... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
123
WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
134
WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank’s threshold for ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445
... The overall progress towards achieving the PDO of increasing the effective use of selected sections of national roads along the Western Sumatra Corridor by reducing road user costs is considered moderately satisfactory. ... Lihat dokumen lengkap
161
WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
... Dec 2015). b) Based on CTC survey on August 2016 was found that the shoulder widening complete until 25 Km, the embankment on side river in Start project under construction, the remaining 26 Km in ... Lihat dokumen lengkap
169
WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
131
WINRIP DOC MPR CTC MPR No.43 2016 7 20160729 00432
... Dec 2015). b) Based on CTC survey on 12 May 2016 was found that the shoulder widening complete until 25 Km, the remaining 26 Km in ...Dec 2015) was submit to PMU on firs of Feb 2016, ... Lihat dokumen lengkap
152
WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
127
WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
133
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as ... Lihat dokumen lengkap
157
WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
138
WINRIP DOC MPR CTC MPR No.31 2015 07 20150731 00278
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost of more than US$ 25 Million to comply with the new Bank s threshold for ... Lihat dokumen lengkap
149
WINRIP DOC MPR CTC MPR No.6 2013 06 2013 06 12 00225.
... . CTC checked the following current situation for: (i) road existing condition, (ii) status of land to be acquired, (iii) estimate of land square will be affected by project, and (iv) type of land asset affected ... Lihat dokumen lengkap
100
WINRIP DOC MPR CTC MPR No.48 2016 12 2016 12 30 00442
... on CTC survey on August 2016 was found as follows : a)Land acquisition problems, PAPs not agreed to release their properties, some squater not yet move, b) water pipes belonging was cross the road pavement, ... Lihat dokumen lengkap
173
WINRIP DOC MPR CTC MPR No.27 2015 03 2015 03 31 00224.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
150
WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
130
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
73
WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
136
WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
... December 2015) has been submit to PMU & WB on 14 Dec 2015, d) The HIV-AIDS campaign complete on 17 Nov ...Law No.23 year 2014), SOCIAL: (1) PMU/CTC has been coordinate with PPK, and ask LG ... Lihat dokumen lengkap