• Tidak ada hasil yang ditemukan

[PDF] Top 20 this PDF file An Appraisal of Project Procurement Methods in the Nigerian Construction Industry | S.O. | Civil Engineering Dimension 1 PB

Has 10000 "this PDF file An Appraisal of Project Procurement Methods in the Nigerian Construction Industry | S.O. | Civil Engineering Dimension 1 PB" found on our website. Below are the top 20 most common "this PDF file An Appraisal of Project Procurement Methods in the Nigerian Construction Industry | S.O. | Civil Engineering Dimension 1 PB".

this PDF file An Appraisal of Project Procurement Methods in the Nigerian Construction Industry | S.O. | Civil Engineering Dimension 1 PB

this PDF file An Appraisal of Project Procurement Methods in the Nigerian Construction Industry | S.O. | Civil Engineering Dimension 1 PB

... defined procurement method as the management of the total process involved in construction project ...variants of procurement are available for meeting ... Lihat dokumen lengkap

7

this PDF file THE PERFORMANCE OF TRADITIONAL CONTRACT PROCUREMENT ON HOUSING PROJECTS IN NIGERIA | O. Ojo | Civil Engineering Dimension 2 PB

this PDF file THE PERFORMANCE OF TRADITIONAL CONTRACT PROCUREMENT ON HOUSING PROJECTS IN NIGERIA | O. Ojo | Civil Engineering Dimension 2 PB

... one of the basic needs of ...when the United Nations launched an aggressive campaign through the government of Nations on the need to provide shelter for ...all. ... Lihat dokumen lengkap

6

this PDF file Modeling The Influence of Project Manager Trustworthy Leadership Behavior Upon Construction Team Trust | Andi | Civil Engineering Dimension 1 PB

this PDF file Modeling The Influence of Project Manager Trustworthy Leadership Behavior Upon Construction Team Trust | Andi | Civil Engineering Dimension 1 PB

... Although the results indicate the existence of significant correlation between trust level and project completion, it is not conclusive and needs further ...consideration, construction ... Lihat dokumen lengkap

10

this PDF file Variability Analysis of Prime Cost Sums | Ikpo | Civil Engineering Dimension 1 PB

this PDF file Variability Analysis of Prime Cost Sums | Ikpo | Civil Engineering Dimension 1 PB

... lack of adequate and appropriate construction knowledge may lead to variation orders, but it is important to state that this is not usually according to an architect’s whims ...certain ... Lihat dokumen lengkap

5

this PDF file An Investigation of the Performance of Due Process Mechanism in the Execution of Construction Projects in Nigeria | J. A. | Civil Engineering Dimension 1 PB

this PDF file An Investigation of the Performance of Due Process Mechanism in the Execution of Construction Projects in Nigeria | J. A. | Civil Engineering Dimension 1 PB

... [8], procurement is the process that creates, manages and fulfils ...forms an integral part of construction projects and occurs at any point in a project cycle where ... Lihat dokumen lengkap

7

this PDF file Benchmarking the Performance of Construction Procurement Methods against Selection Criteria in Nigeria | Ojo | Civil Engineering Dimension 1 PB

this PDF file Benchmarking the Performance of Construction Procurement Methods against Selection Criteria in Nigeria | Ojo | Civil Engineering Dimension 1 PB

... and the BOOT system were ranked equally the least able to achieve cost ...ranked the least able for projects up to N100 million ...compromised in design-build projects particularly when ... Lihat dokumen lengkap

7

this PDF file SEISMIC RISK ASSESSMENT OF LEVEES | Rosidi | Civil Engineering Dimension 4 PB

this PDF file SEISMIC RISK ASSESSMENT OF LEVEES | Rosidi | Civil Engineering Dimension 4 PB

... to the ground surface as well as those that do not ...characterization of uncertainties in source para- meters and ground motion attenuation models is important in a PSHA; they can be ... Lihat dokumen lengkap

7

this PDF file Professor Joseph Andy Soesilo  Founder of Jurnal Dimensi  predecessor of Civil Engineering Dimension journal | Hardjito | Civil Engineering Dimension 2 PB

this PDF file Professor Joseph Andy Soesilo Founder of Jurnal Dimensi predecessor of Civil Engineering Dimension journal | Hardjito | Civil Engineering Dimension 2 PB

... Role of Municipal WWTPs in Arizona’s Water Conservation’ in the coming ‘The Fifth Euro Asia Civil Engineering Forum’ (EACEF -5) conference, to be held at Petra Christian ... Lihat dokumen lengkap

1

this PDF file A Potential Cement Replacement Material | M.F. | Civil Engineering Dimension 1 PB

this PDF file A Potential Cement Replacement Material | M.F. | Civil Engineering Dimension 1 PB

... that the concrete strength is affected by the percentage of mud ...10% of mud reacted well with the mixture of mortar and depict higher compressive strength compared to all other ... Lihat dokumen lengkap

