WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.8 2013 08 2013 08 09 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti- Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
85
WINRIP DOC MPR CTC MPR No.9 2013 09 2013 09 09 00225.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
90
WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
134
WINRIP DOC MPR CTC MPR No.7 2013 07 2013 07 12 00225.
... In order to identify the recommendation and comments of the technical and road saftety review for Drawings and Cost Estimation for Re-design, There is held 3 rd presentation for the Technical review Package No.5 ... Lihat dokumen lengkap
54
WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
... 1st 2014, technical design and road safety engineering review and road safety audit which is AWP-2 and AWP-3 sub-projects has been ...June 2014, RSA audit for Seblat – Ipuh (Package #16) and road safety ... Lihat dokumen lengkap
123
WINRIP DOC MPR CTC MPR No.49 2017 01 20170131 00445
... neat no occur land , but inspection on Sep 2016 drum is not stored and there has been a bit of oil and diesel fuel contamination, 19 electricity pole in 25 Km ...package No.13 but the contractor has ... Lihat dokumen lengkap
161
WINRIP DOC MPR CTC MPR No.6 2013 06 2013 06 12 00225.
... . CTC checked the following current situation for: (i) road existing condition, (ii) status of land to be acquired, (iii) estimate of land square will be affected by project, and (iv) type of land asset affected ... Lihat dokumen lengkap
100
WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
... WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the construction supervision of all the works programs will be performed by the same DSC team. In parallel with the instruction to speed up ... Lihat dokumen lengkap
136
WINRIP DOC MPR CTC MPR No.2 2013 02 2013 02 11 00225.
... on 13 January ...the CTC accompanied the Bank’s Social Expert and Environmental Specialist visiting the site to: (i) check compensation payment for the Project Affected People (PAP), (ii) check the LARAP ... Lihat dokumen lengkap
79
WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
148
WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
... Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
... The CTC assignment concerns the monitoring of the aspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro-active in resolving issues when such a matter ... Lihat dokumen lengkap
117
WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.
... the CTC mobilization, the DSC has not been established ...The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and ...the ... Lihat dokumen lengkap
82
WINRIP DOC MPR CTC MPR No.12 2013 12 2013 12 10 00225.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
114
WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
... The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical ... Lihat dokumen lengkap
127
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... October 2014 are listed in Table ...Amendment No. 1 and temporarily demobilized on March 2014, however, he will be remobilized for two (2) months period under Amendment ...11-28, 2014 to ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.
... The activity on the Community Representative Observers (CROs) during July 2014 was carried out the selection of CRO for Package 17: Simpang Gunung Kemala Pugung Tampak, Lampung Province on July 17, 2014. ... Lihat dokumen lengkap
131