WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti- Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
82
WINRIP DOC MPR CTC MPR No.11 2013 11 2013 11 11 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.9 2013 09 2013 09 09 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
90
WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
117
WINRIP DOC MPR CTC MPR No.8 2013 08 2013 08 09 00225.
... The CTC technical review team(senior highway engineer, senior road safety auditor, highway engineer) visited 1 project sites in North Sumatra in order to finalize about identify major issues in aspect of highway ... Lihat dokumen lengkap
85
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) will apply to the packages with the construction estimated cost more ... Lihat dokumen lengkap
73
WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ...next 4 ICB subprojects qualification still used ... Lihat dokumen lengkap
131
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ...next 4 ICB subprojects qualification still used ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.40 2016 4 20160430 00383
... Activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural ... Lihat dokumen lengkap
145
WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
... a) Take over certificate at 20 January 2016. a)Status on Feb 2016 are: the quarry, AMP & Stone Crusher permits from Bupati, (the quarry owner & contractor not yet make changes the permission (Bupati to Governor ... Lihat dokumen lengkap
169
WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank s threshold for ...next 4 ICB subprojects qualification still used ... Lihat dokumen lengkap
140
WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
... To date, ten (10) sub-project are currently on-going construction implementation by different Contractors. Four (4) contracts are under AWP-1, four (4) are in AWP-2 and two (2) is covered by AWP-3. ... Lihat dokumen lengkap
143
WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost of more than US$ 25 Million to comply with the new Bank s threshold for ...next 4 ICB subprojects qualification still used ... Lihat dokumen lengkap
157
WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
148
WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... Ref. WINRIP/136 will apply to the packages with the construction estimated cost more than US$ 25 Million to comply with the new Bank’s threshold for ...next 4 ICB subprojects qualification still used Pre- ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.38 2016 2 20160229 00347
... Activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural ... Lihat dokumen lengkap
150
WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
... To date, seven (7) sub-project are currently on-going construction implementation by different Contractors. Four (4) contracts are under AWP-1, two (2) are in AWP-2 and one (1) is covered by AWP-3. Activities done ... Lihat dokumen lengkap
138
WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.12 2013 12 2013 12 10 00225.
... for WINRIP on 20th December 2013, at the Ministry of Public ...and 4 which is road sector institutional development and contingency for disaster risk response in aspect of road ... Lihat dokumen lengkap
114