• Tidak ada hasil yang ditemukan

Roundtable on Sustainable Palm Oil Certification R S P O

N/A
N/A
Protected

Academic year: 2024

Membagikan "Roundtable on Sustainable Palm Oil Certification R S P O"

Copied!
86
0
0

Teks penuh

PT SMART Tbk) 2012 Batu Ampar Estate 2012 South Kalimantan Certificeret Batu Mulia Estate 2012 South Kalimantan Certificeret. Sungai Panci Estate 2012 South Kalimantan Certificeret Sungai Panci KKPA 2012 South Kalimantan Certificeret Tanah Laut Mill.

Figure 1. Location Map of PT Ramajaya Pramukti
Figure 1. Location Map of PT Ramajaya Pramukti

Assessment Methodology, Assessment Process and Locations of Assessment .1 Figure of person days to implement assessment

Locations of Assessment

Observation regarding handling of petroleum and agrochemical material and waste, MSDS, emergency response facilities and types of pesticides used. Observation regarding handling of agrochemical material and waste, safety data sheet, emergency response devices and types of fertilizers used.

Stakeholder Consultation and Stakeholders Contacted .1 Summary of stakeholder consultation process

Determining Next Assessment

ASSESSMENT FINDINGS

Summary of Assessment Report of the RSPO Certification

As stated in the communication book, there is no letter requesting information regarding the operation of the estate and the mill. These documents can also be accessed by the public through a mechanism established by the company.

There is compliance with all applicable local, national and ratified international laws and regulations

Based on an interview with the local contractor, it is known that the company has spread the policy of standard behavior. Based on interviews with employees and trade unions, representatives of gender committees are aware of the integrity code and ethical behavior.

There is an implemented management plan that aims to achieve long term economic and financial viability

For the smallholder scheme of Amarta Jaya Plasma, the land ownership status of the smallholder scheme is individual land title certificate (SHM) issued by the government program namely "transmigration program" since 1991.

Based on document verifications, the certificate holder has carried out fertilization with inorganic fertilizers, POME and FFB mulching. The certificate holder has routinely monitored the changes in nutrient status based on the regular Soil Sampling Unit (SSU) and Leaf Sampling Unit (LSU) analysis to determine fertilizer recommendation. Based on field observation and document review, it is known that POME land application, EFB mulching application and oil palm trunk chipping have been carried out in accordance with the procedure.

Meanwhile on AJYP, based on semi-detail soil surveys of PMNP 2017, and based on soil map with scale, it is known that there is no peat soil at AJYP area. Based on field observation on blocks visited during audit, the topography was generally relatively flat.

Based on document review and field observation, CH installed 10 erosion stakes in block D-26 Division 5 of RRME and implemented from January to September 2018, located on the palm circle, between rows and harvest paths. Based on field observations in RRME and AJYP, main and collector roads were in good condition, paved, suitable for FFB transportation or maintenance activities. Field observation at Ramarama POM showed that palm oil mill effluent is managed in a wastewater treatment plant before being distributed to RRME as land application.

Related application for palm oil mill effluent, company shows land application permit based on Kampar Regent Capital Investment Board No. 503/DPM-PTSP.PEL/LA/2017/14, valid until 2022. Ramarama POM has demonstrated compliance with regard to this pit application based of current permit, for example, regular POME tests and annual soil tests on land application areas.

Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated Pest Management techniques

Based on observation of operational activities at Rama Rama Mill, Rama Rama Estate and Amarta Jaya Plasma, it is known that workers have received training and are able to demonstrate safe work practices in accordance with procedures. Until ASA 1.3, there are no changes related to the development of operational areas of the estate, expansion of mill capacity, etc. Identification of HCV and interview with relevant stakeholders (Sekiang villages and smallholders of the scheme) showed that there are no RTE species present in the vicinity of the company.

Field visit on Workers housing RRME and RRMM also found that there are no RTE / wild species reared by workers. Field visit during audit and document review indicated that there are replanting activities on Ramarama Estate and Amarta Jaya Plasma.

