• Tidak ada hasil yang ditemukan

RSPO Certification and Audit Details for Teluk Siak POM

N/A
N/A
Protected

Academic year: 2024

Membagikan "RSPO Certification and Audit Details for Teluk Siak POM"

Copied!
68
0
0

Teks penuh

SPO – 4006a.7 Page 1 Opgestel deur Mutuagung Lestari vir Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Bladsy 2 Opgestel deur Mutuagung Lestari vir Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Figure 2. Operational Map of PT Aneka Inti Persada
Figure 2. Operational Map of PT Aneka Inti Persada

SCOPE OF THE CERTIFICATION ASSESSMENT

Assessment Standard Used

Organisation Information

Type of Assessment

Locations of Mill and Plantation

Teluk Siak Estate Dorp van Meredan, subdistrict van Tualang, district Siak, provincie Riau. Landgoed Aneka Persada Dorp Meredan, subdistrict Tualang, district Siak, provincie Riau.

Description of Area Statement

SPO – 4006a.7 Faqe 5 Persiapan Mutuagung Lestari untuk POM Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Planting Year and Cycles

SPO – 4006a.7 Halaman 6 Disiapkan oleh Mutuagung Lestari dari PKS Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Description of Mill and Supply Base

Estimate Tonnage of Certified Product

SPO – 4006a.7 Faqe 7 Persiapan Mutuagung Lestari untuk POM Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Other Certifications

Time Bound Plan

SPO – 4006a.7 Pagina 8 Opgesteld door Mutuagung Lestari van Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Pagina 9 Opgesteld door Mutuagung Lestari van Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

ASSESSMENT PROCESS

Assessment Team

Assessment Methodology, Assessment Process and Locations of Assessment

Interviews with operational staff and employees related to the rotation and the host plant maintenance techniques. Observations related to the processing of FFB into crude palm oil (CPO), the implementation of OHS and emergency response equipment, efforts to manage the environmental impact (air quality testing site, noise and vibration) and the mechanism of mass balance supply chain model (Maintenance with weighbridge operator and person in charge implementing the supply chain system).

Stakeholder Consultation and Stakeholders Contacted

Determining Next Assessment

SPO – 4006a.7 Pagina 13 Opgesteld door Mutuagung Lestari van Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Pagina 14 Opgesteld door Mutuagung Lestari van Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

ASSESSMENT FINDINGS

Summary of Assessment Report of the RSPO Certification

The results of the public consultation with the Siak County Agency stated that the company has submitted to the Department which documents are accessible to the public. The company has indicated in the work plan of the Long-Term Work Plan document of PT Aneka Inti Persada for the period 2015-2020. The company has not been able to show the results of the latest soil analysis in accordance with the standard operating procedures that have been put in place.

Based on the test results for the periods April - June 2015, it should be noted that the BOD parameters still meet the quality standards laid down in the regulations. The company has demonstrated results of pest counts that have been carried out regularly in recapitulation documents of the plant counts in each plant block. Maintenance of the HCV area which is local community identity (signboard installation and cleaning of the area around the grave, attached photographs).

The company could not show the records of the communication meetings with the interested parties, as well as the further results of the meeting. The company keeps documentation on exercising the rights of female employees regarding menstrual leave and maternity leave either in POM or on the property. We received all employees through the recruitment process in accordance with company rules.

Land compensation in the process was carried out in the first days of the opening of the garden. There is no sign of fire used in the process of clearing land for replanting in the area.

Summary of Assessment Report of Supply Chain Requirements

SPO – 4006a.7 Page 41 Prepared by Mutuagung Lestari fof Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Page 42 Prepared by Mutuagung Lestari fof Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd) . if physical separation is used) and volume sales of RSPO-certified products. The following table of CPO and PK produced by Teluk Siak POM from October 2014 to 19 August 2015 (Implementation of Monitoring 4).

SPO – 4006a.7 Hal 43 Disiapkan oleh Mutuagung Lestari dari PKS Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). Seluruh TBS yang diproses di PKS Teluk Siak berasal dari PT Aneka Inti Persada (Teluk Siak Estate, Aneka Persada Estate, Pinang Sebatang Estate). SPO – 4006a.7 Hal 44 Disiapkan oleh Mutuagung Lestari dari PKS Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Manajemen PKS Teluk Siak - PT Aneka Inti Persada berkomitmen memberikan informasi kepada PT Mutuagung Lestari jika terdapat kelebihan produksi CPO dan Inti Sawit. SPO – 4006a.7 Hal 45 Disusun oleh Mutuagung Lestari dari PKS Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). POM Teluk Siak - PT Aneka Inti Persada memiliki Laporan Bulanan produk bersertifikat RSPO (TBS, CPO dan PK).

Conformity Checklist of Certificate and Logo Use

The site will record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO and PK on a quarterly basis. The site will ensure and verify through documented procedures and registration that the RSPO certified oil palm product is kept separate from non-certified material, including during transport and storage. All products are received and processed (FFB) in Teluk Siak. POM comes from its own estate, which is RSPO certified.

So far Teluk Siak factories do not accept or process FFB from other sources, based on the existing documents and the systems that have been implemented which consisted of FFB Delivery Document, Weighing Tickets, Sales Contract and SIME Weighing Application Program which explains origin of FFB. (Partition, harvest block, planting year, herd number) as well as CPO and PK product is a 100% certified product (RSPO Certified). All documents related to the reception and processing systems are marked (Seal) Certified RSPO. Based on verification of documents and field visits to Teluk Siak POM and interviews with officers and scale officer, it is known that Teluk Siak POM processes FFB in CPO and PK which is 100% derived from its own property.