5

this PDF file Evaluation of The Impacts of VMS on Traffic Performance Measures in An Urban Area in Indonesia | Sutandi | Civil Engineering Dimension 1 PB

this PDF file Evaluation of The Impacts of VMS on Traffic Performance Measures in An Urban Area in Indonesia | Sutandi | Civil Engineering Dimension 1 PB

... points in the network such as heavily congested roads, or to make travellers aware of non- recurring congestion such as special events or incidents ...[7]. The application of VMS ... Lihat dokumen lengkap

7

this PDF file Creep Behaviour of Fly AshBased Geopolymer Concrete | S.E. | Civil Engineering Dimension 1 PB

this PDF file Creep Behaviour of Fly AshBased Geopolymer Concrete | S.E. | Civil Engineering Dimension 1 PB

... binds the aggregates to form geopolymer concrete. This paper presents the study of creep behaviour of fly ash-based geopolymer ...series of specimens with various compressive ... Lihat dokumen lengkap

6

this PDF file Numerical Simulation of ThreatIndependent Progressive Collapse | E. | Civil Engineering Dimension 1 PB

this PDF file Numerical Simulation of ThreatIndependent Progressive Collapse | E. | Civil Engineering Dimension 1 PB

... for the primary and secondary structural components in the form of Demand Capacity Ratio ...determined in a component or connection/joint (moment, axial force, shear, and possible ... Lihat dokumen lengkap

8

this PDF file The Influence of Seismic Parameters on Site Response | Asakereh | Civil Engineering Dimension 2 PB

this PDF file The Influence of Seismic Parameters on Site Response | Asakereh | Civil Engineering Dimension 2 PB

... utilization of time history that employs motion parameters such as: acceleration, velocity, displacement, or all of these ...one of these parameters is measured directly and the other ... Lihat dokumen lengkap

12

this PDF file The Responses of Road Users on Safety Riding Campaign in Surabaya | Gde Kartika | Civil Engineering Dimension 1 PB

this PDF file The Responses of Road Users on Safety Riding Campaign in Surabaya | Gde Kartika | Civil Engineering Dimension 1 PB

... step of this research is simultaneously doing both the internet browsing to find instant responses in website and distributing the trial questionnaire to various respondents regarding ... Lihat dokumen lengkap

12

this PDF file Settlement Control of Soft Ground using CementRicehusk Stabilization | CM. | Civil Engineering Dimension 1 PB

this PDF file Settlement Control of Soft Ground using CementRicehusk Stabilization | CM. | Civil Engineering Dimension 1 PB

... result of the increase in the amount of solid waste all over the globe, engineers and researchers are obliged to carry out investigations to find useful applications for such ... Lihat dokumen lengkap

8

this PDF file Mechanical Properties of Clayey Sand Treated with CementRubbershreds | C.M. | Civil Engineering Dimension 1 PB

this PDF file Mechanical Properties of Clayey Sand Treated with CementRubbershreds | C.M. | Civil Engineering Dimension 1 PB

... within the compacted soil mass was undesirable for long term performance of the road foundation, as it can permit water infiltration and eventual loosening of the soil structure with ... Lihat dokumen lengkap

6

this PDF file KrigingBased Finite Element Method: ElementByElement Kriging Interpolation | Wong | Civil Engineering Dimension 1 PB

this PDF file KrigingBased Finite Element Method: ElementByElement Kriging Interpolation | Wong | Civil Engineering Dimension 1 PB

... above, the manner of approximating the field variables in the K-FEM is “element-by- element” Kriging interpolation ...(el-KI). The previous papers on the K-FEM presented ... Lihat dokumen lengkap

8

this PDF file Volume Stability of Bitumen Bound Building Blocks | I.N.A. | Civil Engineering Dimension 1 PB

this PDF file Volume Stability of Bitumen Bound Building Blocks | I.N.A. | Civil Engineering Dimension 1 PB

... stable in various conditions. This is because of the movement that can be caused by temperature, moisture movement, creep, horizontal and vertical deflections ...changes in temperature ... Lihat dokumen lengkap

8

this PDF file CPTBased  of Pile Load Tests in ClaySilt Soil | W.A. | Civil Engineering Dimension 1 PB

this PDF file CPTBased of Pile Load Tests in ClaySilt Soil | W.A. | Civil Engineering Dimension 1 PB

... error in the tip resistance area and -6% error in the side resistance ...area. The model used 15- node triangular elements for the pile and soil ...elements. The vertical ... Lihat dokumen lengkap

9

this PDF file Application of Prefabricated Vertical Drain in Soil Improvement | B. | Civil Engineering Dimension 1 PB

this PDF file Application of Prefabricated Vertical Drain in Soil Improvement | B. | Civil Engineering Dimension 1 PB

... shown in Figure 9.a. Total settlement at 10 and 20 m deep from the surface was about 50% and 25%, respectively, com- pared to the settlement at the ... Lihat dokumen lengkap

6

Show all 10000 documents...