Production t/yr

Field visits to the mill showed that the husk and fiber have been used as boiler fuel, therefore reducing the use of diesel fuel for electricity. Effluent has also been monitored monthly and the July-September 2019 monitoring period showed that all effluent test parameters are in compliance with the standard quality (see indicator 4.4.3). Meanwhile, the company also conducts regular emission test for semester basis, test results from 1st semester 2019 indicate that boiler emission for examples have been met with standard quality.

Monitoring of emissions and pollutants (air emission, air environment, odor, noise and vibration) from estate and factory was carried out periodically every 6 months. The test result of the first semester of 2019 indicates that all parameters related to emissions still meet the standard quality, except noise level. The monitoring was carried out to evaluate the management plan implemented by the management unit.

KER 5.70

Aspects of plantation and mill management, including replanting, that have social impacts are identified in a participatory way, and plans to mitigate the negative impacts and promote the positive ones are made,

Based on interviews with stakeholders, we obtained information that the SIA and the management and monitoring plan were implemented in a cooperative manner with all affected villages. Discussion with the local community obtained information that there are no complaints regarding the social management that has been carried out. Based on the interview with the village community, they will send a letter to the company if they need information.

Based on interviews with workers in mills and property, as well as information from the union and gender committees of these units, it was known that all complaints and grievances have been satisfactorily answered by the management unit directly or less than a month officially. Based on interviews with property and mill workers as well as information from the union and gender committees of these units, it was known that all grievances and complaints have been satisfactorily answered by the management unit directly and there were no significant issues to be followed up.

Pay and conditions for employees and for employees of contractors always meet at least legal or industry minimum standards and are sufficient to provide decent living wages

  • and 6.6.2
  • and 6.8.2

Based on an interview with the gender committee, no cases of sexual abuse have been reported in the past year. Based on an interview with the employee, they understand the complaints mechanism and there is no complaint from them. Based on field observation and interviews with KUD employees Makmur Lestari and Sibuak Jaya, it is known that there is no evidence of forced labor at the cooperative.

Based on interviews with landowners, the harvest worker is from their family (except wife and children). Based on interviews with workers who know that the company has regularly socialized company policies, including human rights policies.

Extensive planting on steep terrain, and/or on marginal and fragile soils, is avoided

Soil surveys and topographic information are used for site planning when establishing new plantings, and the results are incorporated into plans and operations. Till the time of ASA-1.1 revision PT Ramajaya Pramukti – Rama Rama scope of POM has not opened new lands. The results of the document review, field visits and interviews showed that CH has not expanded or made new plantings since the last assessment (2018).

New plantation developments are designed to minimise net greenhouse gas emissions

Growers and millers regularly monitor and review their activities and develop and implement action plans that allow for continuous visible improvements in key operations. There was evidence regarding the implementation of the policy, such as regular registration, planting useful plants and installing barn owl boxes. IPM is carried out quite effectively, so there is no chemical use for pest control, except for routine weed control.

OHS and Employment Aspects

Environment aspect

RSPO Internal Audit

  • Summary of Assessment Report of Supply Chain Requirement .1. General chain of custody requirements for the supply chain
  • Applicability of the general chain of custody requirements for the supply chain .1
  • Documented procedures .1
  • Purchasing and goods in .1
  • Registration of transactions .1
  • Conversion factors .1
    • Module E – CPO Mills: Mass Balance Requirements

The Mill was a certified palm oil mill that implemented Mass Balance using Module E-CPO Mill for its supply chain models. The Mill was a certified palm oil mill that implemented only one module, namely Mass Balance using Module E-CPO Mill for its supply chain models. The site must have written procedures and/or work instructions or equivalent to ensure the implementation of all elements of the applicable specified supply chain model.

The mill has an RSPO product mass balance model document for the supply chain no. The organization must provide adequate training for personnel performing tasks critical to the effective implementation of standard supply chain certification requirements.

