daily report consisting of production data, certified and non-certified CPO and PK transport and supplies. 4.1.16) The Marketing Department will issue a “SALES CONTRACT” signed by the Director or an authorized representative of the Director. The Marketing Department will publish/inform Miller of the CPO/PK type/classification being sold, whether certified or non-certified. Ensure that all necessary RSPO verification information is properly recorded and reported for all certified and non-certified FFB, CPO, Palm Kernel.
Weighing officer ensures that the accompanying letter for the weighed FFB is marked or stamped indicating whether it is certified or non-certified (sustainable or non-sustainable). The site must have documented procedures for receiving and processing certified and non-certified FFBs. Meanwhile, Pangkatan POM does not have specific procedures for processing certified and non-certified FFBs.
The site must verify and document the quantities of certified and non-certified FFBs received. All FFB receipts from certified and non-certified are well recorded and documented through the WB system (Lintramx) and. The location shall immediately notify the CB if there is an anticipated overproduction of the certified tonnage.
Pangkatan POM has recorded and balanced all receipts of RSP-certified FFB and deliveries of RSPO-certified products. Pangkatan POM does not install KCP; the entire palm kernel production produced by the factory is sold directly to the buyer.
Conformity Checklist of Certificate and Logo Use
Summary of RSPO Partial Certification
Evans Lestari (PT.EL) carried out HCV and SIA identification in March 2013 by the forestry faculty of the Institute Pertanian Bogor (IPB) led by Dr. PT Evans Lestari and on December 17, 2013 NPP carried out by the certification body of Control Union. The last land clearing took place before November 2005 and no new land clearing or new planting has taken place.
Land clearing was carried out after November 2005, but HCV identification has only been carried out before land clearing. Based on internal audit, documented time of land clearing and declaration of responsibility sent to RSPO, there is new planting/land clearing after 1 January 2010 for PT Gunung Pelawan Lestari and PT Evans Lestari, but NPP has been carried out for these units. Evidence of submission to the RSPO is provided and the NPP notice is available on the RSPO website.
Based on the evidence provided, the company has simply planted on the acreage that has been compensated by the landowner from FPIC. There is no information from the public source and from the RSPO website about any labor conflict for uncertified units of the group's subsidiaries and also from the consultation with stakeholders during the first surveillance audit of PT PMM. The legal process of the land is still ongoing and there is a detailed update progress documented by the company for each year.
Legal update for PT Pelawan Lestari: The unit has a clear land deed and no extension of the new plantation area. Legal update for PT Pelawan Lestari: New HGU proposal for company-owned estate and company-owned KKPS. Legal update for PT Evans Lestari: The company has been granted a Plantation Business Permit (IUP) by Bupati Decree of Musi Rawas No.
However, the placement permit has expired – need additional HGU process information or any other legal process.
Identification of Findings, Corrective Action, Observations, OFI and Noteworthy Positive Components
Summary of Arising Issues from Public and Auditor Verification
There are no issues of migrant workers, no child workers, no replacement contracts, no labor trafficking or forced labor forms. The companies also helped repair rural roads, masks and sports equipment through CSR programs. Ease of communication with the company was making the relationship very well developed. Management of the gender committee has the program related to policies on sexual harassment, protection of reproductive rights.
The supplier agreed to the price provided by the company and there are no complaints related to FFB Prices or payment system. The entire content of the agreement is fair and transparent is known by both parties. Internal union meetings are held at least every 3 months and once a month with the company or if necessary can be done at any time.
The union knows there is an agreement between the brondolan and the company's kutib.
CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY
SPO – 4006a.7 Stran 56 Pripravil Mutuagung Lestari za PANGKATAN POM – PT PANGKATAN INDONESIA (MP EVANS GROUP PLC). SPO – 4006a.7 Stran 57 Pripravil Mutuagung Lestari za PANGKATAN POM – PT PANGKATAN INDOZIJA (MP EVANS GROUP PLC) PRILOGO. SPO – 4006a.7 Stran 58 Pripravil Mutuagung Lestari za PANGKATAN POM – PT PANGKATAN INDONESIA (MP EVANS GROUP PLC).
SPO – 4006a.7 Page 59 Prepared by Mutuagung Lestari for PANGKATAN POM – PT PANGKATAN INDONESIA (MP EVANS GROUP PLC). JAKARTA KUALANAMU MEDAN Train Station MEDAN Train Station RANTAU PRAPAT Train Station RANTAU PRAPAT Train Station PANGKATAN PLANTATION Opening meeting. Interview with gender committee, workers' union, workers' cooperative (if any), local contractor (for factories and estates), external supplier.
Implementation of Agronomy Aspect (Harvest & Transport, Fertilizer, Pesticides Use, Road Maintenance, Biological Control Monitoring, EFB Application). Implementation of the environmental and waste management aspect (inspection for chemical storage, fertilizer storage, hazardous waste storage, fire control facilities, waste management). Implementation of Agronomy Aspect (Harvest & Transport, Fertilizer, Pesticides Use, Road Maintenance, Biological Control Monitoring, EFB.
Formal Sign-off of Assessment Findings
List of Stakeholder Contacted in the RSPO Certification Process
Assessment Program
Peer Review
RSPO Certification Panel Committee Decision
RSPO P&C Checklist
RSPO Supply Chain Requirements Checklist