The results of the sales contract and invoice verification document show that all CPO and PK products have been shipped/sold 100%. SPO – 4006a.7 Page 46 Prepared by Mutuagung Lestari fof Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Page 47 Prepared by Mutuagung Lestari fof Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Summary of RSPO Partial Certification

SPO – 4006a.7 Page 48 Prepared by Mutuagung Lestari fof Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). Available EIA documents as approved by the Central EIA Committee write the Department of Forestry and Plantations, No: 242/Menhutbun-II/2000, on 23 March 2000. The company has conducted studies of social impact, but until the implementation of Phase - 1 is still in draft form.

Based on the Plantation Development Realization Report of the socialization of new land opening conducted in July to September 2010 for Bonti and Kembayan Sub-districts, and the unit conducted socialization of new land opening in March 2011 (Sedae, Canal, Mua, Kampuh, and Tapa sub-villages). Based on interviews with residents of RT Pinsam, the company's new plantation opening process also involved the Satlak team consisting of Sub-village chiefs, indigenous leaders, KUD Sekayam Jaya Manager and village officials as officials who perform verification of the land which will be opened. Documented process and agreement of land acquisition for new plantation area is maintained in MAS 3 Estate office and RSPO secretariat office in MAS 1 Estate.

SPO – 4006a.7 Hal 49 Disiapkan oleh Mutuagung Lestari untuk PKS Teluk Siak – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Identification of Findings, Corrective Action, Observations, OFI and Noteworthy Positive Components

SPO – 4006a.7 Page 50 Prepared by Mutuagung Lestari for Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). The 2015 management unit should be able to demonstrate evidence of nettle caterpillar control activities (above the economic threshold) and monitoring. SPO – 4006a.7 Page 51 Prepared by Mutuagung Lestari for Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

SPO – 4006a.7 Pagina 52 Opgesteld door Mutuagung Lestari voor Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Pagina 53 Opgesteld door Mutuagung Lestari voor Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Pagina 54 Opgesteld door Mutuagung Lestari voor Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

PT AIP must be able to show evidence of stakeholder meetings, as well as follow-up records made in response to stakeholder input. SPO – 4006a.7 Page 55 Prepared by Mutuagung Lestari for Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Page 56 Prepared by Mutuagung Lestari for Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Summary of Arising Issues from Public, Management and Auditor Response

The company's assistance to local communities, for example helping with sacrifices during the Eid holiday. Communication between the company and the village government and the surrounding community has been going well. Based on the verification of the documents, the company has tried to fulfill its obligations, first of all with the regular reporting of the Plantation Business Development Report to the relevant agencies.

The company has not submitted environmental documents related to the replanting program currently underway. The company has fulfilled its obligations regarding the payment of minimum wages in accordance with the Regent Siak Decree 2015 IDR. The company has all its employees included in social security at work and occupational health insurance programs (Social Assurance / BPJS).

From the results of the document verification and interviews with several employees, there are issues related to the labor dispute between the company and the employees, and the awarding was carried out in accordance with the applicable standards of the minimum wage regulations. A review of the completion of works carried out by the company in accordance with the specifications set out in the agreed contract. For the future, maybe we could continue to establish a good cooperation with the company.

CERTIFIED ORGANISATION’S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY

SPO – 4006a.7 Stran 63 Pripravil Mutuagung Lestari za Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd). SPO – 4006a.7 Stran 64 Pripravil Mutuagung Lestari za Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd) PRILOGE. SPO – 4006a.7 Stran 65 Pripravil Mutuagung Lestari za Teluk Siak POM – PT Aneka Inti Persada (Sime Darby Plantation Sdn Bhd).

Formal Sign-off of Assessment Findings

List of Stakeholder Contacted in the RSPO Certification Process

Assessment Program

Gambar

Figure 2. Operational Map of PT Aneka Inti Persada

Referensi

Dokumen terkait

885 SIME DARBY Palntation Berhad PAGOH POM 2.133 102.7343 SIME DARBY PLANTATION SDN BHD Malaysia Negeri Sembilian 886 SIME DARBY PLANTATION Berhad SARAWAK 3.1902 113.087 SIME

SPO – 4006a.5 Page 31 Prepared by Mutuagung Lestari for Rantau POM – PT Laguna Mandiri SIME DARBY Plantation Sdn Bhd Record of employees training in form of documentation of official

PT MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT RSPO – 4006a/1.0/26072018 Page 4 Prepared by Mutuagung Lestari for Angsana POM – PT Ladangrumpun SuburabadiI Sime Darby Plantation

PT MUTUAGUNG LESTARI PUBLIC ANNOUNCEMENT SPO – 4009 Page 1 of 3 Date: 04 February 2022 Notification of RSPO Initial Certification Nilo POM 1, PT Adei Plantation & Industry

MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT RSPO – 4006a/1.0/26072018 Page 4 Prepared by Mutuagung Lestari for Manggala POM – PT Tunggal Mitra Plantation subsidiary of Sime Darby

SPO – 4006a.7 Page 6 Prepared by Mutuagung Lestari for Kilang Sawit Chini 3 – Felda Palm Industries Sdn Bhd Felda Global Ventures Holdings Bhd BOB : Barn Awl Boxes IPM : Integrated

RSPO – 4006a/1.0/26072018 Page 94 Prepared by Mutuagung Lestari for Rantau POM – PT Laguna Mandiri Sime Darby Plantation Bhd Assessor Evaluation and Conclusion filled by auditor:

SPO – 4006a.7 August 2016 Page 63 Prepared by Mutuagung Lestari for ANJA Siais POM – PT ANJA Siais, PT Austindo Nusantara Jaya Agri Non-Conformance Description & Evidence observed