Definition .1

All requirements for a proper supply chain are met by the factory, such as certified valuation product already registered on the RSPO IT platform and including completed transaction records and stock transaction data during the 12 months prior to valuation. The mill has carried out the SCCS mechanism such as Palm Trace declaration of RSPO CSPO and CSPK sold as certified and confirms shipment notification as well as removal of certified stock for products sold as other schemes or as non-certified/conventional. However, the CSPK was sold as another scheme that had not been removed yet, due to the procedure stated that the announcement or removal was made before the license expiration date.

Documented procedures .1

The results of the observation and interviews with the insurance and the scale operator showed that the workers already know the duties and responsibilities of each in the implementation of the SCCS. "Certified Product Code" or "Certified Supply Base" is authorized online in SAP "System Analysis and Scheduled".

Purchasing and goods in .1

  • Conformity Checklist of Certificate and Trademark Use
  • Evidence of permission or approval certificate and Trademark from Certification
  • Implementation of certificate and Trademark used by Client comply with size and
  • Implementation of Certificate and Trademark is not used on product X or√
  • Controlling of Certificate and Trademark, including withdrawing inappropriate
    • Summary of RSPO Partial Certification
    • Un-Certified Units or Holdings
    • Identification of Findings, Corrective Action, Observations, Opportunity for Improvement and Noteworthy Positive Components
    • Summary of Arising Issues from Public and Auditor Verification
    • CERTIFIED ORGANISATION'S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY

The company has fulfilled the development of plasma plantations in accordance with the SK CPCL (Decree of Potential Small Farmers) of the Regent. There were no problems or events related to environmental pollution that occurred in the company's area. The company has implemented rules on minimum wage, overtime payment and has a collective agreement according to the authorities' rules, this is further explained in indicators 6.5.1 and 6.5.2.

During the past year, there were no issues related to human rights violations, sexual harassment, child labor and discrimination occurring in the company's scope of operations. Payment for completion of work is made on time by the company in accordance with what is written in the employment agreement. The Company has implemented minimum wages and other labor regulations in accordance with applicable regulations and is explained in the 2.1.1 and 6.5.1 indicators.

The Gender Committee is still active in the company until the audit is carried out.

Gambar

Figure 1. Location Map of PT Ramajaya Pramukti
Figure 2. Operational Map of PT Ramajaya Pramukti

Referensi

Dokumen terkait

APAR : Fire Extinguisher Alat Pemadam Api Ringan ASA : Annual Surveillance Assessment BOD : Biochemical Oxygen Demand BPS : Badan Pusat Statistik Central Bureau of Statistic BPJS :

ASA : Annual Surveillance Assessment BOB : Barn Owl Box BPJS : Badan Penyelenggara Jaminan Sosial Social Assurance of Labor CITES : The Convention on International Trade in Endangered

201/HK/V/2016, ladder; 16 May 2016, regarding the environmental permit for oil palm plantation activities of PT SOCFINDO Indonesia Kebun Lima Puluh, • Approval of environmental

ASA : Annual Surveillance Assessment BPJS : Badan Penyelenggara Jaminan Sosial / Social Security Agency CD : Community Development CH : Certificate Holder CPO : Crude Palm Oil CSPK

ARM : Agriculture Reference Manual NCR : Non Conformance Report ASA : Annual Surveilance Assessment NPP : New Planting Procedure BOB : Barn Owl Box BOD : Biological Oxygen Demand

Scope Name of Management Organisation : Stabat POM – PT Langkat Nusantara Kepong, subsidiary of Kuala Lumpur Kepong Bhd Plantation Name : Gohor Lama Estate, Bekiun Estate,

RSPO – 4006a/1.0/26072018 Page 5 Prepared by Mutuagung Lestari for Kendawangan POM – PT Gunajaya Karya Gemilang, Bumitama Agri Ltd ASA : Annual Surveillance Assessment BGA : Bumitama

MUTUAGUNG LESTARI RSPO ASSESSMENT REPORT ASA : Annual Surveillance Assessment BPJS : Badan Penyelenggara Jaminan Sosial / Social Security Agency CB : Certification Body CH :